Item 7FCity of Southlake
Department of Planning
STAFF REPORT
February 11, 2004
CASE NO
ZA03 -088
PROJECT: Chapel Hill Office Park
REQUEST: Realty Capitol Corporation is requesting approval of a site plan.
ACTION NEEDED: 1. Conduct public hearing
2. Consider site plan approval
ATTACHMENTS: (A)
(B)
(C)
(D)
(E)
(F)
(G)
Background Information
Vicinity Map
Plans and Support Information
Site Plan Review Summary
Surrounding Property Owners Map
Surrounding Property Owners Responses
Full Size Plans (Ibr Connin and Council Menzbersv Only)
STAFF CONTACT: Dennis Killough (481 -2073)
Bruce Payne (481 -2036)
Case No.
ZA03 -088
BACKGROUND INFORMATION
OWNER: RCP Southlake Blvd. 41 Ltd.
APPLICANT: Realty Capitol Corporation
PURPOSE: The purpose of this request is to receive approval of a site plan and building
elevations in order to begin construction of 4 office buildings.
PROPERTY SITUATION: The property is located at 205 E. Southlake Blvd., approximately 800' east of
the intersection of Southlake Blvd. and White Chapel.
LEGAL DESCRIPTION
LAND USE CATEGORY
CURRENT ZONING:
HISTORY:
TRANSPORTATION
ASSESSMENT:
Case No.
ZA03 -088
Tract 5F, OW Knight Survey, Abstract No. 899
Office Commercial
"S -P -2" General Site Plan District
-A zoning change with a concept plan was approved by City Council on
September 2, 2003.
Master Thoroughfare Plan
The Master Thoroughfare Plan recommends Southlake Boulevard to have
130' of right -of -way. Adequate right -of -way exists for this road.
Existinz Area Road Network and Conditions
The proposed site will have one (1) access directly onto E. Southlake
Boulevard (F.M. 1709). The plan shows common access drives to both the
West and the East giving the site access to S. White Chapel Boulevard and the
future Parkwood Drive.
E. Southlake Boulevard is a 5 -lane, undivided thoroughfare with a continuous,
two -way, center left -turn lane. The roadway will ultimately be widened to a
7 -lane roadway.
May, 2003 traffic counts on E. Southlake Blvd (between White Chapel
Blvd and Byron Nelson Pkw
24hr
West Bound (WB) (23,940)
East Bound (EB) (22,576)
WB
Peak A.M. (1,182) 11 — 12 a.m.
Peak P.M. (2,938) 5 — 6 p.m.
EB
Peak A.M. (2,158) 7 — 8 a.m.
Peak P.M. (1,465) 4 — 5 p.m.
Attachment A
Page 1
Traffic Imptict
PATHWAYS MASTER
PLAN:
Use
Sq. Ft.
Vtpd*
AM-
IN
AM-
OUT
PM-
IN
PM_
OUT
Office
21,200
233
29
4
5
26
*Vehicle Trips Per Day
"The AM /PM times represent the potential number of vehicle trips generated during the peak
travel times on Southlake Boulevard.
According to the Master Pathways Plan, an 8' multi -use trail is programmed
along the south side of E. Southlake Blvd. The trail has been constructed and
currently exists.
WATER & SEWER: A 12" water line extension is proposed from the east side of the future
Parkwood Drive approximately 350' away. An 8" sewer line extension is
proposed from the west side of Parkwood Drive approximately 250' away.
TREE PRESERVATION: The only trees shown to be preserved on the site is a 40" Oak tree in the
southeast corner and 5 Oak trees in the northwest corner of the development.
A retention wall is proposed to be constructed around the 40" Oak tree in the
southeast corner of the property to contain the existing grade from the
proposed grade changes. The constructed retention wall must be built further
out from the base of the tree than proposed on the plan. It has to be built to
preserve at least 75% of the trees existing Critical Root Zone.
P &Z ACTION: February 5, 2004; Approved (4 -0) subject to Site Plan Review No. 3, dated
January 30, 2004.
STAFF COMMENTS: Attached is Site Plan Review Summary No. 3, dated January 30, 2004.
V,Community Development \WP - FILES \MEMO \2003cases \03- 088SP.doc
Case No. Attachment A
ZA03 -088 Page 2
Vicinity Map
Chapel Hill Office Park Addition
1000 0 1000 2000 3000 Feet
E
S
Case No.
