Item 4BCITY i a I
MEMORANDUM
October 5, 2010
To: Shana Yelverton, City Manager
From: Sharen Jackson, Director of Finance
Timothy Slifka, Purchasing Manager
Subject: Item 4B Approve the Purchase of Replacement Vehicles from
Philpott Motors in the amount of $168,998
Action
Requested: Authorization to purchase replacement vehicles from Philpott
Motors for Public Works Water and Inspections in the
amount of $168,998.
Background
Information: Per the City's Vehicle Replacement Plan /Policy the vehicles
are scheduled for replacement. In July 2010, staff contacted
Philpott Motors to secure vehicle pricing. The State of Texas
and City of Southlake bidding requirements have been met
by utilizing Houston Galveston Area Council (HGAC) and
BuyBoard cooperative purchasing contracts.
Financial
Considerations: The request will be funded through the City's vehicle
replacement fund budget for FY 2011.
Strategic Link: C1 — Achieve the highest standards of safety and security.
B2 — Collaborate with select partners to implement service
solutions.
F2 — Invest to provide and maintain high quality public
assets.
Citizen Input/
Board Review: None
Legal Review: None
Alternatives: Deny and retain the old vehicles. This will lead to an
increased cost to repair current vehicles.
Supporting
Documents: HGAC and BuyBoard Pricing Worksheets.
Staff
Recommendation: Approve the purchase of these vehicles from Philpott
Motors.
A. Pr e
Itm Base Unit Price Per Contractor's H -GAC Contract:
.. $ 20,013.00
H. Published Options - Itemize below -Attach additional sheet(s) if necessary - Include Option Code in description if applicable. I
(Note: Published Options are options which were submitted and priced in Contractors bid.)
Description
CONTRACT PRICING WORKSHEET
Contract
Description
Date
Cost
FLOOR PLAN INTEREST
For Standard Equipment Purchases
No.:
VE03 -06
Prepared:
9120110
This Form must be prepared by Contractor and given to EW User. The H -GAC administrative fee shall be shown in Section
F. End User issues PO to Contractor, and MUST also fax a copy ofPO, together with completed Pricing Worksheet, to H-
CAC @ 7I3 -993 -4548. Please type or print legibly.
Buying
Agency:
CITY OF SOUTBLAKE
Contractor.
PHILPOTT MOTORS
Contact
Person:
.TIM SLIFKA
Prepared
RICHARD HYDER
80.00
44T 6 -SPD AUTOMATIC TRANSMISSION
By:
-
Phone:
(817) 748 -8312
Phone.
(888) 973 -5338
Fax:
(817) 748 -8048
Pax:
(409) 724 -0886
Email:
TX.US
_ _ UTH
Erna[[:
RICHARD. HYDERO- PHILPOTTMOTORS.COM
Product
Cvde:
D28
Description: 2011 FORD F250 SUPER CAB PICKUP
A. Pr e
Itm Base Unit Price Per Contractor's H -GAC Contract:
.. $ 20,013.00
H. Published Options - Itemize below -Attach additional sheet(s) if necessary - Include Option Code in description if applicable. I
(Note: Published Options are options which were submitted and priced in Contractors bid.)
Description
Cost
Cost
Description
PDI CHARGE
Cost
FLOOR PLAN INTEREST
$
420.28
X313 ELECTRONIC LOCKING AXLE
$
366.00
LOT INSURANCE
$
60.04
90L POWER EQUIPMENT GROUP
$
799.00
99T 6.71, DIESEL B20
$
6,895.00
66S UPFITTER SWITCHES
$
80.00
44T 6 -SPD AUTOMATIC TRANSMISSION
$
-
52B TRAILER BRAKE CONTROLLER
$
195.00
AIR CONDITIONING
$
-
HEADACHE RACK
$
335.00
TELESCOPIC MIRRORS
$
-
LED LIGHTBAR W/ SPLIT TA
$
2,395.00
158" WB 8' BED
$
-
AMFM RADIO
$
UNIT 734
9400# GVWR
$
_
RECEIVER HITCH
$
-
SPARE TIRE AND WHEEL
$
-
Subtotal From Additional Sheet(s):
$
140/20/40 CLOTH SPLIT BENCH SEAT
$
100.00
Subtotal B:
$
11,645.32
C. Unpublished Options - Itemize below/ attach additional sheet(s) if necessary.
(Note: Unpublished options are items which were not submitted and priced in Contractor's bid.)
