Item 9BCity of Southlake, Texas MEMORANDUM September 4, 2007 To: Shana Yelverton, City Manager From: Robert H. Price, P.E., Public Works Director Subject: Approve a Residential Developer's Agreement for Saddleback Ridge Estates, a 32 lot addition, located west of the intersection of East Bob Jones Road and White Chapel Boulevard. Action Requested: Approve a Residential Developer's Agreement with Lahoda Group, Inc. for Saddleback Ridge Estates, a 32 lot addition, located west of the intersection of East Bob Jones Road and White Chapel Boulevard. Background Information: The developer will construct approximately 2,300 LF of public street, 435 LF of off -site public street improvements, 2,300 LF of on -site public water line, 1,240 LF of off -site public water line, 3,200 LF of on -site public sanitary sewer line, 2,300 LF of off -site public sanitary sewer force main and an on -site lift station. This developer's agreement covers the construction of these public improvements. Financial Considerations: The construction of 1,240 LF of 12" off -site public water line is in accordance with the City's Water Master Plan. An 8" off -site water line is required to serve the proposed development; therefore, the City will reimburse the developer the difference in the cost of an 8" line and a 12" line (amount not to exceed $17,360). The location of the entrance to the development, as proposed by the developer, would create a potential traffic hazard to vehicles entering and exiting the development, as well as vehicles traveling along West Bob Jones Road. At the proposed intersection location, there would only be approximately 95 feet of stopping sight distance along West Bob Jones Road to the east of the proposed development entrance. The existing sight distance of 95 feet does not meet the minimum stopping sight distance standard for a 30 mile per hour speed limit as published by the American Association of State Highway and Transportation Officials (AASHTO). In order to safely accommodate the proposed location of the development entrance, the vertical alignment of West Bob Jones Road would need to be adjusted. The proposed 435 LF of off -site street improvements would increase the stopping sight distance along West Bob Jones Road to meet the AASHTO standards for stopping sight distance. The developer is requesting reimbursement by the City for these off -site street improvements in the amount of $58,820. A sanitary sewer lift station is required to provide sewer service to the development. The developer is requesting reimbursement from the City for upgraded pumping capacity in the amount of $1,500. By upgrading the lift station pumping capacity form 60 gallons per minute (gpm), as originally proposed, to 75 gpm, the proposed lift station can comfortably serve an additional 20 acres located northeast of the proposed development. The additional acreage includes 8 existing residences, 2 unoccupied lots and an undeveloped 10 acre tract. The developer is also requesting reimbursement from the City in the amount of $2,500 for lift station panel enclosure upgrades. The panel enclosure proposed by the developer (NEMA 3R) is not corrosion resistant. The upgraded panel enclosure (NEMA 4X) is stainless steel and corrosion resistant. Both enclosures are weather resistant, which is required because the panels are usually located outdoors. The City normally houses lift station controls in NEMA 4X enclosures. The developer will pay park dedication fees in the amount of $48,000. Citizen Input/ Board Review: None Legal Review: This is the City's standard residential developer's agreement, originally, drafted by the City Attorney. Alternatives: The City Council may approve it, deny it or modify it. Supporting Documents: Location Map Proposed Utility Layout Developer's request for City participation Standard Residential Developer Agreement Staff Recommendation: Approve a Residential Developer's Agreement with Lahoda Group, Inc. for Saddleback Ridge Estates, a 32 lot addition, located west of the intersection of East Bob Jones Road and White Chapel Boulevard. Page 2 of 3 Staff Contact: Robert H. Price, P.E., Director of Public Works Gordon Mayer, P.E., Deputy Director of Public Works / City Engineer Michael James, P.E., Civil Engineer Page 3 of 3 U) (D w U ], p V i u Ca O W Rf Q U W i UL p I 1 L 4 J � W / ^ � - k ! - vI O O a0� -: ------ - - - - -- - - - -- W w Lu W H U Z 0 Q O H LU • W Q H H W W H N Fn N Q Q Q L LL CL cn O O LL LL LL LL LL O O O O O Z M M M N N _ a N N M T- N 2 August 7, 2007 Planning Department Attn: Bob Price, P.E. City of Southlake 1400 Main Street, Suite 310 Southlake, Texas 76092 RE; Saddleback Ridge Estates Southlake, Texas Mr. Price, As a result of the design and plan development process for Saddleback Ridge Estates, Spectra Land /LaHoda Group has been asked to bear the cost of two items that are outside of standard City participation policy, but warrant reimbursement. These include upgraded components for an oversized lift station to accommodate surrounding parcels, and an upgraded lift station control panel and the reconstruction of Bob Jones Road immediately adjacent to the development. Per our conversations we are assuming that the upgraded water line meets the