Loading...
Item 5MCity of Southlake, Texas MEMORANDUM June 20, 2006 To: Shana Yelverton, City Manager From: Robert H. Price, P.E., Public Works Director Subject: Authorize a standard form of agreement for professional services with Deltatek Engineering, Inc. for the design of the exterior repainting of Pearson Pump Station Tank #1, the interior repainting of Pearson Pump Station Tank #2 and Quality Assurance /Testing for the repainting of the Dove and Bicentennial elevated storage tanks. Action Requested: Background Information: Authorize a standard form of agreement for professional services with Deltatek Engineering, Inc. for the design of the exterior repainting of Pearson Pump Station Tank #I, the interior repainting of Pearson Pump Station Tank #2 and Quality Assurance /Testing for the repainting of the Dove and Bicentennial elevated storage tanks. The Dove and Bicentennial Elevated Storage Tank's (EST) were constructed in 1986 and 1988 respectively. The interior and exterior renovation of the tanks is in line with the expected life of the coatings applied during their original construction. The exterior of the Pearson west Ground Storage Tank (GST) has faded and needs repainting with a protective top coat to improve its aesthetics. A routine inspection revealed that the interior of the Pearson east Ground Storage Tank was failing and needed repair. Below is a table of the necessary repainting work for the City's water storage tanks and how this Professional Services Agreement (PSA) applies. Tank Description Location of Work PSA Scope Pearson East GST Interior Only Plans, Specs, QA & Testing Pearson West GST Exterior Only Plans, Specs, QA & Testing Dove EST Interior and Exterior QA & Testing Bicentennial EST Interior and Exterior QA & Testing The repainting of the exterior of the Pearson West GST and the Dove and Bicentennial EST's were originally included in, but subsequently removed from the bid package for the construction of the Florence EST. Due to water transmission and distribution issues, at no point in time can both GST's or both EST's be out of service simultaneously and none of the tanks can be out of service between the months of May and October. The intent of this PSA is to provide a construction bid package for the two GST's as well as provide Quality Assurance (QA) and Testing for all four tanks scheduled for repainting. The construction bid package for the two EST's was provided by an existing PSA with Cheatham and Associates. Financial Considerations: The total engineering /QA fee for this PSA is $49,300.00. Citizen Input/ Board Review: None Legal Review: This is a Standard Form of Agreement Alternatives: The City Council may approve it or deny it. Supporting Documents: Standard Form of Agreement Attachment A Article I — Scope of Work Article II - Compensation Location Maps Staff Recommendation: Authorize execution of a Professional Services Agreement for the repainting of the exterior of the west Pearson ground storage tank, the interior of the east Pearson ground storage tank, and for quality assurance and testing services for the repainting of the Dove and Bicentennial elevated storage tanks. Staff Contact: Robert H. Price, P.E., Public Works Director Gordon Mayer, P.E., City Engineer Clayton Redinger, P.E., Construction Manager Page 2 of 9 STANDARD FORM OF AGREEMENT STATE OF TEXAS COUNTY OF TARRANT THIS AGREEMENT, made and entered into this _day of , 2006 by and between Cityo Southlake of the County of Tarrant and State of Texas, acting through Mr. Bob Price, P.E.. Director of Public Works, City of Southlake thereunto duly authorized so to do, Party of the First Part, hereinafter termed OWNER, and Deltatek Engineering of the City of Dallas County of Dallas and State of Texas, Parry of the Second Part, hereinafter termed CONSULTANT. WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be. made and performed by the Party of the First Part (OWNER), the said Party of the Second Part (CONSULTANT), hereby agrees with the said Parry of the First Part (OWNER) to commence and complete the services described as follows: ,Repainting the Interior of Pearson Road Pump Station Two (2) .5.0 MG Ground Storage Tank Quality Assurance./or Dove & BI-Centennial Elevated Storage Tanks and all extra work in connection therewith, under the terms as stated in this Agreement and at his (or their) own proper cost and expense to furnish all the materials, supplies, machinery, equipment, tools, superintendence, labor, insurance, and other accessories and services necessary to complete the said service, in accordance wit the conditions and prices stated in the Proposal attached hereto as Attachment A. The OWNER agrees to pay and the CONSULTANT in current funds the price or prices shown in the proposal_ IN WITNESS WHEROF, the parties to these presents have executed this Agreement in the year and day first above written. City of Southlake Deltatek Engineering Accepted by: Accepted by: Title: Title: Date: Date: bS / /7lOtQ Page 3 of 9 Attachment A Scope of Services Repainting the Interior of Pearson Road Pump Station 5.0 MG Ground Storage East Tank Repainting the Exterior of Pearson Road Pump Station West Tank Quality Assurance for Dove & Bi- Centennial SSTs Article I Scope of Work BASIC SERVICES RENOVATION DOCUMENTS Pearson Pump Station Ground Storage Tanks East Tank, Interior The interior of the existing 5.0 MG Ground Storage Tank will be repainted. The ENGINEER will prepare renovation contract documents (drawings and specifications) for bids by a pre - approved contractor to perform the following tasks: Protective Coating System It is assumed that current protective coating system does not contain lead based paint. These documents shall include interior