Loading...
Item 4CITEM 4C Approve a Professional Services Agreement for design services on the 20-inch water line along SH 114 from Town Square to North White Chapel Boulevard with Cheatham and Associates, Inc. in the amount of $134,410.00. Location Map 20-Inch Water Line Professional Services Agreement Background Connects the T.W. King pump station to the Miron Drive elevated tower Closes the loop of the 20-inch transmission line Construction funding is in FY 2011 and FY 2012 CIP Budget Proposed Contract EXPENSES: Basic Services $ 84,295.00 Special Services $ 50,115.00 Total Fees $134,410.00 Funds available in FY2008 CIP RECOMMENDATION Approve a Professional Services Agreement for design services on the 20-inch water line along SH 114 from Town Square to North White Chapel Boulevard with Cheatham and Associates, Inc. in the amount of $134,410.00. Questions? Bob Price 817-748-8097