Item 5GCity of Southlake
Department of Planning
S T A F F R E P O R T
April 12, 2006
ZA05-152
CASE NO:
Plat Revision for Lots 2R1 through 5R2, Block 1, Stonebridge Park Addition
PROJECT:
REQUEST: Approval of a plat revision for Stonebridge Park Addition containing approximately
8.96 acres and proposing eight (8) lots for office development. The property currently
exists as four platted lots in Stonebridge Park Addition. This plat is consistent with the
approved concept plan and the preliminary plat which precedes this request.
A variance to allow a public street with a reduced right-of-way width of forty (40) feet
and a reduced pavement width of thirty (30) feet was approved by City Council as part
of the concept plan review. As such, a variance for the reduced right-of-way and
pavement widths does not need to be granted as part of the plat. No other variances
are being proposed.
Consider plat revision approval
ACTION NEEDED:
ATTACHMENTS: (A) Background Information
(B) Vicinity Map
(C) Plans and Support Information
Revised Plat Review Summary No. 3, dated April 12, 2006
(D)
(E) Surrounding Property Owners Map
(F) Surrounding Property Owners Responses
(G) Full Size Plans (for Commission and Council Members Only)
STAFF CONTACT: Ken Baker (748-8067)
Dennis Killough (748-8072)
Case No.
ZA 05-152
BACKGROUND INFORMATION
OWNER: Stonebridge Monticello Pt., Ltd.
APPLICANT: Realty Capital Corp.
PROPERTY SITUATION: The property is located at Stonebridge Lane and W. Southlake Boulevard.
LEGAL DESCRIPTION: Lots 2 through 5, Block 1, Stonebridge Park Addition
LAND USE CATEGORY: Retail Commercial and Mixed Use with a T-1 overlay option.
CURRENT ZONING: “S-P-2” Generalized Site Plan District
HISTORY: -A change of zoning to “S-P-2” Generalized Site Plan District was approved for
Stonebridge Park by City Council on September 18, 1996.
-City Council approved a site plan for an animal hospital on August 5, 1997 on
what is now Lot 1.
-City Council approved a preliminary plat for Stonebridge Park on October 7,
1997.
-A final plat for Lot 1 was approved by P&Z on October 23, 1997.
-P&Z approved a final plat for Lots 2 – 6 on January 22, 1998.
-A revised site plan for the animal hospital on Lot 1 was approved by City
Council on March 19, 2002.
-City Council approved a change of zoning to “S-P-2” and concept plan on
May 3, 2005.
TRANSPORTATION
Master Thoroughfare Plan
ASSESSMENT:
The Master Thoroughfare Plan does not make any recommendations for
Stonebridge Lane.
Existing Area Road Network and Conditions
Stonebridge Park has dedicated a street, Stonebridge Lane, which intersects
with W. Southlake Boulevard. Only a portion of the street has been built. The
applicant is proposing to extend the street but has proposed and received
approval for a reduced right-of-way width of 40 feet with 10-foot utility
easements on either side in lieu of the standard right-of-way width of 60 feet for
commercial streets. The proposed lots will have frontage onto Stonebridge
Lane.
W. Southlake Boulevard is a five-lane, undivided thoroughfare with a
continuous, two-way, center left-turn lane. The width of the roadway is
Case No. Attachment A
ZA 05-152 Page 1
sufficient to be a seven-lane roadway and is planned to be resurfaced and re-
striped this summer.
May, 2005 traffic counts on W. Southlake Blvd (between Pearson Ln &
F.M. 1938)
24hr 17,30316,915
West Bound (WB) () East Bound (EB) ()
WB 9001,881
Peak A.M. () Peak P.M. ()
11:15 – 12:15 a.m.5:30 – 6:30 p.m.
EB 1,6261,186
Peak A.M. () 7 – 8 a.m. Peak P.M. () 5 – 6 p.m.
PATHWAYS MASTER
PLAN: According to the Master Pathways Plan, an 8-foot multi-use trail is planned
along the creek channel. The trail was shown on the concept plan. Staff is
recommending that the trail and necessary easement be extended from the
development’s internal sidewalk system to the southeast corner of Lot 7,
Timberline Estates. This will allow continuation of the trail along the street
ROW for Timberline Lane and will eliminate the need to acquire additional
easements.
