Item 4BCITY OF SOUTH LADE MEMORANDUM (November 2, 2010) To: Shana Yelverton, City Manager From: Robert H. Price, P.E., Director of Public Works Subject: Award construction contract to Ed Bell Construction in the amount of $6,892,561.81 for paving, drainage and utility improvements for North Kimball Avenue from State Highway 114 to Dove Road Action Requested: Award construction contract to Ed Bell Construction in the amount of $6,892,561.81 for paving, drainage and utility improvements for North Kimball Avenue from State Highway 114 to Dove Road. Background Information: The Capital Improvements Program (CIP) includes funds for the North Kimball Avenue project from SH114 to East Dove Road within the City. Kimley -Horn and Associates, Inc. has designed and prepared construction plans for the project. This project includes the widening of North Kimball Avenue from SH114 to East Dove Road from a 2 -lane asphalt roadway to a 4- lane divided concrete roadway, as approved by the Council in the Master Thoroughfare Plan. Approximately 6,100 linear feet of 12 -inch water line and 3,200 linear feet of 8 -inch sanitary sewer improvements will be constructed along North Kimball Avenue from SH114 to Dove Road to comply with the City's water and wastewater master plans. Also included in the project are 5,000 linear feet of storm drain, 2 culvert crossings, 6 -foot sidewalks on either side of the roadway, landscaping and irrigation, decorative hardscape, concrete retaining walls and screening walls. Five (5) bids were received on October 19, 2010. The bids have been reviewed by Kimley -Horn and Associates, Inc. and the City Staff and are tabulated as follows: BIDDER BID AMOUNT Ed Bell Construction Company $6,892,561.81 North Texas Contracting, Inc. $7,347,447.00 Tiseo Paving $7,353,656.50 AUI Contractors $7,669,285.50 Glenn Thurman, Inc. $7,924,301.75 The project time for Kimball Avenue is set in contract documents as 450 calendar days (15 months), and construction of the roadway will be phased. Phase 1 will be from SH114 up to and including the intersection of Kirkwood Boulevard and shall be substantially complete by August 2011, in time for the beginning of the CISD 2011 school year. The roadway and intersection improvements along Kimball Avenue will handle the additional traffic from the new church and school on Kirkwood Boulevard. Phase 2 of Kimball Avenue, from Kirkwood Boulevard to Dove Road, is a partnership between Southlake and Grapevine in anticipation of the increased traffic due to the DFW Connector project on SH114. Once the construction along SH114 is complete, Kimball Avenue will be the easternmost exit from SH114 from which traffic will be able to access the managed lanes. A breakdown of the major project components of the bid is as follows Description Cost Paving $2,903,439.50 Drainage $767,349.03 Retaining walls $946,170.00 Traffic control and lighting $597,145.93 Water and wastewater lines $711,461.74 Enhancement package $966,995.61 Total Cost $6,892,561.81 The low bid was approximately 13% lower than the engineer's estimate of $8,000,000.00. Kimley -Horn Associates, Inc. recommends award of the contract to the low bidder, Ed Bell Construction. The City Staff concurs in this recommendation. Financial Considerations: The recommended contract award amount is $ 6,892,561.81. The current approved CIP project budget for the Southlake portion of the Kimball Avenue improvements is $6,245,000. A portion of North Kimball Avenue north of Shady Lane is within the city limits of Grapevine. The interlocal agreement between the City of Southlake and the City of Grapevine for the construction of Kimball Avenue from Shady Lane to Dove Road spells out the funding agreement between the two cities. The City of Grapevine will reimburse the City of Southlake one -half (1/2) of the cost of the construction of Kimball from Shady Lane to Dove Road, including paving, drainage, traffic signals, street lighting, landscaping, and material testing based upon the lowest responsible bid. The final participation amount shall be determined from the actual construction contract unit bid items and prices. Based on the bids received, the City of Grapevine's share of the cost is $1,204,164.00. The City of Grapevine will also reimburse the City of Southlake its share of the design cost as a percentage of the total construction cost. Grapevine's proportional share of the engineering design of the project is $158,890.00, which is approximately 17.5% of the total design cost of the project. Strategic Link: The