Item 4BCity of Southlake, Texas
MEMORANDUM
September 18, 2007
To: Shana Yelverton, City Manager
From: Robert H. Price, P.E., Public Works Director
Subject: Award construction bid to WHF Electrical Contractors for $55,500.00
for electrical modifications to Shady Lane and Lonesome Dove lift
stations to provide for the use of a backup power generator.
Action
Requested: Award construction bid to WHF Electrical Contractors for $55,500.00 for
electrical modifications to Shady Lane and Lonesome Dove lift stations to
provide for the use of a backup power generator.
Background
Information: In order to provide sanitary sewer service throughout the City of
Southlake it is necessary to pump a considerable amount of the wastewater
to overcome differences in ground elevations. We operate twelve (12)
sewer lift stations as a part of the routine delivery of wastewater service in
the city. In order to provide uninterrupted sewer service during power
outages, we are able to maintain operation of all but two of these lift
stations with the use of portable back -up pumps. Due to the size of the
two remaining lift stations, the only reasonable means of operation during
a power failure is with the use of a backup generator. On May 1, 2007
council awarded a bid to purchase a trailer mounted generator which will
be delivered before the end of the year. In order to use the backup power
source it is necessary to modify the electrical components at the two lift
stations in question.
Two bids were received on August 28, 2007 for the necessary
modifications of the two lift stations. The bids have been reviewed by
City's engineering consultant and their recommendation is attached.
It is recommended that the City Council award the bid for these
modifications to WHF Electrical Contractors for the lump sum price of
$55,500.00.
Financial
Considerations: Funding for these electrical modifications has been carried forward from
the FY -07 to the FY -08 operating budget for Wastewater Utilities for the
purpose of completing this project.
Citizen Input/
Board Review: None
Legal
Review: None.
Alternatives: The City Council may approve or deny this bid award.
Supporting
Documents: Engineer's recommendation and Bid Tabulation.
Staff
Recommendation: Award construction bid to WHF Electrical Contractors for $55,500.00 for
electrical modifications to Shady Lane and Lonesome Dove lift stations to
provide for the use of a backup power generator.
Staff
Contact: Robert H. Price, P.E., Public Works Director
Chuck Kendrick, Deputy Director of Public Works - Operations
Q ,s,I A re
Deltatek Engineering
August 31, 2007
Mr. Chuck Kendrick
Deputy Director of Public Works
City of Southlake
1950 E. Continental Blvd
Southlake, Texas 76092
Reference: Generator Transfer Switch Installation for
Lonesome Dove and Shady Lane
Wastewater Lift Stations
Bid Review and Recommendation
Dear Mr. Price:
On August 28, 2007, City of Southlake received two (2) sealed bids for the installation of
the referenced Lift Stations. These bids have been tabulated and attached to this
correspondence for your use. Deltatek Engineering has reviewed these bid documents and
submits the following opinion and recommendation.
Based on review of the bid submitted by WHF Electrical Contractors, Inc., review of
references from other Owners', and prior experience with this contractor, it is our opinion
that the low bidder is qualified to perform this task in accordance with the contract
documents.
Therefore, it is our recommendation to award this project to WBF Electrical Contractors,
Inc. for lump sum of $55,500.00.
Should you have any questions, please call rite at 469- 3749800.
Sincerely,
DELTATEK ENGINEERING
oe Ezzell
Attachments: Bid Tabulation
Bid Documents
14114 Dallas Parkway, Suite 480, Dallas, Texas 75254
(469) 374 -9800 Fax (469) 374 -9801