Item 4DItem 4D
Approve Change Order No. 3 with Barson Utilities for the water and sanitary sewer relocations on FM1709 for the median and deceleration lane project in the amount of $40,177.80
Requested Action
Approve Change Order No. 3 with Barson Utilities for the water and sanitary sewer relocations on FM1709 for the median and deceleration lane project in the amount of $40,177.80
FM1709 Medians and Deceleration Lanes
Site Location
Change Order No. 3 includes:
includes the installation of a 6-ft wrought iron fence along Southlake Boulevard.
the cost for repair of the 20-inch water line along the north side of Southlake Boulevard at Shady Oaks and a 20” valve.
FM1709 Medians and Deceleration Lanes
Previous Contract Amount $551,380.25
Proposed Change Order No. 6 $40,177.80
Total Contract Amount $591,558.05
Funds for construction of the fence are available in the 1999 Traffic Management Bond fund.
Funds for the repair of the 20-inch water line are available in the Public Works operating budget.
FM1709 Medians and Deceleration Lanes
Questions?