Item 5F AudioIntegrity
Innovation
Accountability Item 5 F
Commitment to
Excellence
ZA06-147:
First Reading for Zoning Change
and Site Plan
ZA06-147
OWNER: Eye Consultants Properties
►ntegrity
APPLICANT: Pate Engineers
Innovation
REQUEST: Approval of first reading for a zoning
Accountability
change and site plan from "S-P-1" Detailed
Commitment to
Site Plan District to "S-P-1" Detailed Sitj
Excellence
Plan District with "C-3" General Commercial
Teamwork
Distr'.'It uses to include parking as a
permitted rincipal use.
LOCATION: The property is located on the north side of
E. State Highway 114 west of Grapevine
Plaza (westbound access road of State
Highway 114).
Land Use .•
WestgatePlaza
■
IS �� ■r $- wi
'
Mika, .■�� w S-.Land
- ��Ni1■NI■If■ AI � ■
Use Designation:
fit■IIIir Ii1f11111► Ilif -- ,
_.®®.... � fat IIf■Irfffl■Ifi' Ilfffl■■ II
Office
lIIIIIIIIIL� �R ��
- Illllllaa j,r
LEGEND
fl0lrlrllr111 :I■I ;:
��
100 R FLOOD PLAIN
,'
■■■•■u/ w ,i �'
��r ��IIIIr Illrl Ir ly �r : ■fln��
rLOWDENSITY
, .. BOUNDARY
PUBLIC PARKS/OPEN SPACE
-r ■
RESIDENTIAL
■
MEDIUM DENSITY RESIDENTIAL
OFFICE COMMERCIAL
jE RETAIL COMMERCIAL
MIXED USE
TOWN CENTER
t jib
REGIONAL RETAIL
���M
�►
Illlf.
.III.
LOCATION MAP
11== 1000 2000 3000 Feeta+,ht
. ■
molls�
rr rwnomunr
. P I r:.r r.
•� �•
�
�
►i, nm
�IIg11111
•. NIINIIaIOIIIa11I
nq1 m� Irn �"
NNNIIR NII .� is ii
` lI{r0I1r rOw1/�
■
-loss
Its
�
.......
1�
� �
lllllllll �� ��
�111111' 7� ii
��
��■��1�{
IIII0111 "r.•
�
�
��I{I
{1
r
=�
1111111\\ �Ia rl
rlllll 11111 11 .NI �I
a�a .�MULTI US FAMILY RESIDENTKL
MANUFACTURED HOUSING
'�
NIIIII
��IIIII
ill =�
COMMUNITY SERMCE
IIIII i i`lll'� han1l=�
, FICE DISTRICT
OFFICE DISTRICT
NEIGHWRHOODCOMMERCIA
LOULREUILCOMMERCAL
111
1
111
111 111 --
11I ,- 1R
�-fj
.
Values
IlkIntegrity
if ri
Innovation -4
�,
Accountability jiCommitment to
a
4 10
s.
1 14 .
5
_.:: " O� ( r + � p► amp �I'� R - R`
0
r
• • ° ���' ���`:� ,, �r ado = a � .. � ,���. �`.'.
K iii 4
0
ZA06-147
"S-P-1" Regulations:
Integrity - Under the "S-P-1" zoning the applicant proposes the
Innovation following:
Accountability The proposed permitted uses are to include all "C-3'1
•
Commitment to Excellence General Commercial District uses with an addition to
_ include parking ad) a permitted principal use
• Bufferyards — Bufferyards along the perimeter site
boundary shall adhere to the requirements of
Sections 42 & 43, except that:
o No bufferyards shall be re uired a o lot lines
interior to the site boun
o No bufferyards shall be required along
adjacent to t,ty of Grapevine
^d � \ � m _ �--� ErWESTOpTE PLRZR uE
Average distance = 25'P—
Stacking:
Approved = 5
Provided = 44�r :V
RMTI SEPI 9 2 06 .,
10
1 IA
SLOCK 2
A, S- -17
C_
.111 D.E 10
L.1 C. T.
LOT 4
LOT 3
LOT 2
LOT
- - --- -----
PATE ENGINEERS
n
LOTS PS `6S T. EASIER
NO. 468 ADDITION
cirvwz h+^ ,wa.
12
P&Z ACTION: October 5, 2006; Approved (7-0) subject 4
to review; and granting the requested
Integrity variance to stacking depth and deferring
Innovation to the Park Board on eliminating a
Accountability portion of the multi -use trail.
Commitment to
Excellence At tl?,e P&Z Commission meeting, the
ramwork applicant indicated that the Park
Board would be making a
recommendation regarding the
construction of the multi -use trail.
However, this issue will not be
considered by the Park Board and the
applicant has agreed to construct the
trail as indicated on the Master Trail
Plan.
13