standard City participation policy. In a construction plan comment letter dated November 6, 2006, Adams Engineering was asked to evaluate the ability to provide lift station service to the entire basin or a larger portion of the basin, in addition to this development. This comment was further discussed in a meeting on November 10, 2006 in which City representatives expressed their willingness to reimburse the developer for any additional costs that may be incurred in order to provide the additional service. Adams was able to incorporate an additional 20 acres of service area into the design, which resulted in some changes in the pump components as shown in Exhibit A. In addition to the over sizing of the pump components, in a letter dated January 24, 2007 Adams was instructed to specify a NEMA 4X control panel for the lift station instead of the NEMA 3R that was included in the original design. Upon further discussion of this upgrade with the City, it was explained that this was a preference by Public Works, and the additional cost would be reimbursed to the developer. In a letter dated January 24, 2007, a comment was issued by Teague Nall and Perkins for the grading plan which read `Evaluate possible sight - distance issues along E. Bob Jones to the east of Saddleback Lane. Provide ,profile to confirm findings" Bob Jones Road was evaluated by Adams Engineering and a stopping sight distance of ±93 feet was determined for the future intersection, which is not adequate per AASHTO requirements. As a response to this comment, warning signs were proposed to caution drivers as they approach the intersection as this is a common occurrence with other comparable communities and or subdivisions within Southlake. A subsequent comment letter was received from Teague Nall and Perkins on March 7, 2007 commenting further on the sight distance issue with suggestions of reconstructing the roadway or shifting the entrance to the subdivision. Through several discussions with the City staff, it was made clear that the design would not be approved with E. Bob Jones Road remaining in its current configuration. A final design was reached which shows the reconstruction 435 linear feet of E. Bob Jones Road adjacent to the development reducing the crest of the existing hill to meet AASHTO sight distance requirements, which has been recently approved by City staff. In closing our request for participation is in the Amount of $80,180.00. This includes $58,820.00 for Bob Jones Improvements, Lift Station Upgrades for $4,000.00 and Water Line Upgrade differential for $17,360.00. Please reference the attached appendix "A" for a line item breakdown for the requested participation. Thank you and your staff for all the help, very much appreciated. Please should you hesitate to call. time and effort provided towards this project, it is have any questions or require clarification do not Kind Regards, Tom LaHoda LaHoda Group, Inc. PO Box 699 Colleyville, Texas 76034 Phone: 817 - 233 -2323 Fax: 817 - 552 -3512 Email: tom @lahodaarow.com CONATSER CONS I RUC I ION I X, L.P. 5327 Wichita Street ° P.O. Box 15448 • Fort Worth, Texas 76119 July 10, 2007 ADAMS ENGINEERING 500 Nolen Drive, Suite. 550 Southlake, Texas 76092 Proposal BOB JONES ROAD IMPROVEMENTS Sub Total $58,820.00 LIFT STATION IMPROVEMENTS Lift Station Panel Upgrades (See attached Appendix A) 1 1 Lump Sum $2,500.001 $2,500.00 Lift Station Pump Upgrades (See attached Appendix A) 1 1 Lump Sum $1,500.001 $1,500.00 Sub Total $4.000.00 WATER LINE IMPROVEMENTS - Option 1 8" PVC Water Line with fittings 1240 1 L. F. $21.001 $26,040.00 WATER LINE IMPROVEMENTS - Option 2 12" PVC Water Line with fittings 1240 1 L. F. $35.001 $43,400.00 Total Proposal Amount - Option 1 $88,860.00 Total Proposal Amount - Option 2 $106,220.00 Respectfully Submitted, Conatser Construction TX, LP Mark Pappas Mark Pappas (817) 534 -1743 • Fax (817) 534 -4556 www.conatserconstruction.coni Quantity Unit Unit Cost Conatser Total General Excavation 1180 C.Y. $7.00 $8,260.00 Inlet Protection 1 Each $300.00 $300.00 18" RCP 27 L. F. $70.00 $1,890.00 36x36 VFG Grate Inlet 1 Each $3,500.00 $3,500.00 HMAC 912 S.Y. $28.00 $25,536.00 Concrete Ribbon 145 S.Y. $50.00 $7,250.00 Sawcut Existing Asphalt Pavement 45 L. F. $10.00 $450.00 Remove Existing Culvert - Bob Jones Rd 1 Each $750.00 $750.00 Traffic Control 1 Lump Sum $4,500.00 $4,500.00 Remove Existing Asphalt 912 S.Y. $7.00 $6,384.00 Sub Total $58,820.00 LIFT STATION IMPROVEMENTS Lift Station Panel Upgrades (See attached Appendix A) 1 1 Lump Sum $2,500.001 $2,500.00 Lift Station Pump Upgrades (See attached Appendix A) 1 1 Lump Sum $1,500.001 $1,500.00 Sub Total $4.000.00 WATER LINE IMPROVEMENTS - Option 1 8" PVC Water Line with fittings 1240 1 L. F. $21.001 $26,040.00 WATER LINE IMPROVEMENTS - Option 2 12" PVC Water Line with fittings 1240 1 L. F. $35.001 $43,400.00 Total Proposal Amount - Option 1 $88,860.00 Total Proposal Amount - Option 2 $106,220.00 Respectfully Submitted, Conatser Construction TX, LP Mark Pappas Mark Pappas (817) 534 -1743 • Fax (817) 534 -4556 www.conatserconstruction.coni SADDLEBACK RIDGE ESTATES RESIDENTIAL DEVELOPER AGREEMENT B. Since the Developer is prepared to develop the Addition as rapidly as possible and is