Description
Cost
Description
Cost
PDI CHARGE
$ 80.00
JESP 61100 PREMIUM $50 DED
$ 1,960.00
ADD 6 WERE ROUND TRAILER PLUG
$ -
Subtotal From Additional Sheet(s):
$ 1,759.00
WINDOW TINT LEGAL
$ 200.00
$ 36,317.32
Subtotai C:
$ 2,039.00
Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the !f-"
Price plus Published Options (A +B).
For this transaction the percentage is:
6%
ID. Other Cost Items Not Itemized Above (e.g. Installation, Freight, Delivery, Etc.) I
Description
Cost
Description
Cost
DELIVERY 300 MILES
$ 450.00
JESP 61100 PREMIUM $50 DED
$ 1,960.00
EQUIPMENT SERVICES
$ 210.00
H. Total Purchase Price (E +F +G): $ 36,317.32
Subtotal D:
$ 2,620.00
E. Total Cost Before Any Applicable Trade -In / Other Allowances / Discounts (A +B +C +D)
$ 36,317.32
Quantity Ordered:
I 1
I X Subtotal of A + B + C + D:
1 $ 36,317.32
=
Subtotal E:
$ 36,317.32
I F. H -GAC Fee Calculation (From Current Fee Tables)
Subtotal F:
$ -
1G. Trade -Ins / Other Allowances I Special Discounts
Description
Cost T Description
Cost
Subtotal G: $ -
Estimated Delivery Date:
90 DAYS ARO
H. Total Purchase Price (E +F +G): $ 36,317.32
PAGE 2 -- ADDITIONAL OPTIONS I Contract VE03 -06 I Date I 9/20/10
Nil.: !Prepared•
This Form must be prepared by Contractor and given to End User. The H GAC administrative fee shall be shown in Section
F. End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GAC @ 713 - 993-45
Buying
Agency:
CITY OF SOUTHLAKE
Contractor:
PHMPOTT MOTORS
Contact
Contact
TIM SLIFKA
prepared
B
RICHARD HYDER
Phone:
8177488312
Phone:
8889735338
Fax:
8177488048
Fax:
4097240886
Email:
TSLIFKACa7CI.S0UTHLAKE.TX.US
I Email:
RICHARD .HYDER@PHILPOTTMOTORS.COM
Product
Code:
D28
Description:
2011 FORD F250 SUPER CAB PICKUP
B. Additional
Published Options to be added to page
1
Description
Cost
Description
Cost
$ 110.00
HAVIS HDM136 UNIVERSAL FLOOR MOUNT
$ 61.00
HAVIS HDM401 SUPPORT BRACE
$ 45.00
Subtotal C.
$ 1,759.00
Subtotal B:
$ -
U. P►aanianai unpuousnea vpnons zo De aaaea zo page
i
Description
Cost
Description
Cost
WIGWAGS
$ 99.00
REAR FLASHERS
$ 99.00
4 KEYS
$ 100.00
WESTIN TUBULAR CAB STEPS
$ 225.00
HAVIS DOCKING STATION FOR CF30 W/ 2 PORTS
$ 795.00
HAVIS MD 102 ACTION ADAPTER
$ 225.00
HAVIS HDM202 9" LOWER POLE
$ 110.00
HAVIS HDM136 UNIVERSAL FLOOR MOUNT
$ 61.00
HAVIS HDM401 SUPPORT BRACE
$ 45.00
Subtotal C.
$ 1,759.00
J + CONTRACT PRICING WORKSHEET I Contract I V]EO3 -06 I Date 9/20110
t.I �� I For Standard Equipment Purchases No.: Prepared:
This Form must be prepared by Contractor and gtven to End User. The H -GAC administrative fee shall be shown in Section
F. End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
[Qa 713- 993 -4548. Please type or print legibly.