construction of Kimball Avenue links to the city's strategy map relative to focus area of Mobility, Infrastructure, Partnerships and Volunteerism, and Performance Management and Service Delivery. The specific corporate objectives that are met by this construction project are to provide travel convenience within the City and region, to invest to provide and maintain high quality public assets, promote opportunities for partnerships and volunteer involvement and to provide high quality customer service. Citizen Input/ Board Review: N/A Legal Review: This is the standard construction services contract that has been previously reviewed by the City Attorney. Alternatives: The Council may award the contract to Ed Bell Construction or reject all bids. Supporting Documents: Location Map Recommendation Letter Bid Tabulation Staff Recommendation: Award construction contract to Ed Bell Construction in the amount of $6,892,561.81 for paving, drainage and utility improvements for North Kimball Avenue from State Highway 114 to Dove Road Staff Contact: Robert H. Price, P.E., Public Works Director Gordon J. Mayer, Jr., P.E., City Engineer Cheryl Taylor, P.E., Civil Engineer Imm =� =N �.Mm nn=in1 c 0 c� U O J pw— MM by Kimley -Horn and Associates, Inc. October 20, 2010 Mr. Gordon J. Mayer, P.E. City of Southlake 1400 Main Street, Suite 320 Southlake, Texas 76092 Re: Bid Results - North Kimball Avenue KHA No. 061237001 Dear Gordon: On October 19, 2010, the City of Southlake received bids for the North Kimball Avenue project. The following five bids were received: Contractor Base Bid Ed Bell Construction Company $6,892,561.81 North Texas Contracting, Inc. $7,347,447.00 Tiseo Paving $7,353,656.50 AUI Contractors $7,669,285.50 Glenn Thurman, Inc. $7,924,301.75 A detailed bid tabulation is attached for your review and consideration. Kimley -Horn and Associates has reviewed the low bidder's qualifications and has verified that the Contractor's bonding company is licensed in the State of Texas. Based on these reviews, it appears that Ed Bell Construction Company is the lowest responsive bidder. If you have any questions or comments, please give me a call. Very truly yours, KIMLEY -HORN A N INC. L. Nathan Ante, P.E. LNA /j 1p Enclosure K:1LAC_RoadwayW61237MITORWN Kimball Re Award Lelter.doc ■ sage 275 2201 West Royal Lane Irving, Texas 75063 -3206 ■ TEL 214 420 5600 FAX 214 420 5680 BID TABULATION CHECKED AND RECEIVED BY: BY: uU DATE: KIMLEY -HORN AND ASSOCIATES, INC. SHEET ! OF OWNER: City of Southlake BIDDER 9 BIDDER 2 BIDDER 3 JOB NO: 061237001 DATE: October 19, 2010 Ed Bell Construction Company North Texas Contracting, Inc. Tiseo Pawing Company LOCATION AND DESCRIPTION: North Kimball Avenue 10605 Harry Hines Blvd. P.O. Box 468 419 E. Hwy. 80 Dallas, TX 75220 Keller, TX 76244 Mesquite, TX 75150 Plan Item Unit Quantity Unit Price Cost Unit Price Cost Unit Price Cost Base Bid 1 MOBILIZATION LS 1 $600,000.00 $600,000.00 $525,000.00 $525,000.00 $462,500.00 $462,500.00 2 GENERAL SITE PREPARATION LS 1 $250,000.00 $250,000.00 $400,000.00 $400,000.00 $136,000.00 $136,000.00 3 UNCLASSIFIED STREET EXCAVATION CY 29,500 $3.00 $88,500.00 $14.00 $413,000.00 $6.70 $197,650.00 4 EMBANKMENT CY 12,000 $5.00 $60,000.00 $12.00 $144,000.00 $2.40 $28,800.00 5 TEMP EROS, SEDIMENT AND WATER POLLUTION CONTROL LS 1 $25,000.00 $25,000.00 $80,000.00 $80,000.00 $47,150.00 $47,150.00 6 8" REINF CONC PAVEMENT 4,000 PSI WITH INTEGRAL 6" CURB SY 45,000 $25.00 $1,125,000.00 $29.00 $1,305,000.00 $26.85 $1,208,250.00 7 LIME STABILIZED SUBGRADE (6 ") SY 47,750 $2.25 $107,437.50 $3.00 $143,250.00 $1.95 $93,112.50 8 HYDRATED LIME (42 LBSISY) TON 1,003 $135.00 $135,405.00 $165.00 $165,495.00 $146.00 $146,438.00 9 2" HMAC SURFACE COURSE (TY D) SY 1,250 $9.55 $11,937.50 $9.00 $11,250.00 $15.00 $18,750.00 10 6" HMAC SURFACE COURSE (TY B) SY 1,250 $22.95 $28,687.50 524.00 $30,000.00 $24.30 $30,375.00 11 CONCRETE DRIVEWAY APPROACH SY 2,700 $45.00 $121,500.00 $31.00 $83,700.00 $35.00 $94,500.00 12 ASPHALT DRIVEWAY SY 1,400 $27.98 $39,172.00 $28.00 $39,200.00 $29.65 $41,510.00 13 CONCRETE DRIVEWAY SY 800 $45.00 $36,000.00 $32.00 $25,600.00 $35.00 $28,000.00 14 REINF CONCRETE STREET HEADER LF 900 $10.00 $9,000.00 $14.00 $12,600.00 $10.00 $9,000.00 15 5" REINF CONC SIDEWALK (3,000 PSI) SY 7,900 $21.00 $165,900.00 $30.00 $237,000.00 $27.50 $217,250.00 16 REINF CONC SIDEWALK WITH RETAINING WALL (HT UP TO 6') SY 200 $220700 $44,000.00 $350.00 $70,000.00 $407.00 $81,400.00 17 4" CONCRETE F=LUME ADJACENT TO RETAINING WALLS SF 1,600 $6.00 $9,600.00 $5.00 $8,000.00 $5.15 $8,240.00 18 BARRIER FREE RAMP (TxDOT TYPE 1) EA 12 $750.00 $9,000.00 $1,000.00 $12,000.00 $850.00 $10,200.00 19 BARRIER FREE RAMP (TxDOT TYPE 2) EA 6 $800.00 $4,800.00 $1,000.00 $6,000.00 $850.00 $5,100.00 20 BARRIER FREE RAMP (TxDOT TYPE 7) EA 23 $750.00 $17,250.00 $1,000.00 $23,000.00 $850.00 $19,550.00 21 BARRIER FREE RAMP (TxDOT TYPE 10) EA 3 $750.00 $2,250.00 $1,000.00 $3,000.00 $850,00 $2,550.00 22 BARRIER FREE RAMPS (TxDOT TYPE 22) EA 1 $1,000.00 $1,000.00 $2,000.00 $2,000.00 $1,050.00 $1,050.00 23 MONOLITHIC MEDIAN NOSE - TYPE 1 EA 23 $400.00 $9,200.00 $1,000.00 $23,000.00 $770.00 $17,710.00 24 MONOLITHIC MEDIAN NOSE - TYPE 2 EA 7 $400,00 $2,800,00 $700.00 $4,900.00 $500.00 $3,500.00 25 4' CHAIN -LINK FENCE REPLACEMENT LF 400 $12.46 $4,984.00 $15.00 $6,000.00 $12.40 $4,960.00 26 BARBED -WIRE FENCE WITH METAL POSTS LF 400 $4.93 $1,97270 $5.00 $2,000.00 $4.90 $1,960.00 27 HOG WIRE FENCE REPLACEMENT LF 700 $8.62 $6,034.00 $4.00 $2,800.00 $8.55 $5,985.00 28 PIPE RAIL FENCE REPLACEMENT LF 300 $44.65 $13,395.00 $39.00 $11,700.00 $44.30 $13,290.00 29 CABLE FENCE REPLACEMENT LF 250 $12.25 $3,062.50 $13.00 $3,250.00 $12.15 $3,037.50 30 V STOCKADE FENCE REPLACEMENT LF 250 $14.54 $3,635.00 $15.00 $3,750.00 $14,45 $3,612.50 31 6' STONE SCREENING WALL LF 250 $124.00 $31,000.00 $260.00 $65,000.00 $420.00 $105,000,00 32 6' STOCKADE FENCE ON RETAINING WALL LF 250 $16.35 $4,087.50 $15.00 $3,750.00 $16.25 $4,062.50 33 V STONE SCREENING WALL ON RETAINING WALL LF 500 $203.00 $101,500.00 $180.00 $90,000.00 $206.00 $103,000.00 34 8' MASONRY SCREENING WALL ON RETAINING WALL LF 500 $420.00 $210,000.00 $200.00 $100,000.00 $232.00 $116,000,00 35 TEMPORARY FENCING LF 1,100 $4.00 $4,400.00 $3.00 $3,300.00 $4.00 $4,400.00 36 CONC RETAINING WALL (HT UP TO 6') SF 6,200 $54.00 $334,800.00 $$0.00 $186,000,00 $55.65 $345,030.00 37 CONC RETAINING WALL (HT > 6'-TO < 9') SF 3,000 $53.00 $159,000.00 $30.00 $90,000.00 $70.35 $211,050.00 38 CONC RETAINING WALL (HT 9'- 14 ") SF 5,400 $52.00 $280,800.00 $30.00 $162,000.00 $78.75 $425,250.00 39 PEDESTRIAN RAIL ON RETAINING WALL LF 1,600 $75.00 $120,000.00 $50.00 $80,000.00 $97.00 $155,200.00 40 TRANSMISSION TOWER WALL AND GRATE LS 1 $10,000.00 $10,000.00 $15,000.00 $15,000.00 $7,500.00 $7,500.00 41 STONE VENEER SF 20,000 $11.33 $226,600.00 $12.00 $240,000.00 $12.40 $248,000.00 421 TRAFFIC CONTROL MO 14 $30,000.00 $420,000.00 $2,000.00 $28,000.00 $39,000,00 $546,000.00 43 ADDITIONAL TEMP ASPHALT PAVEMENT (3" TY BON 6" FLEXBAS SY 2,500 $12.50 $31,250.00 $15.00 $37,500.00 $34.00 $85,000.00 BID TABULATION BY: AND RECEIVED BY: BY: DATE: w KIMLEY -HORN AND ASSOCIATES, INC. SHEET OF Unit Quantity Unit Price Cost Unit Price OWNER: City of Southlake BIDDER 1 BIDDER 2 BIDDER 3 JOB NO: 061237001 DATE: October 19, 2010 Ed Bell Construction Company North Texas Contracting, Inc. Tiseo Paving Company LOCATION AND DESCRIPTION: 10605 Harry Hines Blvd. P.O. Box 468 419 E. Hwy. 80 North Kimball Avenue Dallas, TX 75220 Keller, TX 76244 Mesquite, TX 75150 Plan Item Unit Quantity Unit Price Cost Unit Price Cost Unit Price Cost 44 4" WHITE THERMOPLASTIC LANE LINE STRIPE LF 3,600 $0.52 $1,872.00 $0.55 $1,980.00 $1.00 $3,600.00 45 8" SOLID WHITE THERMOPLASTIC TURN BAY LF 2,400 $0.99 $2,376.00 $1.00 $2,400.00 $1.40 $3,360.00 46 12" SOLID WHITE THERMOPLASTIC CROSSWALK LF 200 $2.60 $520.00 $3.00 $600.00 $2.60 $520.00 47 24" SOLID WHATE THERMOPLASTIC STOP BAR LF 180 $4.93 $887.40 $5.00 $900.00 $4,65 $837.00 48 4" SOLID DOUBLE YELLOW THERMOPLASTIC CENTER STRIPE LF 700 $1.04 $728.00 $1.00 $700.00 $2.05 $1,435.00 49 12" SOLID YELLOW THERMOPLASTIC CHEVRONS LF 50 $2.60 $130.00 $3.00 $150.00 $3,10 $155.00 50 FIRE LANE THERMPLASTIC STRIPE LF 800 $0.26 $208.00 $1.00 $800.00 $1,05 $840.00 51 SOLID WHITE THERMOPLASTIC ARROW EA 32 $77.88 $2,492.16 $100.00 $3,200.00 $105,00 $3,360.00 52 SOLID WHITE THERMOPLASTIC WORD EA 1 $103.84 $10184 $110.00 $110.00 $128.75 $128.75 53 TY II -C -R RAISED PAVEMENT MARKER (LANE LINE) EA 650 $2.39 $1,553.50 $3.00 $1,950.00 $2.65 $1,722.50 54 TY II -A -A RAISED PAVEMENT MARKER (CHEVRONS) EA 100 $2.54 $254.00 $3.00 $300.00 $2.65 $265.00 55 FURNISH AND INSTALL SIGNAGE LS 1 $15,575.56 $15,575.56 $10,000.00 $10,000.00 $12,840.00 $12,840.00 56 CONDUIT (PVC) (SCHD 40) (4 ") FOR TRAFFIC SIGNAL LF 2,400 $5.97 $14,328.00 $6.00 $14,400.00 $5.95 $14,280.00 57 GROUND BOX TY D (162922) WIAPRON FOR TRAFFIC SIGNAL EA 20 $519,19 $10,383.80 $550.00 $11,000.00 $515.00 $10,300.00 58 59 STREET LIGHT FOUNDATION CONDUIT (PVC) (SCHD 40) (2 ") FOR STREET LIGHTING EA