Loading...
Item 7A Plan 5Final Draft March 9, 2005 5.0 MOBILITY PLAN Based on the existing character, previously adopted plans, and the Southlake 2025 Plan Vision, Goals, & Objectives, the following general mobility recommendations for the South Side Plan Area (areas C, D, G, & H) are proposed. 5.1 General Mobility Plan Recommendations Develop an interconnected system of trails and sidewalks along all streets to maximize pedestrian connectivity from neighborhoods to shopping and employment areas. Prioritize the undertaking of a median study that includes the following street sections in the South Side Plan Area: • F.M. 1709 from White Chapel Blvd. to Kimball Ave., • Carroll Ave. from F.M. 1709 to Breezeway, and • Brumlow Ave. from Continental to S.H. 26. As a part of this median study, evaluate the feasibility of designating Carroll Ave. from F.M. 1709 to Continental and Brumlow Ave. from Continental to S.H. 26 to a 4 -lane divided facility. • Specifically, as a part of the median study, develop F.M. 1709 ( Southlake Blvd) from Village Center Drive to Carroll Ave as a "boulevard" with sidewalks, street trees, Southlake 2025 Plan 38 South Side Area Plan Phase 11 Analysis & Recommendations Carroll Ave., looking south at F.M. 1709 Brumlow Ave., looking south. F.M. 1709 looking west from Central Ave. Intersection of F.M. 1709 and Carroll Ave. Final Draft March 9, 2005 medians, and buildings that establish that portion of Southlake Blvd. as the heart of the community's Downtown. Utilize any available bond financing for streetscape improvements to this stretch of F.M. 1709 and Carroll Ave. • Develop a unique intersection treatment at F.M. 1709 and Carroll Ave. to create a sense of place and arrival at Southlake's Downtown as a part of the median study. • Designate White Chapel Blvd.'s ultimate cross section north of F.M. 1709 (3 -lane or 4- lane divided) based on a study to move traffic efficiently and safety through the area. • Recommend the following changes to the Master Thoroughfare Plan: • Designate White Chapel Blvd. to a 2 -lane arterial (94' arterial) with turn lanes at key intersections, • Designate Carroll Ave. from F.M. 1709 to Continental (80' R -O -W) and Brumlow Ave. from Continental to S.H. 26 (88' R -O -W) to a 4 -lane divided facility. • Designate Continental Blvd. from Davis Blvd. to Crooked Lane as a 2 -lane collector (retaining its 84' R -O -W from Davis Blvd. to Carroll Ave. and 94' R -O- W from Carroll Ave. to Kimball Ave.) • Encourage the development of a pedestrian greenway along floodplains and creeks in the area to provide alternative connectivity between neighborhoods and adjacent commercial development. • Encourage automobile and pedestrian connectivity between adjoining commercial developments in the corridor. This in turn will reduce auto trips and turning movements on the arterial roadways and improve level of service. • Evaluate potential for pedestrian connectivity from retail /office uses to adjacent neighborhoods. • Establish design characteristics in addition to technical standards for all identified streets in the planning area. • Preserve the character of S. White Chapel Blvd. from F.M. 1709 to the southern city limit line along Bear Creek. • Prioritize pedestrian safety and access to area schools, sporting facilities (e.g., Dragon Stadium), and city park facilities (e.g., Bicentennial Park). Specifically, designate a school zone along F.M. 1709 in the vicinity of Carroll Senior High School. Southlake 2025 Plan Phase 11 39 South Side Area Plan Analysis & Recommendations View of S. White Chapel Blvd View of pedestrian crosswalk at Carroll Senior High and F.M. 1709 Final Draft 5.2 Mobility Plan Implementation Strategies March 9, 2005 Recommendation Justification Implementation 1. Develop an Trails and sidewalks Ensure that trails and interconnected system provide an alternative to sidewalks are incorporated of trails and sidewalks automobile trips that help to into the planning and along all streets to reduce vehicle emissions development process. maximize pedestrian and improve air quality. Amend the zoning and connectivity from Further, these facilities subdivision ordinances to neighborhoods to provide for recreational require all development to shopping and jogging, walking, and provide sidewalks along employment areas. bicycling. public and private streets Trails and sidewalks add (with the exception of value to the neighborhood. alleys). 2. Designate Continental Improve traffic flow and Revise the Master Blvd. from Davis to retain the aesthetic qualities Thoroughfare Plan for Crooked Lane as a 2- of Continental Blvd. Continental Blvd. from a 3- lane collector with turn lane undivided arterial to a lanes at key 2 -lane collector with turn intersections. lanes (C2U — 84' R -O -W west of Carroll and 94' R- O-W east of Carroll Ave). 