desirous of selling lots to builders and having residential building activity begin as quickly as possible and the City is desirous of having the Addition completed as rapidly as possible, the City agrees to release 10% of the lots, 3 , after installation of the water and sewer mains. Framing shall not commence until water quality is approved by the City and all appropriate Fire Code requirements are satisfied and street signs with street names are in place. Temporary all- weather metal signs securely fastened in the ground are acceptable until permanent street signs are installed. The Developer recognizes that the remaining building permits or Certificates of Occupancy for residential dwellings will not be issued until the supporting public works infrastructure including permanent street signs with block numbers and regulatory signs within the Addition have been accepted by the City. This will serve as an incentive to the Developer to see that all remaining items are completed. C. The Developer will present to the City either a cash escrow, Letters of Credit or performance bond and payment bond acceptable to the City guaranteeing and agreeing to pay an amount equal to 100% of the value of the construction cost of all of the facilities to be constructed by the Developer, and providing for payment to the City of such amounts, up to the total remaining amounts required for the completion of the Addition if the Developer fails to complete the work within two (2) years of the signing of this Agreement between the City and Developer. All bonds shall be issued by a Best -rated bonding company. All Letters of Credit must meet the Requirements for Irrevocable Letter of Credit attached hereto and incorporated herein. Page 1 of 20 The value of the performance bond, Letters of Credit or cash escrow will reduce at a rate consistent with the amount of work that has been completed by the Developer and accepted by the City. Each request for reduction or payment of escrow funds must be accompanied by lien release(s) executed by all subcontractors and /or suppliers prior to the release of escrow funds or reduction in value of the account. Performance and payment bond, Letters of Credit or cash escrow from the prime contractor(s) or other entity reasonably acceptable to the City, hereinafter referred to as Contractor, will be acceptable in lieu of Developer's obligations specified above. D. The Developer agrees to furnish to the City maintenance bonds, letters of credit or cash escrow amounting to 100% of the cost of construction of underground utilities and 100% of the construction cost for paving. These maintenance bonds, letters of credit or cash escrow will be for a period of two (2) years and will be issued prior to the final City acceptance of the Addition. The maintenance bonds, letters of credit or cash escrow will be supplied to the City by the contractors performing the work, and the City will be named as the beneficiary if the contractors fail to perform any required maintenance. F. It is further agreed and understood by the parties hereto that upon acceptance by the City, title to all facilities and improvements mentioned hereinabove shall be vested in the City and Developer hereby relinquishes any right, title or interest in and to said facilities or any part thereof. It is further understood and agreed that until the City accepts such improvements, the City shall have no liability or responsibility in connection with any such facilities. Acceptance of the facilities shall occur at such time that the City, through its City Manager or his duly authorized representative, provides Developer with a written acknowledgement that all facilities are complete, have been inspected and approved and are being accepted by the City. Page 2 of 20 G. On all public facilities included in this Agreement for which Developer awards his own construction contract, Developer agrees to the following procedure: 1. Developer agrees to pay the following: a. Inspection fees equal to three percent (3 %) of the cost of the water, street, drainage and sanitary ;sewer facilities, on all facilities included in this Agreement for which Developer awards his or her own construction contract, to be paid prior to construction of each phase and based on actual bid construction cost; b. Administrative Processing fee equal to two percent (2 %) of the cost of water, street, drainage and sanitary sewer facilities, on all facilities included in this Agreement for which Developer awards his or her own construction contract, to be paid prior to construction of each phase and based on actual bid construction cost; C. Trench testing (95 % Standard d additional charge for inspections during Saturday, ay, holidays, and after normal working hours; rges for re to ting as a result of failed tests; f. grad' required to insure proper cement and /or Tirl%e stabilization. 