LF 34 6,000 $758.01 $3.53 $25,772.34 $21,180.00 $799.00 $3.00 $27,166.00 $18,000.00 $755.00 $3.50 $25,670.00 $21,000.00 60 RELOCATE EX DECORATIVE STREET LIGHTISIGNAGE EA 6 $2,429.79 $14,578.74 $2,500.00 $15,000.00 $2,411.00 $14,466.00 61 PROJECT SIGN EA 2 $519.19 $1,038.38 $1,000.00 $2,000.00 $500.00 $1,000.00 62 RELOCATE EX MAILBOX EA 6 $519.19 $3,115.14 $900.00 $5,400.00 $250.00 $1,500.00 63 RECONSTRUCT EX COTSWOLD VALLEY SIGN EA 2 $4,880.35 $9,760.70 $4,000.00 $8,000.00 $5,050.00 $10,100.00 64 RELOCATE EX CHURCH SIGN WITH NEW FOUNDATION LS 1 $1,038.37 $1,038.37 $6,000.00 $6,000.00 $6,180.00 $6,180.00 65 18" RCP CLASS III LF 3,500 $45.27 $158,445.00 $50.00 $210,000.00 $33.00 $115,50070 66 24" RCP CLASS III LF 675 $54.36 $36,693.00 $70.00 $47,250.00 $43.30 $29,227.50 67 30" RCP CLASS III LF 425 $66.56 $28,288.00 $80.00 $34,000.00 $56.65 $24,076.25 68 35" RCP CLASS III LF 800 $8271 $66,168.00 $100.00 $80,000.00 $74.20 $59,360,00 69 42" RCP CLASS III LF 25 $104.46 $2,611.50 $120.00 $3,000.00 $96.85 $2,421,25 70 8'x4' RCB LF 110 $306.32 $33,695.20 $300.00 $33,000.00 $295.00 $32,450.00 71 9'x4' RCB LF 110 $342.66 $37,692.60 $330.00 $36,300.00 $330.00 $36,300.00 72 7'x3' RCB LF 220 $261.67 $57,567.40 $240,00 $52,800.00 $273.00 $60,060,00 73 8'x8' RCB LF 220 $396.66 $87,265.20 $370.00 $81,400.00 $396.55 $87,241,00 74 RECESSED CURB INLET - 10' EA 35 $2,616.69 $91,584.15 $2,500.00 $87,500.00 $2,884.00 $100,940.00 75 STANDARD CURB INLET - 10' EA 2 $2,516.70 $5,233.40 $2,500.00 $5,000.00 $2,884.00 $5,768.00 76 SURFACE GRATE INLET -2'x2' EA 4 $1,090.29 $4,361.16 $1,000.00 $4,000.00 $1,250.00 $5,000.00 77 DROP INLET -4'x4' EA 14 $2,014.44 $28,202.16 $2,500,00 $35,000.00 $2,165.00 $30,310.00 78 JUNCTION BOX -4'x4' EA 3 $2,725.72 $8,177.16 $2,500.00 $7,500.00 $3,090.00 $9,270.00 79 JUNCTION BOX -5'x5' EA 2 $3,270.87 $6,541.74 $3,000,00 $6,000.00 $3,605.00 $7,210.00 80 JUNCTION BOX -6'x6' EA 1 $4,906.30 $4,906.30 $4,500.00 $4,500.00 $5,460.00 $5,460.00 81 SAFETY END TREATMENT (TXDOT PSET -PD) EA 2 $1,090.29 $2,180.58 $1,000.00 $2,000.00 $1,240.00 $2,480,00 82 CONVERT EX DROP INLET INTO A JUNCTION BOX EA 4 $1,853.49 $7,413.96 $1,500,00 $6,000.00 $2,060.00 $8,240.00 83 CONVERT EX DROP INLET INTO RECESSED 10' CURB INLET EA 4 $2,595.93 $10,383.72 $1,000.00 $4,000.00 $2,785.00 $11,140.00 84 ADJUST EXISTING STORM DRAIN MANHOLE EA 5 $1,557.56 $7,787.80 $500.00 $2,500.00 $103.00 $515.00 85 GABION BASKET - 1'x2' CY 10 $190.02 $1,900.20 $275.00 $2,75100 $303.85 $3,038.50 86 GABION BASKET -3'x3' CY 1 100 $190.02 $19,002.00 $275.00 $27,500.00 $303.85 $30,38500 BID TABULATION CHECKEZ A�ND / RECEIVED BY: BY: (V t� DATE: KIMLEY -HORN AND ASSOCIATES, INC SHEET 3 OF Unit Quantity I e Cost Unit Price OWNER: City of Southlake BIDDER 1 BIDDER 2 BIDDER 3 JOB NO: 061237001 DATE: October 19, 2010 Ed Bell Construction Company North Texas Contracting, Inc. Tiseo Paving Company LOCATION AND DESCRIPTION: 10605 Harry Hines Blvd. P.O. Box 468 419 E. Hwy. 80 North Kimball Avenue Dallas, TX 75220 Keller, TX 76244 Mesquite, TX 75150 Plan Item Unit Quantity I e Cost Unit Price Cost Unit Price Cost 87 GABION MATTRESS CY 120 $207.67 $24,920.40 $225.00 $27, 000.00 $231.75 $27,810,00 88 UNCLASSIFIED CHANNEL EXCAVATION LS 1 $30,000.00 $30,000.00 $60,000.00 $60,000,00 $11,124.00 $11,124.00 89 TRENCH SAFETY - STORM DRAIN LF 6,085 $1.04 $6,328.40 $1.00 $6,085.00 $0.55 $3,346.75 90 8" PVC SDR 25 SANITARY SEWER LF 3,200 $33.23 $106,336.00 $57.48 $183,936.00 $35.05 $112,160.00 91 4' DIAMETER SANITARY SEWER MANHOLE EA 4 $2,907.44 $11,629.76 $5,000.00 $20,000.00 $2,678.00 $10,712.00 92 5' DIAMETER SANITARY SEWER MANHOLE EA 5 $4,672.67 $23,363.35 $5,500.00 $27,500.00 $4,740.00 $23,700.00 93 CONNECT TO EXISTING SANITARY SEWER LS 1 $2,076.74 $2,076.74 $5,000.00 $5,000.00 $515.00 $515.00 94 4" STANDARD SERVICE CONNECTION WI CLEANOUT EA 5 $519.19 $2,595.95 $500.00 $2,500.00 $465.00 $2,325.00 95 4" DEEP SERVICE CONNECTION W/ CLEANOUT EA 21 $602.26 $12,647.46 $500.00 $10,500.00 $515.00 $10,815.00 96 18" MJ PLUG VALVE W/ OP NUT, BURIED ACTUATOR EA 1 $19,028.14 $19,028.14 $20,000.00 $20,000.00 $8,755.00 $8,755.00 97 ADJUST EX. SANITARY SEWER MANHOLE EA 10 $685.33 $6,853.30 $500.00 $5,000.00 $275.00 $2,750.00 98 TRENCH SAFETY - SANITARY SEWER LF 3,200 $1.04 $3,328.00 $1.00 $3,200.00 $0.55 $1,760.00 99 12" PVC C -900 DR -18 WATER LINE LF 6,200 $39.46 $244,652.00 $66.00 $403,000.00 $38.15 $236,530.00 100 8" PVC C -900 DR -18 WATER LINE LF 500 $29.07 $14,535.00 $50.00 $25,000.00 $28.35 $14,175.00 101 6" PVC C -900 DR -18 WATER LINE LF 75 $19.73 $1,479.75 $3050 $2,250.00 $26.30 $1,972.50 102 12" GATE VALVE EA 25 $2,014.44 $50,361.00 $3,000.00 $75,000,00 $2,060.00 $51,500.00 103 8" GATE VALVE EA 10 $1,272.00 $12,720.00 $2,000.00 $20,000.00 $1,135.00 $11,350.00 104 6" GATE VALVE EA 1 $799.55 $799.55 $1,500.00 $1,500.00 $824.00 $824.00 105 12" TAPPING SLEEVE AND VALVE EA 1 $4,568.83 $4,568.83 $5,000.00 $5,000.00 $3,915.00 $3,915.00 106 8" TAPPING SLEEVE AND VALVE EA 1 $3,011.28 $3,011.28 $4,000.00 $4,000.00 $2,320.00 $2,320.00 107 ADJUST EX WATER VALVE EA 20 $155.76 $3,115,20 $100.00 $2,000.00 $125.00 $2,500,00 108 FIRE HYDRANT ASSEMBLY (INLCUDES LEADNALVE) EA 18 $3,426.62 $61,679.16 $4,000.00 $72,000.00 $4,535.00 $81,630.00 log CAST IRON FITTINGS TON 15 $4,049.65 $60,744.75 $1,000.00 $15,000.00 $3,300.00 $49,500.00 110 WATER SERVICE EA 45 $415.35 $18,690.75 $300.00 $13,500.00 $412.00 $18,540.00 111 RELOCATE EX WATER METER EA 15 $358.24 $5,373.60 $80.00 $1,200.00 $51.50 $772.50 112 WATER METER BOX EA 60 $62.30 $3,738.00 $100.00 $6,000.00 $51.50 $3,090.00 113 2" BLOW -OFF ASSEMBLY EA 4 $1,038.37 $4,153,48 $1,000.00 $4,000.00 51,545.00 $6,180,00 114 CONNECT TO EX 6" PVC EA 1 $747,63 $747.63 $2,000.00 $2,000.00 $515.00 $515.00 115 CONNECT TO EX 8" PVC EA 5 $1,038.37 $5,191.85 $2,500.00 $12,500,00 $566.50 $2,832.50 116 CONNECT TO EX 12" PVC EA 2 $1,313.54 $2,627.08 $3,000.00 $6,000.00 $721.00 $1,442.00 117 CLASS "G" CONCRETE ENCASEMENT LF 300 $41.53 $12,459.00 $40.00 $12,000.00 $15.45 $4,635.00 118 CUT, PLUG & BLOCK EX 6 "' WATER LINE LS 1 $342.66 $342.66 $3,000.00 $3,000.00 $515.00 $515.00 119 CUT, PLUG & BLOCK EX 8" WATER LINE LS 1 $685.32 $685.32 $3,000.00 $3,000.00 $515.00 $515.00 120 CUT, PLUG & BLOCK EX 12" WATER LINE LS 1 $1,027.99 $1,027.99 $6,000.00 $6,000.00 $618.00 $618.00 121 TEMPORARY 12" WATER LINE CONNECTION EA 2 $4,568.83 $9,13776 $3,000.00 $6,000.00 $3,193.00 $6,386.00 122 TRENCH SAFETY - WATER LF 6,775 $0.26 $1,761.50 $1.00 $6,775.00 $0.55 $3,726.25 123 IRRIGATION SYSTEM (MEDIANS) LS 1 $69,454.54 $69,454.54 $60,000.00 $60,000.00 $78,250.00 $78,250,00 124 ADJUST AND RESTORE EX IRRIGATION SYSTEMS (PARKWAYS) LS 1 $22,449.58 $22,449.58 $10,000.00 $10,000.00 $10,815.00 $10,815,00 125 STAMPED LIGHT -DUTY CONCRETE (MEDIAN) SF 17,500 $194 $68,950.00 $6.50 $113,750.00 $7.10 $124,250.00 126 STAMPED HEAVY -DUTY CONCRETE (CROSSWALK) SF 5,500 $7.60 $41,800.00 $9.00 $49,500.00 $7.40 $40,700.00 127 CONCRETE MOWSTRIP LF 500 $17.77 $8,885.00 $20.00 $10,000.00 $23.00 $11,500.00 128 4" TOPSOIL SY 23,000 $0.50 $11,500.00 $1.00 $23,000.00 $2.40 $55,200.00 129 GROUNDCOVER (SEED) SY 2,400 $0.93 $2,232.00 $0.50 $1,200.00 $0.45 $1.080.00 BID TABULATION CHECKED AND RECEIVED BY: BY: L-Ivlq DATE: 1012-01.1v KIMLEY -HORN AND ASSOCIATES, INC. SHEET !. OF _ Quantity Unit Price Cost Unit Price OWNER: City of Southlake BIDDER 1 BIDDER 2 BIDDER 3 JOB NO: 061237001 DATE: October 19, 2010 Ed Bell Construction Company North Texas Contracting, Inc. Tiseo Paving Company LOCATION AND DESCRIPTION: 10605 Harry Hines Blvd. P.O. Box 468 419 E. Hwy. 80 North Kimball Avenue Dallas, TX 75220 Keller, TX 76244 Mesquite, TX 75150 Plan Item Unit Quantity Unit Price Cost Unit Price Cost Unit Price Cost 130 GROUNDCOVER (SOD) SY 20,600 $2.91 $59,946.00 $2.50 $51,500.00 $2.65 $54,590.00 131 GROUNDCOVER/MIXED PERENNIALS (AUTUMN SAGE) EA 400 $13.50 $5,400.00 $14.00 $5,600.00 $12.90 $5,160.00 132 GROUNDCOVER/MIXED PERENNIALS (BL. PRINCESS VERBENA) EA 400 $12,46 $4,984.00 $13.00 $5,200.00 $11.85 $4,740.00 133 GROUNDCOVER /MIXED PERENNIALS (TURK'S CAP) EA 400 $12.46 $4,984.00 $15.00 $6,000.00 $13,95 $5,580.00 134 GROUNDCOVER (ASIAN JASMINE) EA 1,100 $2.34 $2,574.00 $2.50 $2,750.00 $2.50 $2,750.00 135 SHRUB (3 GAL PURPLE PIXIE LOROPETALUM) EA 700 $14.54 $10,178.00 $25.00 $17,500.00 $21.50 $15,050.00 136 SHRUB (5 GAL KNOCK OUT ROSE) EA 700 $16.61 $11,627.00 $30.00 $21,000.00 $27.05 $18,935.00 137 TREE (3" CAL AUTUMN BLAZE MAPLE) EA 10 $664.56 $6,645.60 $300.00 $3,000.00 $275.00 $2,750.00 138 TREE (3" CAL DESERT WILLOW) EA 12 $747.63 $8,971.56 $300.00 $3,600.00 $265.010 $3,180.00 139 TREE (3" CAL SAVANNAH HOLLY) EA 21 $519.19 $10,902.99 $200.00 $4,200.00 $180.25 $3,785.25 140 TREE (3" CAL CRAPE MYRTLE - DYNAMITE RED') EA 12 $664.56 $7,974.72 $300.00 $3,600,00 $295.00 $3,540.00 141 TREE (3" CAL CRAPE MYRTLE'NATCHEZ') EA 12 $529.57 $6,354.84 $300.00 $3,600.00 $295.00 $3,540.00 142 BED PREPARATION (PLANT MIX) CY 800 $22.84 $18,272.00 $55.00 $44,000.00 $54.00 $43,200.00 143 HARDWOOD MULCH (2" DEPTH) CY 200 $25.96 $5,192,00 $39.00 $7,800.00 $36.05 $7,210.00 144 STEEL