ZA03 -088
Attachment B
Page 1
ioa'9i0'I:OOd
w
° b
a� a
:Fa �
m" z
�g�
n
m , U 8
S o
o
00
�Q� m
m
i •c
' m
g� N
$p fi�gFU
cn
U ^'
` Y', �I !la .aa 'w'➢ alop�eo� --- -� eats — � I G �
drvn ,Ol - 'JIdl4]Rg_dL ��
v — o . d
ZL9 !i £L9 ii
-
aaw
t.
0 02191
b #101 J
4
E o ats
#lot
s
/J
�a
I
3aum�
'3'S 001" s
15'`a
11
.•
9#7
I
rr a s n,M"." c �m w" i�nwa smnaa®vn ' �j ° :I I �� I _ I. ,�,. �> �' 4 � ',�„ •� x �' :. _ °°°""'� - �
a s 35 4Y �w�3d �W ISM nr sv th/0 - ° y -
39m]rW
—oiy E n ®. OS'f99-!d A s hs3 i as IP a „ ory~
E'en i Aa ool3' B Q I. 1 4#1ol
17 71
o „w.l �., 3.0 n I s s # log E I 3�ueo Hai nay a n3une .6. b
I � as 1 # 101 i' X.]68135
ml„n - -- - �-a J � , � � I I • I . � anamrnR . ai sa a
I I I
�, � � ue�aw. nu a lrv3.N35N3 urtull V' I DOGS 3G. � �� �°'
aHVA 83ii119 ,ri, M.�YH135 n n .._
-••�•• � —� _ _ _ `l ° y 3dNJS�ddb'l ,OZ 'JNf(lTN1B I/ aw.u...� I � V i,� anw ir�mrw _.. Irvo » Oa OQiI`6 ~ _
l60[! ���'Ql1� � N oa a. .w `sw .t :wlwros :n w .z
8
S 0 _ _� WHI•ul4�S 3�z
'� vn •sr a+rs .xwwws daa J•�w 00
�N
o
ooi
00 .
� I
i
Q �
03 WEST ELEVATION
saic -ai ic-•r,c° (REAR)
^ ,i FRONT - EAST ELEVATION
BLDG t
la J§�� a
r �
7 �
nR
Q'
R-,
W va
U
.°a o
i
A -4
" 11
�� END • NORTH & SOUTH ELEVATIONS
Case No.
ZA03 -088
Attachment C
Page 3
o
M
0.
LL
o
a
� n
02 END -NOF?Tl-f&SOUTH --LkVATIONS
0 1 FRONT - EAST ELEVATION
I BLDa # z
MhAte - Wk�S I )'-Lh VA IILPIV
03 — vll-- I -�
Case No.
ZA03 -088
Attachment C
Page 5
o
a
------------
i�
03 REAR - EAST ELEVATION
&--r
0 END - NORTH & SOUTH ELEVATIONS
2 11
W
mm
M.
C\ n
Case No.
ZA03 -088
Attachment C
Page 7
o
m
02 END- EAST& WEST ELEVATIONS
-/,61r-c
0
1.4
A-16
00 n
0 1 FRONT - NORTH ELEVATION
BLpa. # 7
03 REAR - SOLrrl4 ELEVATION
. .. .................
---
' r�
mi 1
8KIN J li Irmo,
02 END- EAST& WEST ELEVATIONS
-/,61r-c
0
1.4
A-16
00 n
0 1 FRONT - NORTH ELEVATION
BLpa. # 7
03 REAR - SOLrrl4 ELEVATION
U C�,
a
v
Ni
00
o �
�N
o
0 c
00 .
i
A�
n
b �
UQ� �
o C�
y CA
.. a
v
Ni
00
O �
Z O
y M
� O
V N
SITE PLAN REVIEW SUMMARY
Case No.: ZA03 -088 Review No.: Three Date of Review: 01/30/04
Project Name: Site Plan — Chapel Hill Office Park
APPLICANT: Realty Capital Corporation
Steve Isbell
32 Village Lane, Suite 200
Colleyville, TX 76034
Phone: (817) 488 -4200
Fax: (817) 424 -2448
ARCHITECT: Baird, Hampton & Brown, Inc.
Konstantine Bakintas
309 W. 7 th St., Suite 500
Fort Worth, TX 76102
Phone: (817) 338 -1277
Fax: (817) 338 -9245
CITY STAFF HAS REVIEWED THE ABOVE REFERENCED PROJECT RECEIVED BY THE CITY ON 01/20/04 AND WE
OFFER THE FOLLOWING STIPULATIONS. THESE STIPULATIONS ARE HEREBY MADE CONDITIONS OF SITE PLAN
APPROVAL UNLESS SPECIFICALLY AMENDED BY THE CITY COUNCIL. IF YOU HAVE ANY QUESTIONS ORNEED
FURTHER CLARIFICATION, PLEASE CONTACT BEN BRYNER AT (817) 481 -2086.