2. The City agrees to bear the expense of: a. All nuclear density tests on the roadway subgrade (95% Standard); b. Technicians time for preparing concrete cylinders; and C. Concrete cylinder tests and concrete coring samples. The City can delay connection of buildings to service lines or water mains constructed under this Agreement until said water mains and service lines have been completed to the satisfaction of and acceptance by the City. Page 3 of 20 H. The Developer and any third party, independent entity engaged in the construction of houses, hereinafter referred to as "Builder" will be responsible for mowing all grass and weeds and otherwise reasonably maintaining the aesthetics of all land and lots in said Addition which have not been sold to third parties. After fifteen (15) days written notice, should the Developer or Builder fail in this responsibility, the City may contract for this service and bill the Developer or Builder for reasonable costs. Should such cost remain unpaid for 120 days after notice; the City can file a lien on such property so maintained. I. Any guarantee of payment instrument (Performance Bond, Letter of Credit, etc.) submitted by the Developer or Contractor on a form other than the one which has been previously approved by the City as "acceptable" shall be submitted to the City Attorney and this Agreement shall not be considered in effect until such City Attorney has approved the instrument. Approval by the City shall not be unreasonably withheld or delayed. J. Any surety company through which a bond is written shall be a surety company duly authorized to do business in the State of Texas, provided that the City, through the City Manager, shall retain the right to reject any surety company as a surety for any work under this or any other Developer's Agreement within the City regardless of such company's authorization to do business in Texas. Approval by the City shall not be unrea ably withheld or delayed II. FACILITIES Page 4 of 20 B. DRAINAGE D. STREETS 1. The street construction in the Addition shall conform to the requirements in accordance with plans and specifications to be prepared by the Developer's engineer and released by the Director of Public Works. Streets will be installed in accordance with the plans and specifications to be prepared by the Developer's engineer and released by the Director of Public Works. 2. The Developer will be responsible for: a. Installation and two year operation cost of street lights, which is payable to the City prior to final acceptance of the Addition; or an agreement with utility provider stating that no charge will be made for street lights for the two -year duration. b. Installation of all street signs designating the names of the streets inside the Addition, said signs to be of a type, size, color and design standard generally employed by the Developer and approved by the City in accordance with City ordinances. C. Installation of all regulatory signs recommended based upon the Manual of Uniform Traffic Control Devices as prepared by the Developer's engineer by an engineering study or direction by the Director of Public Works. It is understood Page 5 of 20 that Developer may put in signage having unique architectural features, however, should the signs be moved or destroyed by any means the City is only responsible for replacement of standard signage. 3. All street improvements will be subject to inspection and approval by the City. No work will begin on any street included herein prior to complying with the requirements contained elsewhere in this Agreement. All water, sanitary sewer, and storm drainage utilities which are anticipated to be installed within the street or within the street right -of -way will be completed prior to the commencement of street construction on the specific section of street in which the utility improvements have been placed or for which they are programmed. It is understood by and between the Developer and the City that this requirement is aimed at substantial compliance with the majority of the pre - planned facilities. It is understood that in every construction project a decision later may be made to realign a line or service which may occur after construction has commenced. The Developer hereby agrees to advise the City Director of Public Works as quickly as possible when such a need has been identified and to work cooperatively with the City to make such utility change in a manner that will be least disruptive to street construction,or stability. E. ON SITE SANITARY SEWER FACILITIES The Developer hereby agrees to install sanitary sewerage collection facilities to service lots as shown on the final plat of the Addition. Sanitary sewer facilities will be installed in accordance with the plans and specifications to be prepared by the Developer's engineer and released by the City. Further, the Developer agrees to complete this installation in compliance with all applicable city ordinances, regulations and codes and shall be responsible for all construction costs, materials and engineering. In the event that certain sewer lines are to be oversized because of City requirements, the City will reimburse the Developer for the oversize cost greater than the cost of an 8" line. F. EROSION CONTROL During construction of the Addition and after the streets have been installed, the Developer agrees to keep the streets free from soil build -up. The Developer agrees to use soil control measures, such as those included in the NCTCOG STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, Division 1000 EROSION AND