WATER & SEWER: An 8-inch water line currently exists along the north side of W. Southlake
Boulevard adjacent to this lot. The applicant is proposing to extend a 6-inch
sanitary sewer line from the west.
DRAINAGE ANALYSIS: This development will drain to the proposed Stonebridge Lane which will direct
storm water to the proposed detention pond that outfalls into the existing creek
adjacent to the site.
TREE PRESERVATION: A tree survey of the property was submitted with the Plat Revision plan. A
considerable amount of existing trees will be preserved in the northeast comer
of Lots 3R1 and 4R1 and also in the southwest corner of Lot 5R2. Almost all
of the existing trees on the other lots are located within the building pads,
parking lots, fire lanes and sidewalks.
SOUTHLAKE 2025: Land Use Recommendations
LU: Low Density Residential/T-1.
Site Specific Recommendation (from the Davis/F.M. 1938 Corridor Plan):
Encourage lower intensity office and/or residential uses transitioning to the
existing neighborhoods to the north and west.
Mobility Plan Recommendations
Continue to improve bicycle and pedestrian circulation. Provide
sidewalks/trails along all streets. Encourage the development of a
pedestrian greenway along floodplains and creeks. Specifically, Southlake
Pathways recommends an 8’ multi-use trail linking Florence Road to F.M.
1709.
Case No. Attachment A
ZA 05-152 Page 2
Encourage automobile and pedestrian connectivity between adjoining
commercial developments in the corridor. This in turn will reduce auto
trips and turning movements on the arterial roadways and improve level of
service.
Environmental Resource Protection Recommendations
Preserve the floodplain as a natural stream corridor and as an asset to the
development of the site. Encourage the preservation of a tree buffer
adjoining the floodplain corridor. Protect the area’s surface and
groundwater sources from contamination.
P&Z ACTION: April 6, 2006; Approved (5-0) subject to Plat Review Summary No. 3, dated
March 31, 2006.
STAFF COMMENTS: Attached is Revised Plat Review Summary No. 3, dated April 12, 2006.
N:\Community Development\MEMO\2005cases\05-152PR.doc
Case No. Attachment A
ZA 05-152 Page 3
Case No. Attachment B
ZA 05-152 Page 1
Case No. Attachment C
ZA 05-152 Page 1
Case No. Attachment C
ZA 05-152 Page 2
PLAT REVIEW SUMMARY
ZA05-152Three04/12/06
Case No.: Revised Review No.: Date of Review:
Plat Revision – Lots 2R1 through 5R2, Block 1, Stonebridge Park Addition
Project Name:
APPLICANT: Realty Capital Corporation SURVEYOR: Herbert S. Beasley Land Surveyors
Rian Maguire Herbert S. Beasley
32 Village Lane, Suite 200 P.O. Box 8873
Colleyville, TX 76034 Fort Worth, TX 76124
Phone: (817) 488-4200 Phone: (817) 429-0194
Fax: (817) 424-2448 Fax: (817) 446-5488
CITY STAFF HAS REVIEWED THE ABOVE REFERENCED PROJECT RECEIVED BY THE CITY ON 03/20/06 AND WE
OFFER THE FOLLOWING STIPULATIONS. THESE STIPULATIONS ARE HEREBY MADE CONDITIONS OF PLAT
APPROVAL UNLESS SPECIFICALLY AMENDED BY THE CITY COUNCIL. IF YOU HAVE ANY QUESTIONS OR NEED
FURTHER CLARIFICATION, PLEASE CONTACT BEN BRYNER AT (817) 748-8602.
1)Correct the bearing in the legal description for call number 6.
2)Show and label all interior property corners as to type and size of monuments and whether found or
set. A note may be the easiest way to address this.
3)Remove the zoning and land use designation labels on adjacent properties.
4)Update the utility companies in the signature block to represent all current utility companies.
5)Provide a minimum 10’ pedestrian access easement to extending from the development’s internal
sidewalk/trail system to the southeast corner of Lot 7, Timberline Estates. The alignment of the
easement shall be designed to have minimal impact on removal of existing trees.
6)This plat will not be filed until the construction plans have been approved and the streets and utilities
substantially installed. This will ensure adequate easements and finish floor elevations. As shown on
the submitted plat revision, the entire R.O.W. for Stonebridge Lane and all public utilities must be
constructed prior to filing the plat.