General Development Standards Applies Comments
Corridor Overlay Regulations
Y
Complies
Residential Adjacency
Y
Complies
Building Articulation
Y
Complies
Masonry Standards
Y
Complies
Impervious Coverage
Y
Complies
Bufferyards
Y
Complies
Interior Landscape
Y
Complies
Driveways
Y
See Comments No. 1
Lighting
Y
Must comply with Outdoor Lighting Ordinance No. 693 -B
Correctly show the articulation off -sets on the building footprints of the site plan.
INFORMATIONAL COMMENTS
* A copy of the filed Reciprocal Parking and Access Agreement has been provided to the City.
* A variance for the driveway location on E. Southlake Blvd was approved with the zoning /concept
plan.
* A variance for the stacking depth of 4 F was approved for the drive on E. Southlake Blvd with the
zoning /concept plan.
Case No. Attachment D
ZA03 -088 Page 1
The proposed site shall not exceed the maximum permitted impervious coverage area percentage of
65% for the "O -1" Zoning District. The impervious coverage area percentage approved on the
concept plan is approximately 60 %.
No review of proposed signs is intended with this site plan. A separate building permit is required
prior to construction of any signs.
The applicant should be aware that prior to issuance of a building permit a Plat must be processed and
filed in the County Plat Records, a fully corrected site plan, landscape plan, irrigation plan, and
building plans, must be submitted for approval and all required fees must be paid. This may include
but not be limited to the following fees: Park Fee, Perimeter Street Fee, Water & Sewer Impact and
Tap Fees, and related Permit Fees.
A letter of permission from the adjacent property owner(s) on the west must be obtained prior to
issuance of a building permit for the construction of the off -site pavement and a permit from TxDOT
must be obtained prior to any curb cut along F.M. 1709.
Please be aware that any change of tenant /owners with a request for a new C.O. will require that all
parking areas meet the "all weather surface" requirement in the zoning ordinance and all fire lanes
shall be per the Fire Department's requirements.
Case No.
ZA03 -088
Attachment D
Page 2
Articulation Evaluation
No. 2
Case No. ZA 03 -088
1
jDate of Evaluation: 01/12/04
Elevations for Chapel Hill
Office Park - Building i
Received: 12/29/03
Front - facing:
East
Wall ht. =
12
Horizontal articulation
Vertical articulation
Required
Provided
Delta
Okay?
Required
Provided
Delta
Okay?
Max. wall length
36
21
-42%
Yes
36
21
-42%
Yes
Min. artic. offset
2
2
0%
Yes
2
3
50%
Yes
Min. artic. length
5
9
80%
Yes
5
9
80%
Yes
Rear - facing
West
lWall ht. =
12
Horizontal articulation
Vertical articulation
Required
Provided
Delta
Okay?
Required
Provided
Delta
Okay?
Max. wall length
36
24
-33%
Yes
36
24
-33%
Yes
Min. artic. offset
2
2
0%
Yes
2
13
550%
Yes
Min. artic. length
6
6
0%
Yes
6
6
0%
Yes
Right - facing:
North
lWall ht. =
12
Horizontal articulation
Vertical articulation
Required
Provided
Delta
Okay?
Required
Provided
Delta
Okay?
Max. wall length
36
19
-47%
Yes
1 36
21
-42%
Yes
Min. artic. offset
2
2
0%
Yes
2
8
300%
Yes
Min. artic. length
5
9
80%
Yes
5
6
20%
Yes
Left - facing:
South
Wall ht. =
12
Horizontal articulation
Vertical articulation
Required
Provided
Delta
Okay?j
Required
Provided
Delta
Okay?
Max. wall length
36
19
-47%
Yes
36
21
-42%
Yes
Min. artic. offset
2
2
0%
Yes
2
8
300%
Yes
Min. artic. length
5
9
80%
Yes
5
6
20%
Yes
Case No.
ZA03 -088
Attachment D
Page 3
Articulation Evaluation
No.2
Case No. ZA 03 -088
1
1 Date of Evaluation: 01/30/04
Elevations for Chapel Hill
Office Park - Building 2
Received: 01/20/04
Front - facing:
East
Wall ht. =
12
Horizontal articulation
Vertical articulation
Required
Provided
Delta
Okay?
Required
Provided
Delta
Okay?