SEDIMENT CONTROL to prevent soil erosion. It will be the Developer's responsibility Page 6 of 20 to present to the Director of Public Works a soil control development plan that will be implemented for this Addition. When in the opinion of the Director of Public Works there is sufficient soil build -up on the streets or other drainage areas and notification has been given to the Developer, the Developer will have seventy -two (72) hours to clear the soil from the streets or affected areas. If the Developer does not remove the soil from the street within 72 hours, the City may cause the soil to be removed either by contract or City forces and place the soil within the Addition at the Developer's expense. All expenses must be paid to the City prior to acceptance of the Addition. After construction of the Addition and prior to acceptance by the City, the Developer agrees to have a permanent erosion control plan prepared and approved by the Director of Public Works and have the plan installed and working, effectively, in the opinion of the Director of Public Works. This erosion control will prevent soil erosion from the newly created lots from washing into street rights of way, drainage ways or other private property. G. AMENITIES It is understood by and between the City and Developer that the Addition may incorporate a number of unique amenities and aesthetic improvements such as ponds, aesthetic lakes, unique landscaping, walls and may incorporate specialty signage and accessory facilities. The Developer agrees to accept responsibility for the construction and maintenance of all such aesthetic or specialty item such as walls, vegetation, signage, landscaping, street furniture, pond and lake improvements until such responsibility is turned over to a homeowners association. H. USE OF PUBLIC RIGHT -OF -WAY It is understood by and between the City and Developer that the Developer may provide unique amenities within public right -of -way, such as landscaping, irrigation, lighting, etc., for the enhancement of the Addition. The Developer agrees to maintain these amenities until such responsibility is turned over to a homeowners association. The Developer and his successors and assigns understand that the City shall not be responsible for the replacement of these amenities under any circumstances and further agrees to indemnify and hold harmless the City from any and all damages, loss or liability of any kind whatsoever by reason of injury to property or third person occasioned by its use of the public right -of -way with regard to these improvements and the Developer shall, at his own cost and expense, defend and protect the City against all such claims and demands. Page 7 of 20 START OF CONSTRUCTION Before the construction of the streets, and the water, sewer, or drainage facilities can begin, the following must take place: 1. Approved payment and performance bonds must be submitted to the City in the name of the City prior to the commencement of any work. 5. The Developer, or Contractor, shall furnish to the City a policy of general liability insurance, naming the City as co- insured, prior to commencement of any work. All insurance must meet the Requirements of Contractor's Insurance attached hereto and incorporated herein. A. INDEMNIFICATION' DEVELOPER COVENANTS AND AGREES TO INDEMNIFY AND DOES HEREBY INDEMNIFY, HOLD HARMLESS AND DEFEND CITY, ITS OFFICERS, AGENTS, SERVANTS AND EMPLOYEES, FROM AND AGAINST ANY AND ALL CLAIMS OR SUITS FOR PROPERTY DAMAGE OR LOSS AND /OR PERSONAL INJURY, INCLUDING DEATH, TO ANY AND ALL PERSONS OF WHATSOEVER KIND OR CHARACTER, WHETHER REAL OR ASSERTED, (INCLUDING, WITHOUT LIMITATION, REASONABLE FEES AND EXPENSES OF ATTORNEYS, EXPERT WITNESSES AND OTHER CONSULTANTS), ARISING OUT OF OR IN CONNECTION WITH, DIRECTLY OR INDIRECTLY, THE CONSTRUCTION, MAINTENANCE, OCCUPANCY, USE, EXISTENCE OR LOCATION OF SAID IMPROVEMENT OR IMPROVEMENTS, AND SHALL FURTHER BE LIABLE FOR INJURY OR DAMAGE TO CITY PROPERTY, ARISING OUT OF OR IN Page 8 of 20 CONNECTION WITH ANY AND ALL ACTS OR OMISSIONS OF DEVELOPER, ITS OFFICERS, AGENTS, SERVANTS, EMPLOYEES, CONTRACTORS, SUBCONTRACTORS, LICENSEES, OR INVITEES, SAID INDEMNIFICATION TO REMAIN IN EFFECT UNTIL THE CITY ACCEPTS THE ADDITION. DEVELOPER AGREES TO INDEMNIFY THE CITY, ITS OFFICERS AND EMPLOYEES FOR ANY DAMAGES, CLAIMS OR LIABILITIES ARISING FROM THE NEGLIGENT ACT OR OMISSION, OR OF THE CONCURRENT NEGLIGENT ACT OR OMISSION, OF THE CITY, ITS OFFICERS AND EMPLOYEES. B. Venue of any action brought hereunder shall be in Fort Worth, Tarrant County, Texas. C. Approval by the Director of Public Works or other City employee of any plans, designs or specifications submitted by the Developer pursuant to this Agreement shall not constitute or be deemed to be a release of the responsibility and liability of the Developer, his engineer, employees, officers or agents for the accuracy and competency of their design and specifications. Such approval shall not be deemed to be an assumption of such responsibility and liability by the City for any defect in the design and specifications prepared by the consulting engineer, his officers, agents, servants or employees, it being the intent of the parties that approval by the Director of