INFORMATIONAL COMMENTS
* All development must comply with the City’s Drainage Ordinance No. 605 and detain all post
development run-off.
* Although there are a few lot lines which are not perpendicular or radial, they appear to meet the intent
of this requirement.
* We recommend this plat not be filed until the construction plans have been substantially approved.
This will ensure adequate easements and finish floor elevations.
Case No. Attachment D
ZA 05-152 Page 1
* Please submit a revised blueline "check print" prior to submitting blackline mylars with original
signatures.
* A “Certificate of Taxes Paid” indicating that there are no delinquent taxes owed on the subject property
from each taxing authority must be provided to the City prior to filing this plat in the County records. A
copy of this information may be obtained from the Tarrant county Tax Assessor/Collector’s Office
located at 100 E. Weatherford St. in Ft. Worth (across from the old red courthouse). There is a service
charge of $10 per account for this certificate. For more information contact the Assessor/Collector’s
office at (817) 884-1103.
blackline
* Original signatures and seals will be required three mylars prior to filing the plat. Also
required are two sets of owner's dedications and notaries (8.5" x 11" or 14" paper) with original
signatures and seals on each. Mylars will not be accepted if any erasures or original ink, other than
signatures or seals, appear on the plat.
* A Developer’s Agreement is required prior to construction of any public infrastructure. The
Developer’s Agreement for this addition should consider streets, drainage, park dedication
requirements and fees, off-site sewer extensions, off-site drainage and utility easements and impact fees.
Case No. Attachment D
ZA 05-152 Page 2
Case No Review No.Dated: Number of Pages:
. 05-152 _Two_ March 9, 200 1 ___
Project Name:
Stonebridge Park (Plat Revision)
Comments due to the Planning Department:
March 9, 2006______
ContactPhone:Fax:
: Keith Martin (817) 748-8229__________ (817) 481-5713___________
===========================================================================
The following comments are based on the review of plans received on February 27, 2006 . Comments designated with a
number may be incorporated into the formal review to be considered by either the Planning and Zoning Commission or City
Council. Other items will not be addressed by either the P&Z or City Council. It is the applicant’s responsibility to contact the
.
department representative shown above and make modifications as required by the comment
===========================================================================
TREE PRESERVATION COMMENTS:
Is a tree survey required?
1. A tree survey of the property was submitted with the Plat Revision plan. A considerable amount of
existing trees will be preserved in the northeast comer of Lots 3R1 and 4R1 and also in the southwest
corner of Lot 5R2. Almost all of the existing trees on the other lots are located within the building
pads, parking lots, fire lanes and sidewalks.
Non-residential Development:
2. In a non-residential development, all protected trees that the
Landscape Administrator determines must be altered in order to install utility lines within public
R.O.W. or public utility or drainage easements as shown on an approved Final Plat, or to install fire
lanes, required parking areas and building pad sites as shown on an approved Site Plan, shall be exempt
from the tree protection and tree replacement requirements listed in Sections 7 and 8 of the Tree
Preservation Ordinance. Any protected trees within these areas that the Landscape Administrator
determines do not have to be altered shall be subject to the tree protection requirements listed in
Section 8 of the Tree Preservation Ordinance, but not to the tree replacement requirements listed in
Section 7 of the Tree Preservation Ordinance. All other areas of the development shall be subject to
both the tree replacement and the tree protection requirements, and all other provisions of the Tree
Preservation Ordinance.
Case No. Attachment D
ZA 05-152 Page 3
Surrounding Property Owners
Stonebridge Park – Plat Revision
Owner Zoning Land Use Acreage
1.N T V M G Llp SP-2 Retail Commercial 0.935
2.Stonebridge Monticello Pt Ltd SP-2 Office Commercial 1.478
3.Stonebridge Monticello Pt Ltd SP-2 Office Commercial 3.173
4.Stonebridge Monticello Pt Ltd SP-2 Office Commercial 1.515
5.Stonebridge Monticello Pt Ltd SP-2 Office Commercial 2.112
6.Stonebridge Monticello Pt Ltd SP-2 Retail Commercial 3.696
Case No. Attachment E
ZA 05-152 Page 1
Surrounding Property Owner Responses
Stonebridge Park – Plat Revision
Notices Sent: Two (2)
Responses Received: None (0)
Case No. Attachment F