EDG{NG LF 200 $4.15 $830.00 $3.00 $600.00 $2.95 $590.00 145 ADJUST & RESTORE EX. LANDSCAPING AT COTSWOLD VALLEY LS 1 $4,153,48 $4,153.48 $1,000.00 $1,000.00 $1,290.00 $1,290.00 146 ADJUST & RESTORE EX. LANDSCAPING AT PATTERSON POND LS 1 $3,634,30 $3,634.30 $2,000.00 $2,000.00 $2,835.00 $2,835A0 PE TEMPORARY TRAFFIC SIGNAL @ KIMBALL/HIGHLAND LS 1 $18,000,00 $18,000.00 $20,500.00 $20,500.00 $34,505.00 $34,505.00 TOTAL BASE BID $6,892,567.81 $7,347,447.00 $7,353,656.50 BID TABULATION CHECKED AND RECEIVED BY: BY: (1/v DATE: 10 /Zo ltic') KIMLEY -HORN AND ASSOCIATES, INC. Item Unit SHEET S OF Unit Price Cost Unit Price Cost Base Bid OWNER: City of Southlake BIDDER 4 BIDDER 5 JOB NO: 061237001 DATE: October 19, 2410 AU Contractors Glenn Thurman, Inc. 1 LOCATION AND DESCRIPTION: 4775 North Freeway P.O. Box 850842 $610,000.00 North Kimball Avenue Fort Worth, TX 76106 Mesquite, TX 75185 2 Plan Item Unit Quantity Unit Price Cost Unit Price Cost Base Bid 1 MOBILIZATION LS 1 $610,000.00 $610,000.00 $730,000.00 $730,000.00 2 GENERAL SITE PREPARATION LS 1 $280,000.00 $280,000.00 $200,000.00 $200,000.00 3 UNCLASSIFIED STREET EXCAVATION CY 29,500 $9,00 $265,500.00 $8.00 $236,000.00 4, EMBANKMENT CY 12,000 $3.00 $36,000.00 $3.50 $42,000.00 5 TEMP EROS, SEDIMENT AND WATER POLLUTION CONTROL LS 1 $22,000.00 $22,000.00 $50,000.00 $50,000.00 6 8" REINF CONC PAVEMENT 4,000 PSI WITH INTEGRAL 6" CURB SY 45,000 $25.00 $1,125,000.00 $28.40 $1,278,000.00 7 LIME STABILIZED SUBGRADE (6 ") SY 47,750 $2.70 $128,925.00 $2.30 $109,825.00 8 HYDRATED LIME (42 LBS /SY) TON 1,003 $150.00 $150,450.00 $146.00 $146,438.00 9 2" HMAC SURFACE COURSE (TY D) SY 1,250 $10.00 $12,500.00 $10.00 $12,500,00 10 6" HMAC SURFACE COURSE (TY B) SY 1,250 $24.00 $30,000.00 $23.50 $29,375.00 11 CONCRETE DRIVEWAY APPROACH SY 2,700 $40.00 $108,000.00 $40.00 $108,000.00 12 ASPHALT DRIVEWAY SY 1,400 $30.00 $42,000.00 $30.00 $42,000.00 13 CONCRETE DRIVEWAY SY 800 $35.00 $28,000.00 $35.00 $28,000.00 14 REINF CONCRETE STREET HEADER LF 900 $12.00 $10,800.00 $10.00 $9,000.00 15 5" REINF CONC SIDEWALK (3,000 PSI) SY 7,900 $32.00 $252,800.00 $31.50 $248,850.00 16 REINF CONC SIDEWALK WITH RETAINING WALL (HT UP TO 6') SY 200 $220.00 $44,000.00 $225.00 $45,000.00 17 4" CONCRETE FLUME ADJACENT TO RETAINING WALLS SF 1,600 $5.50 $8,800.00 $8.00 $12,800.00 18 BARRIER FREE RAMP (TxDOT TYPE 1) EA 12 $1,200.00 $14,400.00 $900.00 $10,800.00 19 BARRIER FREE RAMP (TxDOT TYPE 2) €A 6 $1,300.00 $7,800.00 $1,000.00 $6,00070 20 BARRIER FREE RAMP (TxDOT TYPE 7) EA 23 $1,100.00 $25,300.00 $800.00 $18,400.00 21 BARRIER FREE RAMP (TxDOT TYPE 10) EA 3 $1,400.00 $4,200.00 $800.00 $2,400.00 22 BARRIER FREE RAMPS (TxDOT TYPE 22) EA 1 $1,500.00 $1,500.00 $2,200.00 $2,200.00 23 MONOLITHIC MEDIAN NOSE - TYPE 1 EA 23 $300.00 $6,900.00 $400.00 $9,200.00 24 MONOLITHIC MEDIAN NOSE - TYPE 2 EA 7 $250.00 $1,750.00 $300.00 $2,100.00 25 4' CHAIN -LINK FENCE REPLACEMENT LF 400 $13.00 $5,200.00 $13.00 $5,200.00 26 BARBED -WIRE FENCE WITH METAL POSTS LF 400 $5.00 $2,000.00 $5.00 $2,000.00 27 HOG WIRE FENCE REPLACEMENT LF 700 $9.00 $6,300.00 $9.00 $6,300.00 28 PIPE RAIL FENCE REPLACEMENT LF 300 $45.00 $13,500.00 $45.00 $13,500.00 29 CABLE FENCE REPLACEMENT LF 250 $13.00 $3,250.00 $12.40 $3,100.00 30 6' STOCKADE FENCE REPLACEMENT LF 250 $15.00 $3,750.00 $15.00 $3,750.00 31 6' STONE SCREENING WALL LF 250 $310.00 $77,500.00 $295.00 $73,750.00 32, 6' STOCKADE FENCE ON RETAINING WALL LF 250 $18.00 $4,500.00 $17.00 $4,250.00 33.6' STONE SCREENING WALL ON RETAINING WALL LF 50C $260.00 $130,000.00 $240,00 $120,000.00 34 8' MASONRY SCREENING WALL ON RETAINING WALL LF 500 $200.00 $100,000.00 $200.00 $100,000.00 35 TEMPORARY FENCING LF 1,100 $4,00 $4,400.00 $4.05 $4,455.00 36 CONC RETAINING WALL (HT UP TO 6') SF 6,200 $52,00 $322,400.00 $70.00 $434,000.00 37 CONC RETAINING WALL (HT > 6-TO < 9') SF 3,000 $70.00 $210,000.00 $63.00 $189,000.00 38 CONC RETAINING WALL (HT 9' - 14) SF 5,400 $80.00 $432,000.00 $92.00 $496,800.00 39 PEDESTRIAN RAIL ON RETAINING WALL LF 1,600 $90.00 $144,000.00 $200.00 $320,000.00 40 TRANSMISSION TOWER WALL AND GRATE LS 1 $23,000.00 $23,000.00 $9,000.00 $9,000.00 41 STONE VENEER SF 20,000 $19.00 $380,000.00 $15.00 $300,000.00 42,TRAFFIC CONTROL MO 14 $12,000.00 $168,000.00 $12,000.00 $168,000.00 43 ADDfTIONAL TEMP ASPHALT PAVEMENT (3" TY BON 6" FLEXBASg SY 2,500 $21.25 $53,125.00 $25.00 $62,500.00 BID TABULATION CHECKED AND RECEIVED 8Y; BY: /- Nl DATE: !O f2U /to KIMLEY -HORN AND ASSOCIATES, INC. SHEET OF OWNER: City of Southlake BIDDER 4 BIDDER 5 JOB NO: 061237001 