Buying
CITY OF SO UTHLAKE
C ontractor:
PHILPOTT MOTORS
Agency:
Cost
FLOOR PLAN INTEREST
$
Con
TIM SLIFKA
Prepared
RICHARD HYDER
Person:
$
d
Y
90L POWER EQUIPMENT GROUP
Phone:
(817) 748 -8312
Phone:
(888) 973 -5338
Fax:
(817) 748 -8048
Fax:
(409) 724 -0886
Email:
TSLIFKA &CI.SOl1THLAKE.TX.US
Email:
RICHARD. HYDER WHILPOTTMOTORS.COM
Product
D26
Ascription:
20
11 FORD F250 REGULAR CAB PICPICKUP
Code:
HEADACHE RACK
$
335.00
A. Product Item Base Unit Price Per Contractor's H -GAC Contract:
$ 18,062.00
B. Published Options - Itemize below - Attach additional sheet(s) if necessary - Include Option Code in description if applicable.
(Note: Published Options are options which were submitted and priced in Contractor's bid.)
Description
Cost
Cost
Description
PDI CHARGE
Cost
FLOOR PLAN INTEREST
$
379.31
X3E ELECTRONIC LOCKING AXLE
$
366.00
LOT INSURANCE
$
54.19
90L POWER EQUIPMENT GROUP
$
799.00
99T 6.7 V8 DIESEL B20
$
6,895.00
66S UPFITTER SWITCHES
$
80.00
44W 6 -SPD AUTOMATIC TRANSMISSION
$
-
5213 TRAILER BRAKE CONTROLLER
$
195.00
AIR CONDITIONING
$
-
HEADACHE RACK
$
335.00
TELESCOPIC MIRRORS
$
-
LED LIGHTBAR W/ SPLIT TA
$
2,395.00
56" CA
$
-
532 CAMPER PKG W/ REAR SPRING UPGRADE
$
110.00
AMFM RADIO
$
-
SERVICE BODY 56" CA **
$
4,810.00
9800# GVWR
$
-
UNIT #744
RECEIVER HITCH
$
-
..............................
SPARE TIRE AND WHEEL
$
Subtotal From Additional Sheet(s):
$
-
40/20/40 VINYL SPLIT BENCH SEAT is
-
Subtotal B:
$
16,418.50
C. Unpublished Options - Itemize below/ attach additional sheet(s) if necessary.
(Note: Unpublished options are items which were not submitted and priced in Contractor's bid.)
Description
Cost
Description
Cost
PDI CHARGE
$ 80.00
BED CREDIT
S (400.00)
ADD 6 WIRE ROUND TRAILER PLUG
$ -
Subtotal From Additional Sheet(s):
$ 6,585.00
WINDOW TINT LEGAL
$ 200.00
$ 43,565.50
1 Subtotal C:
$ 6,465.00
Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total ofthe Base Unit
Price plus Published Options (A +B).
For this transaction the percentage is:
19%
I D. Other Cost Items Not Itemized Above (e.g. Installation, Freight, Delivery, Etc.) I
Description
Cost
I Description
Cost
DELIVERY 300 MILES
$ 450.00
JESP 61100 PREMIUM $50 DED
$ 1,960.00
EQUIPMENT SERVICES
$ 210.00
1
1 Subtotal D:
S 2,620.00
E. Total Cost Before Any Applicable Trade -In / Other Allowances 1 Discounts (A+B+C +D)
$ 43,565.50
Quantity Ordered:
1
X Subtotal of A+ B+ C +D:
I S 43,565.50
=
Subtotal E.