Public Works signifies the City's approval on only the general design concept of the °improvements to be constructed. In this connection, the Developer shall for a period of two (2) years after the acceptance by the City of the completed construction project, indemnify and hold harmless the City, its officers, agents, servants and employees, from any loss, damage, liability or expense on account of damage to property and injuries, including death, to any and all persons which may arise out of any defect, deficiency or negligence of the engineer's designs and specifications incorporated into any improvements constructed in accordance therewith, and the Developer shall defend at his own expense any suits or other proceedings brought against the City, its officers, agents, servants or employees, or any of them, on account thereof, to pay all expenses and satisfy all judgement which may be incurred by or rendered against them or any of them in connection herewith. D. This Agreement or any part herein, or any interest herein, shall not be assigned by the Developer without the express written consent of the City Manager, which shall not be unreasonably withheld or delayed. E. On all facilities included in this Agreement for which the Developer awards his own construction contract, the Developer agrees to employ a construction contractor who is approved by the City, and whose approval Page 9 of 20 shall not be unreasonably withheld or delayed, said contractor to meet City and statutory requirements for being insured, licensed and bonded to do work in public streets and to be qualified in all respects to bid on public streets and to be qualified in all respects to bid on public projects of a similar nature. F. Work performed under the Agreement shall be completed within two (2) years from the date thereof. In the event the work is not completed within the two (2) year period, the City may, at its election, draw on the performance bond, Letter of Credit, or other security provided by Developer and complete such work at Developer's expense, provided however, that if the construction under this Agreement shall have started within the two (2) year period, the City may agree to renew the Agreement with such renewed Agreement to be in compliance with the City policies in effect at that time. G. The City is an exempt organization under Section 151.309, Tax Code, and the facilities constructed under this Agreement will be dedicated to public use and accepted by the City upon acknowledgement by the City of completion under Paragraph 1.F. 1. The purchase of tangible personal property, other than machinery or equipment and its accessories, repair, and replacement parts, for use in the performance of this Agreement is, therefore, exempt from taxation under Chapter 151, Tax Code, if the tangible property is: a. (necessary and essential for the performance of the Agreement; and completely consumed at the job site. 2. The purchase of a taxable service for use in the performance of this Agreement is exempt if the service is performed at the job site and if: a. this Agreement expressly requires the specific service to be provided or purchased by the person performing the Agreement; or b. the service is integral to the performance of the Agreement. H. Prior to final acceptance of the Addition, the Developer shall provide to the City four (4) copies of Record Drawings of the Addition, showing the facilities as actually constructed. Page 10 of 20 Such drawings will be stamped and signed by a registered professional civil engineer. In addition, the Developer shall provide electronic files showing the grading plan and drainage area map; the plan and profile of the sanitary sewer, storm drain, roadway and waterline; all lot lines, and tie in to the state Plane Coordinate System. IV. OTHER ISSUES A. OFF -SITE DRAINAGE B. DOWNSTREAM CRITICAL STRUCTURE FEE There is no Downstream Critical Drainage Structure Fee associated with this development. C. LIFT STATION AND OFF -SITE SANITARY SEWER The developer will construct a lift station within the subdivision and approximately 2,300 LF of off -site sanitary sewer force main to serve this development. The City will reimburse the developer an amount not to exceed $4,000.00 for upgraded lift station pumping capacity and upgraded lift station control panel enclosures when the lift station has been constructed and accepted by the City.. D. OFF -SITE WATER JV The developer will extend approximately 1,240 LF of 12" water line along West Bob Jones Road as required by the City's Water Master Plan. The City will reimburse the developer an amount not to exceed $17,360.00 for the difference in cost between an 8" water line and the 12" water line when the water line has been constructed and accepted by the City. E. PARK FEES The developer will pay park dedication fees in the amount of $48,000. F. OFF -SITE ROADWAY IMPROVEMENTS The developer will construct 435 LF of off -site roadway improvements to West Bob Jones Road. The City will reimburse the developer an amount not to exceed $58,820.00 for off -site street improvements to West Bob Jones Road when the off -site street improvements have been constructed and accepted by the City. G. TREE PRESERVATION ORDINANCE