Max. wall length
36
23
-36%
Yes
36
22
-39%
Yes
Min. artic. offset
2
2
0%
Yes
2
3
50 %
Yes
Min. artic. length
6
9
50%
Yes
6
10
67%
Yes
Rear - facing
West
lWall ht. =
12
Horizontal articulation
IVertical articulation
Required
Provided
Delta
Okay?
Required
Provided
Delta
Okay?
Max. wall length
36
25
-31%
Yes
36
29
-19%
Yes
Min. artic. offset
2
2
0%
Yes
2
13
550%
Yes
Min. artic. length
6
7
17%
Yes
7
8
14%
Yes
Right - facing:
North
lWall ht. =
12
Horizontal articulation
Vertical articulation
Required
Provided
Delta
Okay?
Required
Provided
Delta
Okay?
Max. wall length
36
14
-61%
Yes
36
19
-47%
Yes
Min. artic. offset
2
2
0%
Yes
2
6
200%1
Yes
Min. artic. length
4
9
125%
Yes
5
5
0%
Yes
Left - facing:
South
lWall ht. =
12
Horizontal articulation
IVertical articulation
Required
Provided
Delta
Okay?
Required
Provided
Delta
Okay?
Max. wall length
36
14
-61%
Yes
36
19
-47%
Yes
Min. artic. offset
1 2
21
0%
Yes
2
6
200%
Yes
Min. artic. length
1 4
91
125%
Yes
5
5
0%
Yes
Case No.
ZA03 -088
Attachment D
Page 4
Articulation Evaluation
No. 3
Case No. ZA 03 -088
1
jDate of Evaluation: 01/30/04
Elevations for Chapel Hill
Office Park - Building 6
Received: 01/20/04
Front - facing:
West
Wall ht. =
12
Horizontal articulation
Vertical articulation
Required
Provided
Delta
Okay?
Required
Provided
Delta
Okay?
Max. wall length
36
25
-31%
Yes
36
25
-31%
Yes
Min. artic. offset
2
2
0%
Yesi
2
3
50%
Yes
Min. artic. length
6
9
50%
Yes
6
9
50%
Yes
Rear - facing
East
lWall ht. =
12
Horizontal articulation
Ivertical articulation
Required
Provided
Delta
Okay?
Required
Provided
Delta
Okay?
Max. wall length
36
27
-25%
Yes
36
27
-25%
Yes
Min. artic. offset
2
2
0%
Yes
2
13
550%
Yes
Min. artic. length
7
7
0%
Yes
7
7
0%
Yes
Right - facing:
South
lWall ht. =
12
Horizontal articulation
Vertical articulation
Required
Provided
Delta
Okay?
Required
Provided
Delta
Okay?
Max. wall length
36
21
-42%
Yes
36
21
-42%
Yes
Min. artic. offset
2
2
0%
Yesi
2
18
800%1
Yes
Min. artic. length
5
6
20%
Yes
5
6
20%
Yes
Left - facing:
North
lWall ht. =
12
Horizontal articulation
Vertical articulation
Required
Provided
Delta
Okay?j
Required
Provided
Delta
Okay?
Max. wall length
36
21
-42%
Yes
36
21
-42%
Yes
Min. artic. offset
1 2
21
0%
Yes
2
18
800%
Yes
Min. artic. length
1 5
1 61
20%
Yes
5
1 6 1
20%
Yes
Case No.
ZA03 -088
Attachment D
Page 5
Articulation Evaluation
No. 2
Case No. ZA 03 -088
1
jDate of Evaluation: 01/12/04
Elevations for Chapel Hill
Office Park - Building 7
Received: 12/29/03
Front - facing:
North
Wall ht. =
15
Horizontal articulation
Vertical articulation
Required
Provided
Delta
Okay?
Required
Provided
Delta
Okay?
Max. wall length
45
25
-44%
Yes
45
26
-42%
Yes
Min. artic. offset
2
9
350%
Yes
2
3
50%
Yes
Min. artic. length
6
15
150%
Yes
6
15
150%
Yes
Rear - facing
South
lWall ht. =
15
Horizontal articulation
Vertical articulation
Required
Provided
Delta
Okay?
Required
Provided
Delta
Okay?
Max. wall length
45
16
-64%
Yes
45
19
-58%1
Yes
Min. artic. offset
2
2
0%
Yes
2
12
500%1
Yes
Min. artic. length
4
9
125%
Yes
5
6
20%
Yes
Right - facing:
West
lWall ht. =
12
Horizontal articulation
Vertical articulation
Required
Provided
Delta
Okay?
Required
Provided
Delta
Okay?