$ 43,565.50
I F. H -GAC Fee Calculation (From Current Fee Tables)
Subtotal F:
$ 600.00
G. TradeAns / Other Allowances 1 Special Discounts
Description
Cost
Description
Cost
Subtotal G: $ -
Estimated Delivery Date
90 DAYS ARO H. Total Purchase Price (E +F +G): $ 44, 165.50
PAGE 2 -- ADDITIONAL OPTIONS I Contract I VE03 -06 Date I 9/20/10
No.: Prepared:
This Form must beprepared by Contractor and given to End User. The H -GAC administrative fee shall be shown in Section
F. End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GACQ 713- 993-45
Buying
Agency:
CITY OF SOUTHL
Contractor:
PHILPOTT MOTORS
Contact
person:
TIM SLIFK.A
Prepared
By:
RICHARD HYDER
Phones
8177488312
Phone:
8889735338
Fax:
8177488048
Fax:
4097240886
Email:
TSLl KA@Q1.SOUTHLAKE.TX.QS
Email: I
RICHARD. HYDER@PHILPOTE'MOTORS.COM
Product
Cade:
D26
Description:
2011 FORD F250 REGULAR CAB PICKUP
B. Additional
Published Options to be added to page
I
Description
Cost
Description
Cost
$ 110.00
HAVIS HDM136 UNIVERSAL FLOOR MOUNT
$ 61.00
DAVIS HDM401 SUPPORT BRACE
$ 45.00
WHELEN 700 LED AMBER/RED ON REAR
$ 361.00
"SERVICE BODY UPGRADE TO KNAPHEIDE 6961,
$ 4,465.00
WITH MASTER LOCK, SLIDE OUT DRAWER SYST
LED BODY LIGHTS
Subtotal C:
$ 6,585.00
Subtotal B•
$ -
4— Aaalzionai unpuousnea upnons to De aaaea ro page
it
Description
Cost
Description
Cost
WIGWAGS
$ 99.00
REAR FLASHERS
$ 99.00
4 KEYS
$ 100.00
WESTIN TUBULAR CAB STEPS
$ 225.00
HAVIS DOCKING STATION FOR CF30 W/ 2 PORTS
$ 795.00
HAVIS MD 102 ACTION ADAPTER
$ 225.00
HAVIS HDM202 9" LOWER POLE
$ 110.00
HAVIS HDM136 UNIVERSAL FLOOR MOUNT
$ 61.00
DAVIS HDM401 SUPPORT BRACE
$ 45.00
WHELEN 700 LED AMBER/RED ON REAR
$ 361.00
"SERVICE BODY UPGRADE TO KNAPHEIDE 6961,
$ 4,465.00
WITH MASTER LOCK, SLIDE OUT DRAWER SYST
LED BODY LIGHTS
Subtotal C:
$ 6,585.00
CUSTOMIZED PRODUCT PRICING SUMMARY BASED ON CONTRACT
Vehicles
BUYBOARD #281 -07
End User: CITY OF SOUTHLAKE
Contact: TIM SLOKA tsliflca@ci.southlake.lx.us
Product Description: 2011 FORD F450 CHASSIS T
A. Bid Series:
20
R. Pnhlkhed Ontions f1temi7e each helnwl
Philpott Rep: RICHARD HYDER
Date: 20- Sep-10
A. Base Price: I $ 22,733.00
Code
O tons
Bid Price
Code
O tons
Bid Price
HAVIS DOCKING STATION FOR CF30 W
FLOOR PLAN INTEREST
$ 477.40
52B
ELECTRIC BRAKE CONTROLLER
$ 216.00
2 5/16" BALL PIN= COMBO
LOT INSURANCE
$ 68.20
66S
UPFITTER SWITCHES
$ -
DD
FACTORY DESTINATION CHG
$ 975.00
535
HD TRAILER TOWING PKG
$ 329.00
99T
6.71, V8 DIESEL B20
$ 6,895.00
HIT
112X8 FLATBED DUMP
$ 7,229.00
44W
6 -SPD AUTO TRANSMISSION
$ 178.00
HIT
18" STAKE SIDES AND REAR
$ 1,667.00
572
AIR CONDITIONING
$ -
LED LIGHTBAR W/ SPLIT TA
$ 2,395.00
X4N
4.10 LIMITED SLIP AXLE
$ 338.00
$ 210.00
200
200" WHEELBASE 84" CA
$ 250.00
90L
POWER EQUIPMENT GROUP
$ 996.00
UNIT 747
AS
VINYL 40 /20/40 SEATING
$ -
512
SPARE TIRE AND WHEEL
$ 329.00
W4
1 16500#
CREW CAB UPGRADE
$ 3,008.00
GVWR
$ -
Total of B. Published Options: 1 $ 25,350.60
r_ IlnnubliAed Ontions fltemize each below. not to exceed 25 0 /.3
P= 16.7 %
Options
Bill Price
Options
Bid Price
PDI CHARGE
$ 80.00
HAVIS DOCKING STATION FOR CF30 W
$ 795.00
ANTHONY MODEL SM2500SF SIDE LIFT
$ 5,272.00
HAVIS MD 102 ACTION ADAPTER
$ 225.00
2 5/16" BALL PIN= COMBO
$ 250.00
HAVIS HDNUO2 9" LOWER POLE
$ 110.00
ROUND 6 WIRE CONNECTOR
$ -
HAVIS HDM136 UNIVERSAL FLOOR MO
$ 61.00
WHELEN 700 LED AMBER/RED
$ 361.00
HAVIS HDM401 SUPPORT BRACE
$ 45.00
WIGWAGS
$ 99.00
REAR FLASHERS
$ 99.00
4 KEYS
$ 6.00
WESTIN CAB STEPS
$ 225.00
WINDOW TINT LEGAL
$ 200.00
EQUIPMENT SERVICES
$ 210.00
Total of C. Unpublished Options: $ 8,038.00
D.