DATE: October 19, 2010 LOCATION AND DESCRIPTION: North Kimball Avenue AUI Contractors Glenn Thurman, Inc. 4775 North Freeway P.O. Box 850842 Fort Worth, TX 76106 Mesquite, TX 75185 Plan Item Unit Quantity Unit Price Cost Unit Price Cost 44 4" WHITE THERMOPLASTIC LANE LINE STRIPE LF 3,600 $1.00 $3,600,00 $1.10 $3,960.00 45 8" SOLID WHITE THERMOPLASTIC TURN BAY LF 2,400 $2.00 $4,800.00 $1.50 $3,600.00 46 12" SOLID WHITE THERMOPLASTIC CROSSWALK LF 200 $5.00 51,000.00 $2.75 $550.00 47 24" SOLID WHATE THERMOPLASTIC STOP BAR LF 180 $10.00 $1,800.00 $5.00 $900.00 48 4" SOLID DOUBLE YELLOW THERMOPLASTIC CENTER STRIPE LF 700 $2.00 $1,400.00 $2.20 $1,540.00 49 12" SOLID YELLOW THERMOPLASTIC CHEVRONS LF 50 $5.00 $250.00 $3.30 $165.00 50 FIRE LANE THERMPLASTIC STRIPE LF 800 $0.55 $440.00 $1.10 $880.00 51 SOLID WHITE THERMOPLASTIC ARROW EA 32 $160.00 $5,120.00 $110.00 $3,520.00 52 SOLID WHITE THERMOPLASTIC WORD EA 1 $200.00 $200.00 $150.00 $150.00 53 TY II -C -R RAISED PAVEMENT MARKER (LANE LINE) EA 650 $5.00 $3,250.00 $2.80 $1,820.00 54 TY II -A -A RAISED PAVEMENT MARKER (CHEVRONS) EA 100 $5.00 $500.00 $2.80 $280.00 55 FURNISH AND INSTALL SIGNAGE LS 1 $15,000.00 $15,000.00 $14,000.00 $14,000.00 56 CONDUIT (PVC) (SCHD 40) (4 ") FOR TRAFFIC SIGNAL LF 2,400 $10.00 $24,000.00 $6.05 $14,520.00 57 GROUND BOX TY D (162922) WIAPRON FOR TRAFFIC SIGNAL EA 20 $700.00 $14,000.00 $525.00 $10,500.00 58 STREET LIGHT FOUNDATION EA 34 $750.00 $25,500.00 $770.00 $26,180.00 59 CONDUIT (PVC) (SCHD 40) (2 ") FOR STREET LIGHTING LF 6,000 $5.50 $33,000,00 $3.60 $21,600.00 60 RELOCATE EX DECORATIVE STREET LIGHTISIGNAGE EA 6 $1,600.00 $9,600.00 $2,500.00 $15,000.00 61 PROJECT SIGN EA 2 $400.00 $800.00 $750,00 $1,500.00 62 RELOCATE EX MAILBOX EA 6 $800.00 $4,800.00 $400.00 $2,400.00 63 RECONSTRUCT EX COTSWOLD VALLEY SIGN EA 2 $10,000.00 $20,000.00 $4,900.00 $9,800.00 64 RELOCATE EX CHURCH SIGN WITH NEW FOUNDATION LS 1 $1,000.00 $1,000.00 $1,100.00 $1,100.00 65 18" RCP CLASS III LF 3,500 $48.00 $168,000.00 $51.00 $178,500.00 66 24" RCP CLASS III LF 675 $58.00 $39,150.00 $64.00 $43,200.00 67 30" RCP CLASS III LF 425 $77,00 $32,725.00 $79.00 $33,575.00 68 36" RCP CLASS III LF 800 $95.00 $76,000.00 $101.50 $81,200.00 69 42" RCP CLASS III LF 25 $120.00 $3,000.00 $132.25 $3,306.25 70 8'x4' RCB LF 110 $350.00 $38,500.00 $295.00 $32,450.00 71 9'x4' RCB LF 110 $400.00 $44,000.00 $339.00 $37,290.00 72 7'x3' RCS LF 220 $300.00 $66,000.00 $256,00 $56,320.00 73 B'x8' RCB LF 220 $420.00 $92,400.00 $375.00 $82,500.00 74 RECESSED CURB INLET - 10' EA 35 $2,600.00 $91,000.00 $2,450.00 $85,750.00 75 STANDARD CURB INLET - 10' EA 2 $2,700.00 $- 5,400.00 $2,420.00 $4,840.00 76 SURFACE GRATE INLET - 2'x2' EA 4 $1,100 ,00 $4,400.00 $1,000.00 $4,000.00 77 DROP INLET -4'x4' EA 14 $2,000,00 $28,000.00 $1,900.00 $26,600.00 78 JUNCTION BOX -4'x4' EA 3 $2,700.00 $8,100.00 $2,600.00 $7,800.00 79 JUNCTION BOX -5'x5' EA 2 $3,200.00 $6,400.00 $3,100.00 $6,200.00 80 JUNCTION BOX -6'x6' EA 1 $5,000.00 $5,000.00 $4,600.00 $4,600.00 81 SAFETY END TREATMENT (TXDOT PSET -PD) EA 2 $1,250.00 $2,500.00 $1,000.00 $2,000.00 82 CONVERT EX DROP INLET INTO A JUNCTION BOX EA 4 $1,800.00 $7,200.00 $1,870.00 $7,480.00 83 CONVERT EX DROP INLET INTO RECESSED 10' CURB INLET EA 4 $2,600.00 $10,400.00 $2,400.00 $9,600.00 84 ADJUST EXISTING STORM DRAIN MANHOLE EA 5 $3,500.00 $17,500.00 $1,000.00 $5,000.00 85 GABION BASKET - 1'x2' CY 10 $300.00 $3,000.00 $250.00 $2,500.00 86 GABION BASKET - 3'x3' CY 100 $300.00 $30,000.00 $270.00 $27,000.00 BID TABULATION KIMLEY -HORN AND ASSOCIATES, INC. CHECKED AND RECEIVED BY: BY: L /A � DATE: 10jZ0 %0 SHEET OF OWNER: City of Southlake BIDDER 4 BIDDER 5 JOB NO: 061237001 DATE: October 19, 2010 AUI Contractors Glenn Thurman, Inc. LOCATION AND DESCRIPTION: 4775 North Freeway P.O. Box 850842 North Kimball Avenue Fort Worth, TX 76106 Mesquite, TX 75185 Plan Item Unit Quantity Unit Price Cost Unit Price Cost 87 GABION MATTRESS CY 120 $200.00 $24,000.00 $250.00 $30,000.00 88 UNCLASSIFIED CHANNEL EXCAVATION LS 1 $11,000.00 $11,000.00 $30,000,00 $30,000.00 89 TRENCH SAFETY - STORM DRAIN LF 6,085 $1.00 $6,085.00 $2.00 $12,170.00 90 8" PVC SDR 26 SANITARY SEWER LF 3,200 $37.00 $118,400.00 $30.00 $96,000.00 91 4' DIAMETER SANITARY SEWER MANHOLE EA 4 $3,300.00 $13,200.00 $2,900.00 $11,600.00 92 V DIAMETER SANITARY SEWER MANHOLE EA 5 $5,400.00 $27,000.00 $4,600.00 $23,000.00 93 CONNECT TO EXISTING SANITARY SEWER L5 1 $2,400.00 $2,400.00 $925.00 $925.00 94 4" STANDARD SERVICE CONNECTION WI CLEANOUT EA 5 $600.00 $3,000.00 $365.00 $1,825.00 95 