surface preparation and repainting of all steel surfaces not including tank exterior architectural coating system. The tank interior will be prepared in accordance with SSPC SP10 Near White Blast and will receive hydro -zinc primer and top - coated with an NSF- approved epoxy. All spaces between rafters and roof plates will be. seam sealed to prevent rust bleed. West Tank Exterior The interior of the existing 5.0 MG Ground Storage Tank will be repainted. The ENGINEER will prepare renovation contract documents (drawings and specifications) for bids by a pre- approved contractor to perform the following tasks: Protective Coating System It is assumed that current protective coating system does not contain lead based paint. These documents shall include exterior surface preparation and repainting of all steel surfaces including tank exterior architectural coating system. The tank exterior will be prepared by pressure wash_ All surfaces will receive high solid primer and topcoated with polyurethane with multicolor architectural paint to conform to the decorative feature of tank exterior. Estimate of Probable Cost of Construction After completing final plans and specifications, Deltatek will provide an opinion of probable cost for the project in accordance with final documents for renovation. PROJECT ADMINISTRATION At the conclusion of the design, Deltatek will provide the City with three (3) bound sets of advertising documents (drawings and specifications)_ Deltatek Engineering will distribute Renovation Documents as requested by prospective bidders and maintain an up -to -date plan holders list_ A notice to bidders will be issued to advertising agencies such as Dodge Report and Construction Market Data (CMD). Page 4 of 9 • Deltatek will provide response to questions during the bidding phase. Deltatek shall attend pre -bid conference and prepare addendum (s), if required, during advertisement, • Deltatek will review bids for conformance to the bid documents and provide recommendations for award. • Deltatek will review add comment on submittal data, shop drawings, equipment diagrams, material samples, test results, and other data submitted by the contractor, as required by the Contract Documents. Deltatek will furnish the City of Southlake with record copies of submittal data for records. • Deltatek will review the monthly progress payment requests, submit payment recommendations, and assist in the preparation of change orders to the Contract Documents. • Deltatek will conduct final warranty inspection jointly with representatives of the City of Southlake and submit a written report recommending final settlement of the contract. QUALITY ASSURANCE AND TESTING Deltatek Engineering shall provide an on -site Field Technician to perform observation of the work in progress to assist in determining that the project is proceeding in accordance with the Contract Documents and that the completed work will conform to the contract requirements. On- site representatives during renovation will review the work for the following items: • Protective Coating Systems - Deltatek Engineering shall provide on -site inspection to perform quality control observation for surface preparation and paint application of the tank interior and perform all required testing in order to comply with manufacture's data sheet as well as specifications. The quality control observation shall include metal substrate profile measurements, wet/dry film thickness measurements, checking surface temperatureidew point prior to application, and holiday detection tests on tank interior coating system. • Project Schedule, Pearson Pump Station GSTs Tasks Schedule Preliminary Plans and Specifications 2 weeks Final Plans and Specifications 2 weeks Review 1 weeks Advertisement 4 weeks Award 4 weeks Work order Issued 2 weeks Work Complete 12 weeks Total 27 Weeks 2 Page 5 of 9 Article II Compensation Renovation Documents Pearson Pump Station GSTs Task Description Cost Plans and Specifications for Pearson (SSTs East and West Tanks $14,050.00 Reimbursable, Blueprints, Reproduction, Photos, & Posta e $850.00 TOTAL PLANS AND SPECIFICATIONS i $14,900.00 Project Administration Pearson Pump Station GSTs Task Description Cost Advertisement, Pre -bid Meeting, Answer Questions During Bidding $550.00 Prepare Plan Holders List, Issue $400.00 Attend Bid Opening, Review Bids, and Make Recommendation for Award $350,00 TOTAL ADMINISTRATION $1,300.00 Quality Assurance and Testing Pearson Pump Station GSTs Task Description Cost On -site inspection and testing based on 12 weeks to complete this prgiect $12,900.00 TOTAL QUALITY ASSURANCE & TESTING $12,900.00 Project Administration Dove & Bi- Centennial 1.5 MG ESTs Task Description Cost Advertisement, Pre -bid Meeting, Answer Questions During Bidding $550.00 Prepare Plan Holders List, Issue $400.00 Attend Bid Opening, Review Bids, and Make Recommendation for Award $350.00 TOTAL ADMINISTRATION $1,300.00 Page 6 of 9 Quality Assurance and Testing Dove & Bi- Centennial 1.5 MG ESTs Task Description Cost On -site inspection and testing based on 12 weeks to complete this project $18,900.00 TOTAL QUALITY ASSURANCE & TESTING $18,900.00 SurnwaEl of Costs Pearson Pump Station GSTs Renovation Documents: $14,900,00 Project Administration: $1,300.00 Quality Assurance & Testing: $12,900.00 Total Engineering/Quality Assurance: $29,100.00 Total renovation: $550,000.00 Total Ene/Renovation Pearson PS GSTs: $579,100.00 Dove & Bi- Centennial ESTs Project Administration: $1,300,00 Quality Assurance & Testing: $18,900.00 Total QLC & Testing Dove & Bi- Centennial $24.200.00 Total Engineeringlouality Assurance Fee For Pearson, Dove & Bi- Centennial Storage Facilities: $49,300.00 Page 7of9 Page 8 of 9 Page 9 of 9