Loading...
Item 4DItem 4D Approve Change Order No. 3 with Barson Utilities for the water and sanitary sewer relocations on FM1709 for the median and deceleration lane project in the amount of $40,177.80 Requested Action Approve Change Order No. 3 with Barson Utilities for the water and sanitary sewer relocations on FM1709 for the median and deceleration lane project in the amount of $40,177.80 FM1709 Medians and Deceleration Lanes Site Location Change Order No. 3 includes: includes the installation of a 6-ft wrought iron fence along Southlake Boulevard. the cost for repair of the 20-inch water line along the north side of Southlake Boulevard at Shady Oaks and a 20” valve. FM1709 Medians and Deceleration Lanes Previous Contract Amount $551,380.25 Proposed Change Order No. 6 $40,177.80 Total Contract Amount $591,558.05 Funds for construction of the fence are available in the 1999 Traffic Management Bond fund. Funds for the repair of the 20-inch water line are available in the Public Works operating budget. FM1709 Medians and Deceleration Lanes Questions?