4" DEEP SERVICE CONNECTION W/ CLEANOUT EA 21 $700,00 $14,700.00 $450.00 $9,450.00 96 18" MJ PLUG VALVE W1 OP NUT, BURIED ACTUATOR EA 1 $22,000.00 $22,000.00 $10,300.00 $10,300.00 97 ADJUST EX. SANITARY SEWER MANHOLE EA 10 $800.00 $8,000.00 $1,000.00 $10,000.00 96 TRENCH SAFETY - SANITARY SEWER LF 3,200 $1.19 $3,808.00 $1.00 $3,200.00 99 12" PVC C -900 DR -18 WATER LINE LF 6,200 $42.00 $260,400.00 $35.00 $217,000.00 100 8" PVC C -900 DR -I8 WATER LINE LF 500 $33.00 $16,500.00 $42.25 $21,125.00 101 6" PVC C -900 DR -18 WATER LINE LF 75 $23.00 $1,725.00 $30.00 $2,250.00 102 12" GATE VALVE EA 25 $2,200.00 $55,000.00 $1,950.00 $48,750.00 103 8" GATE VALVE EA 10 $1,500.00 $15,000.00 $1,150.00 $11,500.00 104 6" GATE VALVE EA 1 $900.00 $90100 $900.00 $900.00 105 12" TAPPING SLEEVE AND VALVE EA 1 $5,200.00 $5,200.00 $4,675.00 $4,675.00 106 8" TAPPING SLEEVE AND VALVE EA 1 $3,500.00 $3,500.00 $3,000.00 $3,000.00 107 ADJUST EX WATER VALVE EA 20 $200.00 $4,000.00 $275.00 $5,500.00 108 FIRE HYDRANT ASSEMBLY (INLCUDES LEADIVALVE) EA 18 $4,000.00 $72,000.00 $3,750,00 $67,500.00 109 CAST IRON FITTINGS TON 15 $4,500.00 $67,500.00 $5,500.00 $82,500.00 110 WATER SERVICE EA 45 $500.00 $22,500.00 $550.00 $24,750.00 111 RELOCATE EX WATER METER EA 15 $410.00 $6,150.00 $475.00 $7,125.00 112 WATER METER BOX EA 60 $72.00 $4,320.00 $100.00 $6,000.00 113 2" BLOW -OFF ASSEMBLY EA 4 $1,200.00 $4,800.00 $3,250.00 $13,000.00 114 CONNECT TO EX 6" PVC EA 1 $900.00 $900.00 $1,000.00 $1,000.00 115 CONNECT TO EX 8" PVC EA 5 $1,200,00 $6,000.00 $1,000.00 $5,000.00 116 CONNECT TO EX 12" PVC EA 2 $1,600.00 $3,200.00 $1,200.00 $2,400.00 117 CLASS "G" CONCRETE ENCASEMENT LF 300 $50.00 $15,000.00 $30.00 $9,000.00 118 CUT, PLUG & BLOCK EX 6" WATER LINE LS 1 $400.00 $400.00 $750.00 $750.00 119 CUT, PLUG & BLOCK EX 8" WATER LINE LS 1 $800.00 $800.00 $750.00 $750.00 120 CUT, PLUG & BLOCK EX 12" WATER LINE LS 1 $1,200.00 $1,200.00 $850.00 $850.00 121 TEMPORARY 12" WATER LINE CONNECTION EA 2 $5,200.00 $10,400.00 $1,950.00 $3,900.00 122 TRENCH SAFETY - WATER LF 6,775 $0.30 $2,032.50 $0.50 $3,387.50 123 IRRIGATION SYSTEM (MEDIANS) LS 1 $65,000.00 $65,000.00 $82,000.00 $82,000.00 124 ADJUST AND RESTORE EX IRRIGATION SYSTEMS (PARKWAYS) LS 1 $11,000.00 $11,000.00 $10,000.00 $10,000.00 125 STAMPED LIGHT -DUTY CONCRETE (MEDIAN) SF 17,500 $7.00 $122,500.00 $7.00 $122,500.00 126 STAMPED HEAVY -DUTY CONCRETE (CROSSWALK) SF 5,500 $10.00 $55,000.00 510.00 $55,000.00 127 CONCRETE MOWSTRIP LF 500 $28.00 $14,000.00 $10,00 $5,000.00 12814" TOPSOIL SY 23,000 $4.00 $92,000.00 $1.50 $34,500.00 129 GROUNDCOVER (SEED) SY 2,400 $0.45 $1,080.00 $0.50 $1,200.00 BID TABULATION CHECKED AND RECEIVED BY: BY: /.///,4 DATE: 10 /�D /40 KIMLEY -HORN AND ASSOCIATES, INC SHEET B OF OWNER: City otSouthlake BIDDER 4 BIDDER 5 JOB NO: 061237001 DATE: October 19, 2010 AUI Contractors Glenn Thurman, Inc. LOCATION AND DESCRIPTION: 4775 North Freeway P.O. Box 850842 North Kimball Avenue Fort Worth, TX 76106 Mesquite, TX 75185 Plan item Unit Quantity Unit Price Cost Unit Price Cost 130 GROUNDCOVER (SOD) SY 20,600 $3.00 $61,800.00 $3.50 $72,100.00 131 GROUNDCOVERIMIXED PERENNIALS (AUTUMN SAGE) EA 400 $14.00 $5,600.00 $22.00 $8,800.00 132 GROUNDCOVERIMIXED PERENNIALS (BL. PRINCESS VERBENA) EA 400 $13.00 $5,200.00 $22.00 $8,800.00 133 GROUNDCOVERIMIXED PERENNIALS (TURK'S CAP) EA 400 $15.00 $6,000.00 $22.00 $8,800.00 134 GROUNDCOVER (ASIAN JASMINE) EA 1,100 $3.00 $3,300.00 $4.00 $4,400.00 135 SHRUB (3 GAL PURPLE PIXIE LOROPETALUM) EA 700 $23.00 $16,100,00 $22.00 $15,400.00 136 SHRUB (5 GAL KNOCK OUT ROSE) EA 700 $30.00 $21,000.00 $26.00 $18,200.00 137 TREE (3" CAL AUTUMN BLAZE MAPLE) EA 10 $300.00 $3,000.00 $375.00 $3,750.00 138 TREE (3" CAL DESERT WILLOW) EA 12 $300.00 $3,600.00 $525.00 $6,300.00 139 TREE (3 CAL SAVANNAH HOLLY) EA 21 $200.00 $4,200.00 $400.00 $8,400.00 140 TREE (3" CAL CRAPE MYRTLE'DYNAMITE RED') EA 12 $300.00 $3,600.00 $400.00 $4,800.00 141 TREE (3" CAL CRAPE MYRTLE'NATCHEZ') EA 12 $300.00 $3,600.00 $375.00 $4,500.00 142 BED PREPARATION (PLANT MIX) CY 800 $58.00 $46,400.00 $50.00 $40,000.00 143 HARDWOOD MULCH (2" DEPTH) CY 200 $40.00 $8,000.00 $50.00 $10,000.00 144 STEEL EDGING LF 200 $3.00 $600.00 $3.00 $600.00 145 ADJUST & RESTORE EX. LANDSCAPING AT COTSWOLD VALLEY LS 1 $1,400.00 $1,400.00 $3,500.00 $3,500,00 146 ADJUST & RESTORE EX. LANDSCAPING AT PATTERSON POND LS 1 $3,000.00 $3,000.00 $9,000.00 $9,000.00 147 TEMPORARY TRAFFIC SIGNAL @ KIMBALUHIGHLAND LS 1 $31,000.00 $31,000.00 $35,500.00 $35,500.00 TOTAL BASE BID I 1 1 $7,669,285.50 $7,924,301.75