Page 11 of 20 All construction activities shall comply with the current Tree Preservation Ordinance requirements and as may be amended by the City Council. Such conditions include, but are not limited to, proper posting of tree protection warning signs and tree protective fencing to be maintained throughout the duration of the project. SIGNED AND EFFECTIVE on the date last set forth belc DEVELOPER: By: Title: Address: STATE OF TEXAS COUNTY OF TAR On Public, personally appeared i e/ , Notary personally known to me (or proved to me on the basis of satisfactory evidence) to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument, the person, or the entity upon behalf of which the person acted, executed the instrument. WITNESS my hand and official seal. Notary Public Page 12 of 20 (SEAL) My commission expires: CITY OF SOUTHLAKE, TEXAS la Andy Wambsganss, Mayor ATTEST: Lori Farwell, City Secretary Date: Page 13 of 20 REQUIREMENTS FOR IRREVOCABLE LETTER OF CREDIT 1. The Letter of Credit must have a duration of at least one year. 2. The Letter of Credit may be substituted for utility security deposits exceeding $10,000.00. The City reserves the right to specify the face amount of the Letter of Credit. 3. The Letter of Credit must be issued by a FDIC insured bank in a form acceptable to the City of Southlake. The City reserves the right to approve /disapprove the bank issuing the Letter of Credit. 4. The Letter of Credit must be issued by a bank that has a minimum capital ratio of six percent (6 %), and has been profitable for each of the last two consecutive years. 5. The customer must provide the City with supporting financial information on the bank to allow the City to ascertain requirements are met. Suitable financial information would be the previous two (2) years December 31 Call Reports submitted to the FDIC and audited financial statements. 6. Partial drawings against Letter of Credit must be permitted. 7. The City must be able to draft on sight with proof of amount owed. 8. The customer pays any and all fees associated with obtaining Letter of Credit. 9. Expiring Letter of Credit must be replaced by substitute Letters of Credit at least 30 days prior to the expiration date on the Letter of Credit held by the City. Page 14 of 20 REQUIREMENTS FOR CONTRACTOR'S INSURANCE Contractor's Insurance Without limiting any of the other obligations or liabilities of the CONTRACTOR, during the term of the Contract, the CONTRACTOR shall purchase and maintain the following minimum insurance coverages with companies duly approved to do business in the State of Texas and satisfactory to the CITY. In this section "Project" shall mean the public facilities to be constructed by Developer or under Developer's contract with a CONTRACTOR. Coverages shall be of the following types and not less than the specified amounts: Workers' compensation as required by Texas law, with the policy endorsed to provide a waiver of subrogation as to the CITY; employer's liability: insurance of not less than the minimum statutory amounts. Commercial general liability insurance, including premises- ''operations; independent CONTRACTOR's liability, completed operations and contractual liability covering, but not limited to, the liability assumed under the indemnification provisions of this Contract, fully insuring CONTRACTOR's (or Subcontractor's) liability for injury to or death of CITY's employees and third parties, extended to include personal injury liability `coverage with damage to property of third parties, broad form property damage, with minimum limits as set forth below: General Aggregate ........ ........$2,000,000 Bodily Injury $1,000,000 Each Occurrence Property Damage $1,000,000 Each Occurrence Products — Components /Operations Aggregate..$ 1,000,000 Personal and Advertising Injury ............ $ 1,000,000 (With Employment Exclusion deleted) Each Occurre ce ...................... $ 1,000,000 Contractual `,ility: d. Property Insurance (Builder's All Risk) 0) CONTRACTOR shall purchase and maintain, at all times during the term of its Contract with the Developer property insurance written on a builder's risk "all - risk" or equivalent policy form in the amount of the initial contract price, plus value of subsequent contract modifications and cost of materials supplied or installed by others, comprising total value for the entire Project at the site on a Page 15 of 20 replacement cost basis without optional deductibles. Such property insurance shall be maintained, unless otherwise in writing by all persons and entities who are beneficiaries of such insurance, until final payment has been made, or until no person or entity other than the CITY has an insurable interest in the property required by this paragraph to be covered, whichever is later. This insurance shall include interests of the CITY, the CONTRACTOR, Subcontractors and Sub - Subcontractors in the Project. (ii) Property insurance shall be on an "all- risk" or equivalent policy form and shall include, without limitation, insurance against the perils of fire (with extended coverage) and physical loss or damage including, without duplication of coverage, theft, vandalism, malicious mischief, collapse, earthquake, flood, windstorm, falsework, testing