3. Designate White Chapel Maintain and improve the Have Public Works in Blvd.'s ultimate cross visual aesthetic of White conjunction with Planning section north of F.M. Chapel while providing for undertake a traffic study 1709 (3 -lane or 4 -lane safe and efficient movement and revise the Master divided) based on a of traffic. Thoroughfare Plan based on study to move traffic the recommendations of efficiently and safety such a study. through the area. 4. Designate White Chapel Changing the designation of Revise the Master south of F.M. 1709 as a White Chapel will preserve Thoroughfare Plan for 2 -lane arterial with turn the unique character of the White Chapel south of F.M. lanes at key road. 1709 to a 2 -lane arterial intersections. (A2U — 94' R -O -W). Southlake 2025 Plan 40 South Side Area Plan Phase 11 Analysis & Recommendations Final Draft March 9, 2005 Recommendation Justification Implementation 5. Designate Brumlow A 4 -lane divided facility has Revise the Master from Continental to the same capacity as a 5- Thoroughfare Plan S.H. 26 as a 4 -lane lane undivided roadway. A accordingly (A4D — 88' R- divided facility from a 4 -lane divided can be O -W). 5 -lane undivided accommodated in the 88' R- arterial. O -W and is aesthetically a better fit with the existing and future development along this corridor. 6. Evaluate intersection Need to improve pedestrian Have Public Works improvements (such as access and safety to the evaluate feasibility. a roundabout, pavement school from surrounding Prioritize funding for markings, crosswalks, neighborhoods. sidewalks near schools in etc.) at Peytonville and the CIP. Continental Blvd. in conjunction with improving pedestrian access and connectivity to Carroll Elementary School. 7. Convert one south Improve traffic flow. South Make recommendation to bound lane of White bound White Chapel the City Engineer. Chapel at F.M. 1709 to reduces to one lane south of a right -turn only lane. the traffic light at F.M. 1709. South bound traffic is impeded from turning right onto F.M. 1709. 8. Evaluate intersection Improve traffic flow and to Have Public Works improvement options at improve safety evaluate feasibility. White Chapel and Continental Blvd., such as a roundabout, pavement markings, crosswalks, etc. 9. Evaluate connectivity Improve traffic flow Consider connectivity around the senior center onto /around F.M. 1709. during further planning and based on future development of the area. development patterns. Southlake 2025 Plan 41 South Side Area Plan Phase 11 Analysis & Recommendations Final Draft March 9, 2005 Recommendation Justification Implementation 10. Evaluate the feasibility Improve pedestrian Include as part of the of changing Carroll connectivity (such as median study and amend Ave. from F.M. 1709 to pedestrian access to Old the Master Thoroughfare Continental Blvd. to a Union Elementary School Plan accordingly. 4 -lane divided facility from neighborhoods along with a planted median Carroll) and improve the with sidewalks on both visual aesthetic of Carroll sides of the street. Ave. 11. Encourage automobile This will reduce auto trips Emphasize connectivity and pedestrian and turning movements on between adjoining connectivity between the arterial roadways and developments during the adjoining commercial improve level of service on planning and development developments in the area arterials and collectors. or redevelopment of corridor. properties in the plan area. 12. Evaluate potential for Automobile trips can be Emphasize pedestrian pedestrian connectivity reduced by improving connectivity between from retail /office uses to pedestrian and bicycle adjoining developments adjacent neighborhoods. accessibility between during the planning and commercial and residential development or developments. redevelopment of properties in the plan area. Amend relevant ordinances to require sidewalks and /or trails along all public and p rivate streets. 13. Evaluate connectivity Improve connectivity of Consider connectivity around the northwest existing neighborhoods to during the planning and corner and southeast Carroll Ave. and F.M. 1709 development of the sites. corner of F.M. 1709 and and to Southlake Town Carroll Ave. in Square. conjunction with proposed development. Southlake 2025 Plan 42 South Side Area Plan Phase 11 Analysis & Recommendations Final Draft March 9, 2005 Recommendation Justification Implementation 14. Evaluate the feasibility Improve the visual aesthetic Include as part of the of a planted median on of F.M. 1709 and improve median study. F.M. 1709 from Village safety. Prioritize the utilization of Center to Carroll any available bond Avenue. financing for streetscape improvements and burying utility lines in this part of F.M. 1709 and along portions of Carroll Ave (from S.H. 114 to future Rucker Road) 15. Upgrade Crooked Lane, Existing road is a sub- Prioritize in the CIP. retaining the existing 2- standard roadway and needs lane facility. to be upgraded. If property along Truck traffic may be Review at the time any Crooked Lane is detrimental to the development application is developed with homeowners and schools made to the city. industrial land uses, along Kimball. recommend limiting truck traffic from accessing Kimball. 