Max. wall length
36
14
-61%
Yes
36
15
-58%
Yes
Min. artic. offset
2
2
0%
Yes
1 2
3
50%
Yes
Min. artic. length
4
9
125%
Yes
4
9
125%
Yes
Left - facing:
East
lWall ht. =
12
Horizontal articulation
Vertical articulation
Required
Provided
Delta
Okay?
I Required
Provided
Delta
Okay?
Max. wall length
36
14
-61%
Yes
36
15
-58%
Yes
Min. artic. offset
1 2
21
0%
Yes
2
3
50%
Yes
Min. artic. length
4
9
125%
Yes
4
9
125%
Yes
Case No.
ZA03 -088
Attachment D
Page 6
TREE PRESERVATION ANALYSIS
(Non - Residential Development)
Case: 03 -088 Date of Review: January 8, 2004 Number of Pages: 1
Project Name: Chapel Hill Office Park
OWNER \ DEVELOPER PREPARED BY:
Reality Capital Corporation Baird, Hampton & Brown, Inc.
Phone: (817) 488 -4200 Phone: (817) 338 -1277
Fax: Fax:
THIS ANALYSIS IS PREPARED AT THE TIME OF REVIEW OF THE ABOVE REFERENCED
PROJECT AND IS TO PROVIDE AN ANALYSIS OF THE PLAN OR SURVEY AND THE IMPACT OF
CONSTRUCTION ON ANY PROTECTED TREES ON THE SITE. FOR ANY QUESTIONS OR
CLARIFICATION CONTACT KEITH MARTIN, LANDSCAPE ADMINISTRATOR AT (817) 481 -5640
TREE PRESERVATION COMMENTS:
1. The only trees shown to be preserved on the site is a 40" Oak tree in the southeast corner and 5 Oak
trees in the northwest corner of the development.
2. A retention wall is proposed to be constructed around the 40" Oak tree in the southeast corner of the
property to contain the existing grade from the proposed grade changes. The constructed retention
wall must be built further out from the base of the tree than proposed on the plan. It has to be built to
preserve at least 75% of the trees existing Critical Root Zone.
A protected tree shall be considered to be altered if less than 75% of the critical root zone is
maintained at undisturbed natural grade, or more than 25% of the canopy is removed, or the tree is
disfigured to the extent a reasonable person would conclude the tree will not survive.
3. Non - residential Development: In a non - residential development, all protected trees that the
Landscape Administrator determines must be altered in order to install utility lines within public
R.O.W. or public utility or drainage easements as shown on an approved Final Plat, or to install fire
lanes, required parking areas and building pad sites as shown on an approved Site Plan, shall be
exempt from the tree protection and tree replacement requirements listed in Sections 7 and 8 of the
Tree Preservation Ordinance. Any protected trees within these areas that the Landscape
Administrator determines do not have to be altered shall be subject to the tree protection
requirements listed in Section 8 of the Tree Preservation Ordinance, but not to the tree replacement
requirements listed in Section 7 of the Tree Preservation Ordinance. All other areas of the
development shall be subject to both the tree replacement and the tree protection requirements, and
all other provisions of the Tree Preservation Ordinance.
Case No. Attachment D
ZA03 -088 Page 7
Surrounding Property Owners
Chapel Hill Office Park Addition
D
Case No.
ZA03 -088
Zoning
Owner
1.
GCSW, Ltd
2.
D. Stoner
3.
S. Bryant
4.
D. Johnston
5.
Fairbanks Capital Corp
6.
Bes -Tex Financial Sery
7.
White Chapel United
3.
Methodist
8.
White Chapel United
3.
Methodist
9.
White Chapel United
4.
Methodist
10.
S. Garrett
Case No.
ZA03 -088
Zoning
Land Use
Acreage
1.
0-1
1.
Office Commercial
1.
0.98
2.
SF -lA
2.
Low Density Residential
2.
1.04
3.
SF -lA
3.
Low Density Residential
3.
1.00
4.
SF -lA
4.
Low Density Residential
4.
0.91
5.
SF -lA
5.
Low Density Residential
5.
0.94
6.
S -P -2
6.
Low Density Residential
6.
5.91
7.
CS
7.
Low Density Residential
7.
6.32
8.
CS
8.
Public /Semi Public
8.
9.50
9.
CS
9.
Public /Semi Public
9.
0.79
10.
AG
10.
Low Density Residential
10.
3.69
Attachment E
Page 1
FMI 1
Surrounding Property Owner Responses
Chapel Hill Office Park
Notices Sent: Nine (9)
Responses: None (0)
Case No.
ZA03 -088