Item 4CCITY OF SOUTH LAKE MEMORANDUM (September 7, 2010) To: Shana Yelverton, City Manager From: Robert H. Price, P.E., Director of Public Works Subject: Approve Change Order No. 2 with Quality Excavation, Ltd. for the Quail Creek Neighborhood Sewer in the amount of $60,977.50. Action Requested: Approve Change Order No. 2 with Quality Excavation, Ltd. for the Quail Creek Neighborhood Sewer in the amount of $60,977.50. Background Information: In October 2009, Quality Excavation, Ltd began construction of the Quail Creek Neighborhood Sewer improvements. Asphalt overlay of the neighborhood streets was also included in the construction contract. Change Order No. 1 was approved in March 2010 by the City Manager's office. This change order included work within the existing drainage easement to regrade the swale between 2600 and 2601 Quail Run Court and install ConLock pavers for grade control and was in the amount of $29,287.20. Also included in this change order was the installation of a storm sewer pipe and construction of a grate inlet structure. Change Order No. 2 includes scope changes to resolve resident concerns, additional work required because of unexpected or hidden conditions, and reconciliation of contract quantities. Examples of the scope changes include the replacement of an exposed aggregate sidewalk and driveway repairs at one residence and installation of additional block sod at several locations throughout the project. Additional drainage pipe and ditch grading was included to provide a mowable slope for another residence. Several base failure locations under the existing pavement not associated with installation of the sewer line were also identified requiring repair prior to the asphalt overlay. The existing water line was found to be in conflict with the sewer line in three locations and had to be lowered. Change Order No. 2 also includes the reconciliation of the contract quantities. An example of the reconciliation is that pressure sewer pipe had to be installed instead of standard sewer pipe in several locations because of proximity to the water line to conform to TCEQ regulations. This reduced the quantity of standard SDR -35 pipe, but increased the quantity of C900 DR -18 pressure pipe. The sewer line and paving activities have been completed. The residents will be notified by letter that the sewer is available for connection beginning September 7, 2010. Financial Considerations: The original contract amount awarded to Quality Excavation Ltd was $630,891.15. Change Order No. 1 was for $29,287.20 to bring the revised contract amount to $660,178.15. Change Order No. 2 in the amount of $60,977.50 brings the total project contract amount to $721,155.85. The contract price is within the original project budget of $982,264.00 Strategic Link: The construction of the sanitary sewer line and associated paving activities link to the city's strategy map relative to the focus areas of Infrastructure and Performance Management and Service Delivery. The specific corporate objectives that are met by this construction project include: Providing high quality customer service and Investing to provide and maintain high quality public assets. Citizen Input/ Board Review: None Legal Review: This is the Change Order form that has been previously reviewed by the City Attorney. Alternatives: The City Council may approve Change Order No. 2 or deny it. Supporting Documents: Location Map Change Order No. 2 Staff Recommendation: Approve Change Order No. 2 with Quality Excavation, Ltd. for the Quail Creek Neighborhood Sewer in the amount of $60,977.50. Staff Contact: Robert H. Price, P.E., Director of Public Works Gordon J. Mayer, Jr., P.E. Deputy Director of Public Works Michelle McCullough, P.E. Civil Engineer �. r h Q f0 C O (6 U O J K 0 J r F N�± A p t OF ti t IL �+` .