16. Maximize pedestrian There is currently limited Prioritize funding for connectivity to schools pedestrian access to the sidewalks in the CIP. and to Dragon Stadium stadium. Have DPS work with CISD from adjoining to establish an appropriate neighborhoods. school zone near Carroll Specifically, establish a Senior High. school zone along F.M. 1709 in the vicinity of Carroll Senior High School. 17. Limit industrial traffic Reduce wear and tear on Review at the time any access to S.H. 26. local arterials and collectors development application is and improve safety. made to the city. 18. Develop a unique A well - designed Include as a part of the intersection treatment at intersection treatment median study. Carroll Ave. & F.M. would complement Town 1709. Square and help to create a unique sense of place. Southlake 2025 Plan 43 South Side Area Plan Phase 11 Analysis & Recommendations Designate White Chapel Blvd's ultimate cross section based on a study to move traf6l safely and efficiently ' through the area - tie Improve pedestrian acce to Carroll Senior High, specifically improving cross walks at F.M:'iV and Psytonville.Av$ Vert one south bound Prow iEr of White Chapethrougproperty to a righ(•from "a F.M. f 709. tom'- Establish a school zone On F.M. 1709 in the vlcmity Carroll of Carroll Senior High SBhr - Hi Preserve the uril character alon White Chapel by redesignating - It as a Vane arterial with turn lanes at key intersections �Elem. CI10C A Legend 'r Designate Continental Blvd. from Davis to Crooked Lane as a 2 -lane key intersections ti ons turn lanes at key intrsecti aluate intersection- �— �- rmpro with I s fn n 0 mdio� with Improving Ji (roundabout, pavement markings, crosswalks, etc) &wr F.M. 1709 (Southlake Blvd.) II0re Proposed "Parkway" Street Sections ^,e Recommended Changes to'MTP Designations ,f **V' Recommended Street Connectivity ,.'�•r� Existing MTP Connectors Recommended Pedestrian Connectivity N South Side Plan Area Boundary ♦ s F 1 ize -¢on finer ing avail9 for streetscape improvemen_ is z uniq ue �Impiove pedestrian accer �Develop rsection treatment at F.M. 1709 & Carroll an4ovide crosswalks on F -M. 1709 betweer Eubanks reate a sense of place Carroll Afar.& Centra'h¢, �AS a p2i117athe median s1u ,. ♦ 65 LDN ♦ c traffic from accessi b ♦• evaluate t7aasibilily of changing; Evaluate connectivity I w . Cerro ve from F.M. 1709 to in conjunction with industrial land _uses +. Continental Blvd. to a4-lane - proposed development ♦, 4rajfs and sidewalks streets to maximize improvement to opti 't:bTne- "1naT81� - a�a������i {roundabout pavement L markings, crosswalks, etc) South Side Plan Area (Areas C, D, G, & H) Mobility Plan Recommendations Final Draft - March 9, 2005 lk J 1 Designate Brumlow fr r Continental to S 6 L as a 4-lane di facility ♦ • 75 LDN F 1 ize -¢on finer ing avail9 for streetscape improvemen_ •+ DFIN Airport Overlay • �' Noise Contours medl improvements -_.P ,._ ♦ ,1� im I Eubanks ♦ �AS a p2i117athe median s1u ,. ♦ 65 LDN ♦ c traffic from accessi b ♦• evaluate t7aasibilily of changing; ♦ w . Cerro ve from F.M. 1709 to industrial land _uses +. Continental Blvd. to a4-lane - • ♦ ♦ ♦ ♦ trial traffic ♦♦ • o S.H. 26 ♦♦ ♦♦ 1 Dragon ■ retaining the existing • ++ ♦ Stadium • 2.1ane facility • � 500 0 500 1000 Feet ^%.? SOUTHLAKE 2025 ri.n ing Y"daY fora 9en.r romp, new rw 1 r i Evaluate sibili planted on F.M ,11 planted median , t709 from Village Center to Carroll Avenue as a ♦ * ♦ rt of Uta - tlian�♦ #1\ ��111111111 /� �i� X1111111\. i � Maximize pedestrian connectivity to schools a d to Dragon Stadium F� Limit indus access t 1 .� F 1 ize -¢on finer ing avail9 for streetscape improvemen_ •+ on F.M. 1709 in conjunction Daw son & _ _'' +• medl improvements -_.P ,._ ♦ ,1� im I Eubanks + • �- Recommend ti g ck •♦ �AS a p2i117athe median s1u ,. schools c traffic from accessi b ♦• evaluate t7aasibilily of changing; ♦ _ property is develo ♦ . Cerro ve from F.M. 1709 to industrial land _uses +. Continental Blvd. to a4-lane - • �♦ L''. r�r divided facility ♦ • • • •• with a planted median - with sidewalks on both • Upgrade Crooked Lane, ♦• L- sides of the street 1 Dragon ■ retaining the existing • ++ ♦ Stadium • 2.1ane facility • ^ri l�r >i - nrtl� i •TI