Loading...
Item 9BCity of Southlake, Texas M E M O R A N D U M August 7, 2007 To: Shana Yelverton, City Manager From: Robert H. Price, P.E., Public Works Director Subject: Authorize the purchase of Truck-mounted Sewer Jet-Cleaner from Rush Truck Centers and Harben through Houston-Galveston Council of Governments in the amount of $129,308.81. Action Requested: Authorize the purchase of Truck-mounted Sewer Jet-Cleaner from Rush Truck Centers and Harben through Houston-Galveston Council of Governments (HGAC) in the amount of $129,308.81. Background Information: A routine function of the maintenance of the sanitary sewer collection systems is to “jet or power wash” the buried pipes which carry waste water. This process is a proactive measure to prevent blockages caused by grease and other debris and insures that the system retains its design capacity thereby preventing sewer overflows and backups into private property. This equipment is available through the cooperative purchasing program offered by the HGAC. The truck cab and chassis will be purchased from Rush Truck Centers of Texas for a cost of $60,437.00. The sewer cleaning equipment is to be provided by Harben at a cost of $68,871.81 and will be mounted on the truck. If authorized by the Council to purchase this equipment, the City Manager will authorize a line item reallocation in the Public Works Utility Fund/Wastewater budget to fund the purchase of this equipment. The ability to execute budget line item reallocations are currently within the authority level of the City Manager. Financial Considerations: There is adequate funding in the FY 07 Wastewater operations budget to purchase this equipment. Citizen Input/ Board Review: None Legal Review: None. Alternatives: The City Council may approve it, deny this proposal. Supporting Documents: HGAC pricing worksheets from Rush Truck Centers of Texas and Harben. Staff Recommendation: Authorize the purchase of Truck-mounted Sewer Jet-Cleaner from Rush Truck Centers and Harben. Staff Contact: Robert H. Price, P.E., Public Works Director Chuck Kendrick, Public Works Operations Manager 10200 NORTH LOOP EAST HOUSTON, TX 77029 CONTRACT PRICING WORKSHEET ContractDate 6/29/2007 HT-11-05 No.:Prepared: For Standard Equipment Purchases This Form must be prepared by Contractor and given to End User. The H-GAC administrative fee shall be shown in Section F. End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H- GAC @ 713-993-4548. Please type or print legibly. Buying City of Southlake, Texas RUSH TRUCK CENTERS OF TEXAS L.P. Contractor: Agency: ContactPrepared C. KendrickBOB LAKE Person:By: 817-481-5581713-495-6314/800-580-7383 Phone:Phone: 817-748-8103713-695-9620 Fax:Fax: laker@rush-enterprises.com ckendrick@ci.southlake.tx.us Email:Email: Product GMC C6500 WITH 17' VAN BODY DC Description: Code: A. Product Item Base Unit Price Per Contractor's H-GAC Contract: $26,362.00 B. Published Options - Itemize below - Attach additional sheet(s) if necessary - Include Option Code in description if applicable. (Note: Published Options are options which were submitted and priced in Contractor's bid.) DescriptionDescription CostCost 200HP DURAMAX DIESEL80,000 PSI FRAME $12,756.00$ 250.00 2 PASSENGER SEATREINFORCE FRAME $ 250.00150.00$ AIR CONDITIONING17' VAN BODY $ 5,339.00705.00$ 260" WHEELBASE $ 920.00 AIR COMPRESSOR714.00$ DUAL TANKS 75 GALLON TOTAL341.00$ AM-FM STEEO297.00$ TILT AND CRUISE CONTROL $ 158.00 14 PLY TIRES $ 1,150.00 FLOOR PLAN $ 650.00 MODEL SPECIFIC AUTO/DIESELSubtotal From Additional Sheet(s): $ 2,500.00$ - DEALER SERVICE PACK $ 650.00 Subtotal B: $26,830.00 C. Unpublished Options - Itemize below / attach additional sheet(s) if necessary. (Note: Unpublished options are items which were not submitted and priced in Contractor's bid.) DescriptionDescription CostCost REAR LOCKING DIFFERENTIALMaximizer Roll Up Doors Rear,Curbside and Roadside $ 245.003800 DIAMOND PLATE FLOOR Subtotal From Additional Sheet(s): $ 2,200.00 TO CUSTOMER SPECS Subtotal C: $ 6,245.00 Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit For this transaction the percentage is: $ 0.12 Price plus Published Options (A+B). D. Other Cost Items Not Itemized Above (e.g. Installation, Freight, Delivery, Etc.) DescriptionDescription CostCost Subtotal D: $ - E. Total Cost Before Any Applicable Trade-In / Other Allowances / Discounts (A+B+C+D) $59,437.00 Quantity Ordered: X Subtotal of A + B + C + D: 159437=Subtotal E: $59,437.00 F. H-GAC Fee Calculation (From Current Fee Tables) Subtotal F: $ 1,000.00 G. Trade-Ins / Other Allowances / Special Discounts DescriptionDescription CostCost Subtotal G: $ - Delivery Date: PoolH. Total Purchase Price (E+F+G): $60,437.00 CONTRACT PRICING WORKSHEET ContractDate 6/29/2007 SC0106 No.:Prepared: For Standard Equipment Purchases This Form must be prepared by Contractor and given to End User. The H-GAC administrative fee shall be shown in Section F. End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H- GAC @ 713-993-4548. Please type or print legibly. Buying City of Southlake, Texas Harben Contractor: Agency: ContactPrepared C. KendrickJ.P. Sonnier Person:By: 817-481-5581972-479-1335 Phone:Phone: 817-748-8103972-479-1336 Fax:Fax: ckendrick@ci.southlake.tx.usjerry@sewertools.com Email:Email: Product Harben 4025 DTD Water Jet CO10 Description: Code: A. Product Item Base Unit Price Per Contractor's H-GAC Contract: 46488 B. Published Options - Itemize below - Attach additional sheet(s) if necessary - Include Option Code in description if applicable. (Note: Published Options are options which were submitted and priced in Contractor's bid.) DescriptionDescription CostCost Hose Footage CounterUpgrade to 4018 Performance 8121980 Pivoting Hose Reel Hydraulic Powered Retractable Station 2959938 Strobe Light PackageJump Jet Pulsation 3311037 Arrowboard w LEDMKII Safety Gun with HV Jets 980941 Hose Reel Speed Control 110 Subtotal From Additional Sheet(s): Subtotal B: 10088 C. Unpublished Options - Itemize below / attach additional sheet(s) if necessary. (Note: Unpublished options are items which were not submitted and priced in Contractor's bid.) DescriptionDescription CostCost Water Tank Upgrade to 1050 GallonsUnloader System ILO Rupture Disc System 55412300 Diesel Upgrade 65HP Tier 2 EmissionsSubtotal From Additional Sheet(s): 1987 Subtotal C: 9828 Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit For this transaction the percentage is: 17% Price plus Published Options (A+B). D. Other Cost Items Not Itemized Above (e.g. Installation, Freight, Delivery, Etc.) DescriptionDescription CostCost Delivery to Southlake Texas 1450 Subtotal D: 1450 E. Total Cost Before Any Applicable Trade-In / Other Allowances / Discounts (A+B+C+D) 67854 Quantity Ordered: X Subtotal of A + B + C + D: 167854=Subtotal E: 67854 F. H-GAC Fee Calculation (From Current Fee Tables) Subtotal F: 1017.81 G. Trade-Ins / Other Allowances / Special Discounts DescriptionDescription CostCost Subtotal G: 0 Delivery Date: Sept. 28,2007H. Total Purchase Price (E+F+G): 68871.81