�^. �"' � _._ � ate." � ��• d ` At w `A �`+ '. .. 3 !� i - �• . ti's A l CHANGE ORDER No. 2 Dated: August 17, 2010 OWNER'S Project No. 09 -020 Project: Sanitary Sewerlmprovements & StreetOverlay - Quail Creek Estates OWNER Contract for Sewer and Paving Iniprovements Contract Date: October 6, 2009 To: Quality Excavation, Ltd. Contractor You are directed to make the changes noted below in the subject contract for the dollar amount stated below including all labor, equipment, materials, overhead, and profit: Nature of the changes: Unit IA - Quail Creek Estates Sanitary Sewer 1. Delete 79 LF 8" Dia SDR 35 PVC SS Pipe 6' -8' depth ($40 / LF) $(3,160.00) 2. Delete 157 LF - 8" Dia SDR 35 PVC SS Pipe 8' -10' depth ($44 / LF) (6,908.00) 3. Delete 16 LF 8" Dia SDR 35 PVC SS Pipe 10' -12' depth ($49 / LF) (784.00) 4. Delete 32 LF 8" Dia SDR 35 PVC SS Pipe 12' -14' depth ($56 / LF) (1,792.00) 5. Delete 33 LF 8" Dia SDR 35 PVC SS Pipe 14' -16' depth ($61 / LF) (2,013.00) 6. Delete 33 LF 8" Dia SDR 35 PVC SS Pipe 16' -18' depth ($62 / LF) (2,046.00) 7. Delete 10 LF 8" Dia SDR 35 PVC SS Pipe 18' -29' depth ($76 / LF) (760.00) 8. Add 79 LF - 8" Dia C900 DR -18 Water Pipe 6' -8' depth ($45 / LF) 3,555.00 9. Add 197 LF - 8" Dia C900 DR -18 Water Pipe 8' -10' depth ($50 / LF) 9,850.00 10. Add 137 LF - 8" Dia 0900 DR -18 Water Pipe 10' -12' depth ($52 / LF) 7,124.00 11. Add 32 LF - 8" Dia C900 DR -18 Water Pipe 12' -14' depth ($56 / LF) 1,792.00 12. Add 33 LF - 8" Dia C900 DR -18 Water Pipe 14' -16' depth ($62 / LF) 2,046.00 13. Add 33 LF - 8" Dia 0900 DR -18 Water Pipe 16' -18' depth ($65 / LF) 2,145.00 14. Add 10 LF - 8" Dia C900 DR -18 Water Pipe 18' -20' depth ($80 / LF) 800.00 15. Add 1 EA - 5' diameter SSMH($4,250 / EA) 4,250.00 16. Add 8 VF - Additional depth for 5' SSMH ($3501 VF) 2,800.00 17. Add 89 SY - 6" 3000 PSI @ 28 Days ($48 / SY) 4,272.00 18. Add 20 SY - 6" 3000 PSI @ 28 Days ($45.80 / SY) 916.00 19. Add 17,520 SF - Block Sod of like grass ($0.40 / SF) 7,008.00 20. Add 3 EA - 6" water line lowering ($5,000 / EA) 15,000.00 21. Add 60 LF - 15" / 18" CMP / HDPE Drainage pipe ($64.70 / LF) 3,882.00 22. Delete 60 LF - Grade and Shape Ditch ($10 / LF) (600.00) 23. Delete 90 SF - Block Sod ($0.40 / SF) (36.00) 24. Add 1 - 285 SY Road Base Repair ($8,265 I L S) 8,265.00 25. Add 1 - Remove and replace exposed aggregate sidewalk ($1,800 / LS) 1,800.00 26. Add 1 - Remove and replace concrete drives ($701.50 / LS) 701.50 27. Add 1 -Additional Ditch Grading ($2,900 / LS) 2,900.00 28. Correction to Change Order No 1 total amount (30.010 Total $60,977.50 Page 1 of 3 These changes result in the following adjustment of contract price and contract time: Original Contract Price $ 630,891.15 Contract Price Including Previous Change Orders $ 660,178.35 Net Increase Resulting from this Change Order $ 60,977.50 Current Contract Price Including Change Order #2 S 721,155.85 The above changes are approved: City ofSouthlake City li Title: Mayor ofSouthlake Date: 2010 Page 2 of 3 Contract Time Prior to this Change 230 calendar days (Days or Date) Net Increase Resulting from this Change Order 0 calendar days (Days) Current Contract Time Including this Change Order Substantial Completion A ay 15, 2010 (Days or Date) The above changes are recommended: City ofSouthlake City li Title: City Engineer IN li City ofSouthlake City Title: ProiectAlanager Date: Cit� of Southlake City By: Title: Director Public Works Date: Quality Excavation, Ltd. Contractor li It Page 3 of 3