and startup, temporary buildings and debris removal including demolition occasioned by enforcement of any applicable legal requirements, and shall cover reasonable compensation for CONTRACTOR's services and expenses required as a result of such insured loss. (iii) If the insurance required by this paragraph requires deductibles, the CONTRACTOR shall pay costs not covered because of such deductibles. (iv) This property insurance shall cover portions of the Work stored off the site, and also portions of the Work in transit. d. OWNER's Protective Liability Insurance: (i) CONTRACTOR shall obtain, pay for and maintain at all times during the prosecution of the work under the contract between the CONTRACTOR and the Developer, a CITY's protective liability insurance policy naming the CITY as insured for property damage and bodily injury, which may arise in the prosecution of the work or CONTRACTOR's operations under the contract. (ii) Coverage shall be on an "occurrence" basis, and the policy shall be issued by the same insurance company that carries the CONTRACTOR's liability insurance with a combined bodily injury and property damage minimum limit of $1,000,000 per occurrence. e,` "Umbrella" Liability Insurance: The CONTRACTOR shall obtain, pay for and maintain umbrella liability insurance during the term of the Contract between the CONTRACTOR and the Developer, insuring CONTRACTOR for an amount of not less than $5,000,000 per occurrence combined limit for bodily injury and property damage that follows form and applies in excess of the primary `I,iability' coverages required herein above. The policy shall provide "drop down" coverage where underlying primary insurance coverage limits are insufficient or exhausted. Page 16 of 20 Policy Endorsements Each insurance policy to be furnished by CONTRACTOR shall include the following conditions by endorsement to the policy: name the CITY as an additional insured as to all applicable policies; b. each policy shall require that 30 days prior to cancellation, non - renewal or any material change in coverage, a notice thereof shall be given to CITY by certified mail. If the policy is canceled for nonpayment of premium, only 10 days written notice to CITY is required; C. the term "CITY" shall include all authorities, boards, bureaus, commissions, divisions, departments and offices of the CITY and individual members, employees and agents thereof in their official capacities, and /or while acting on behalf of the CITY; d. the police please "other insurance" shall not apple to the CITY where the CITY is an additional insured on the polio . 2. Special Conditions a. Insurance furnished by the CONTRACTOR shall be in accordance with the following requirements: i. any policy submitted shall not be subject to limitations, conditions or restrictions deemed inconsistent with the intent of the insurance requirements to be fulfilled by CONTRACTOR. The CITY's decision thereon shall be final; ii. all policies are to be written through companies duly licensed to transact that class of insurance in the State of Texas; and iii. all liability policies required herein shall be written with an "occurrence" basis coverage trigger. b.. CONTRACTOR agrees to the following: I. CONTRACTOR hereby waives subrogation rights for loss or damage to the extent same are covered by insurance. Insurers shall have no right of recovery or subrogation against the CITY, it being the intention that the insurance policies shall protect all parties to the contract and be primary coverage for all losses covered by the policies; ii. companies issuing the insurance polices and CONTRACTOR shall have no recourse against the CITY for payment of any premiums or assessments for any deductibles, as all such premiums and deductibles are the sole responsibility and risk of the CONTRACTOR; iii. approval, disapproval or failure to act by the CITY regarding any insurance supplied by the CONTRACTOR (or any Subcontractors) shall not relieve the CONTRACTOR of full responsibility or liability for damages and accidents as set forth in the Contract Documents or this Agreement. Neither shall be bankruptcy, insolvency or denial of liability by the insurance company exonerate the CONTRACTOR from liability; Page 17 of 20 V. deductible limits on insurance policies exceeding $10,000 require approval of the CITY; vi. any of such insurance policies required under this paragraph may be written in combination with any of the others, where legally permitted, but none of the specified limits may be lowered thereby; vii. prior to commencement of operations pursuant to this Contract, the Developer or the Developer's CONTRACTOR shall furnish the CITY with satisfactory proof that he has provided adequate insurance coverage i .z amounts and by approved carriers as required by this Agreement; viii ix. X. CONTRACTOR shall provide notice of any adW.,or potential claim or litigation that would affect required insurance coverages to the CITY in a timely manner; CONTRACTOR agrees to either require its Subcontractors to maintain the same insurance coverage and limits as specified for the CONTRACTOR or coverage of Subcontractors shall be provided by the Contract; and Page 18 of 20 Page 19 of 20 Page 20 of 20