Loading...
Item 7A Plan 1Final Draft March 9, 2005 1.0 INTRODUCTION The South Side Plan Area is primarily a residential area with significant retail, office, industrial, and park land uses. The area includes F.M. 1709 (Southlake Blvd.), which is a principal arterial in the city and an important east -west corridor linking the cities of Grapevine, Southlake, and Keller. F.M. 1709 (Southlake Blvd.) forms the northern edge and S.H. 26 forms the southeastern edge of the South Side Plan Area. Bear Creek separates the plan area and the city from Colleyville to the south. The western edge of the South Side Plan area is the Davis Boulevard/F.M. 1938 Corridor plan area. F.M. 1709 is characterized by intense retail uses east of Carroll Avenue and lower intensity office and residential uses west of Carroll Ave. Southlake 2025 Plan Phase II South Side Area Plan Analysis & Recommendations Location of F.M. 1709 (Southlake Blvd.) in its Regional Context View of Pecan Creek Retail Development View of Harris Methodist Southlake Final Draft March 9, 2005 The following preliminary analysis and recommendations for development in the South Side Plan Area are part of the larger effort of Phase 11 of the Southlake 2025 Plan. The city has been generally divided into 9 distinct planning areas in order to facilitate an efficient, but detailed study of the entire city (see figure below). The boundaries shown for the different planning areas may change as the Planning and Zoning Commission sees fit. They are intended to be flexible with general identification of areas of distinct development impact. These delineations are for planning purposes only and may contain areas similar in character and /or land use. The South Side Plan Area includes areas "C ", "D ", "G ", and "H" as indicated by the map below. 1.1 General Character of the Area The northern boundary of the South Side Plan Area includes the properties along the northern edge of F.M. 1709 ( Southlake Blvd.) and is the location for the majority of the commercial development in the area, including Southlake Town Square and Harris Methodist Hospital. It also includes Bicentennial Park, the second largest public park in the city. The park provides a variety of recreational opportunities, however, pedestrian and bicyclist access from neighboring subdivisions is limited. Southlake 2025 Plan 2 South Side Area Plan Phase II Analysis & Recommendations Southlake 2025 Plan — Phase 11 South Side Plan Area (Areas C, D, G, & H) Final Draft Marcia 9, 2005 0 �1 CL r V to Qw 0 N 0 0 Q (j) %N;;w �r,4 Sonthlake 2025 Plan 3 South ,Side Area Plan Phase H Analvsis & Recommendations m N V m 0 �1 CL r V to Qw 0 N 0 0 Q (j) %N;;w �r,4 Sonthlake 2025 Plan 3 South ,Side Area Plan Phase H Analvsis & Recommendations Final Draft March 9, 2005 The central and southern sections of the plan area are characterized by low density residential and medium density residential subdivisions. Some of the houses are located in or adjacent to the 100 -year flood plain. In addition, there are a number of large estates along White Chapel with a unique rural character not found in many other areas of the city. The eastern section of the plan area is characterized primarily by industrial uses. There are a few former industrial sites, such as the former PUMPCO site, that will present unique challenges for future development. 1.2 Traffic Count Trends F.M. 1709 is an important transportation corridor in the city for influencing the development patterns and character of Southlake. It is a regional arterial that runs from S.H. 114 west to Interstate 35W and is designed to serve regional and major traffic generators. Traffic volumes along FM 1709 have remained generally stable over the past few years: Southlake 2025 Plan 4 South Side Area Plan Phase II Analysis & Recommendations View of residential development along F.M. 1709. View of recent garden office projects along F.M. 1709. Typical industrial uses Former PUMPCO site Final Draft March 9, 2005 F.M. 1709 (Southlake Blvd.) Traffic Count Trends 2000-2025 80,000 70,000 60,000 O U 50,000 ; 0 cc R L 40,000 cc 3 30,000 L O 20,000 - N 10,000 - F.M. 1938 to Peytonville S . Lakes Shady Oaks W. Chapel Byron Carroll to Kimball to S.H. 114 to Pearson to F.M. 1938 to to S. R. to Shady Nelson to Byron Carroll Kimball Peytonville Lakes Oaks W. Chapel Nelson ❑ 2000 35,447 36,808 37,320 42,197 42,497 48,469 45,150 42,466 43,330 ■ 2001 32,739 41,160 45,022 45,059 44,967 43,724 44,457 45,333 45,287 ❑ 2002 33,225 39,606 41,140 41,795 45,306 43,043 44,886 43,975 39,580 ❑ 2003 32,003 39,050 40,209 41,937 45,052 46,516 45,760 44,965 39,923 ■ 2004 33,391 44,354 43,241 43,584 45,064 46,492 40,982 46,371 37,527 ■ 2025 41,395 53,265 55,716 46,183 41,574 45,544 44,497 60,571 69,936 Segment Source: 2004 Traffic Count Report & NCTCOG Traffic counts along F.M. 1709 are expected to stabilize or increase slightly over the next few years. However, if F.M. 1709 is widened from the current five lanes to seven, there is a potential for a significant traffic increase. In contrast, the other primary east -west route in the plan area, Continental Blvd., has seen a significant decrease in traffic with the opening of S.H. 114. North -south routes include White Chapel Blvd., Carroll Ave., and Kimball Ave. All three of these routes are expected to see significant increases in traffic counts once they are widened. The year 2025 estimates (NCTCOG) for the same segments along F.M. 1709 indicate the highest increases in traffic volumes east of Carroll Ave. and west of Southridge Lakes. Southlake 2025 Plan Phase II South Side Area Plan Analysis & Recommendations