Contract Price Adjustment:
E.
Delivery Charges: 300 miles
$ -
F.
Totalof A +B +C +D +E =F
$ 56,121.60
G.
Quantity Ordered i x F =
$ 56,121.60
H.
BUYBOARD Administrative Fee ($400 per purchase order)
$ 400.00
1.
Non -Equip Charges & Credits ESP PREMUIM CARE 6/100 $100 DED $ 3,375.00
J.
TOTAL PURCHASE PRICE INCLUDING BUYBOARD FEE
$ 59,896.60
�1 CONTRACT PRICING WORKSHEET I Contract VE03 -06 I Date 9/20/10
r�~��II�JJ For Standard Equipment Purchases No.: Prepared: I I
This Form must be prepared by Contractor and given to End User. The H -GAC administrative fee shall he shown in Section
F. End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksh eel, to H-
GAC @ 7I3- 993 -4548. Please type or print legibly.
Bu yi ng
Agency.
CITY OF SOUTHLAKE
Contractor.
PHILPOTT MOTORS
Contact
Person:
TIM SLIFKA
Prepared
By:
RICHARD HYDER
Phone:
(817) 748 -83I2
Phone:
(888) 973 -5338
Fax:
(817) 748 -8048
Fax:
(409) 724 -0886
Email:
TSUFI{A(a CI.SOUTHLAKE.TX.US
Email:
RICHARD. HYDERAPHI_LPOTTMOTORS.COM
Product
Code:
D25 1 Aesertplion:
2010 FORD F150 SUPERCAB 4X4
A. Product Item Base Unit Price Per Contractor's H -GAC Contract:
$ 18,491.00
B. Published Options - .itemize below - Attach additional sheet(s) if necessary - Include Option Code in description if applicable. I
(Note: Published Options are options which were submitted and priced in Contractoes bid.)
Description
Cost
Cost
Description
PDI CHARGE
Cost
FLOOR PLAN INTEREST
$
582.47
EXTERIOR - -WHITE
$
-
LOT INSURANCE
$
83.21
1N'fERIOR -GRAY
$
-
AUTOMATIC TRANSMISSION
$
-
6 -WAX SWITCH13OX
$
119.00
AIR CONDITIONING
$
-
413 SKID PLATE PKG
$
99.00
ANTILOCK BRAKES
$
-
LED LIGHTBAR W/ SPLIT TA
$
2,395.00
145" 6.5' BED
$
-
CLOTH SEATING 40/20/40
$
-
UNIT 794
AMFM RADIO
$
-
99F 5.OL V8 GAS/E85
$
761.00
7050# GVWR
$
-
535 TRAILER TOWING PKG
$
350.00
Subtotal From Additional Sheet(s):
$
-
85A POWER EQUIPMENT GROUP
$
995.00
1 Subtotal B:
$
5,384.68
C. Unpublished Options - Itemize below / attach additional sheet(s) if necessary.
(Note: Unpublished options are items which were not submitted and priced in Contractor's bid.)
Description
Cost
Description
Cost
PDI CHARGE
$ 80,00
ADD 6 WIRE ROUND TRAILER PLUG
$ -
52B/54P TRAILER BRAKE CONTROLLER
$ 351.00
Subtotal From Additional Sheet(s):
$ 1,759.00
WINDOW TINT LEGAL
$ 200.00
$ 28,620.68
1 Subtotal C:
$ 2,390.00
Check. Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit
Price plus Published Options (A +B).
For this transaction the percentage is:
IO%
D. Other Cost Items Not Itemized Above (e g. Installation, Freight, Delivery, Etc.)
Description
Cost
I Description
Cost
DELIVERY 300 MILES
$ 450.00
ESP PREMIUM 61100 $50 DED
$ 1,695.00
EQUIPMENT SERVICES
$ 210.00
1
1 Subtotal D:
$ 2,355.00
E. Total Cost Before Any Applicable Trade -In I Other Allowances 1 Discounts (A +B+C +D)
$ 28,620.68
Quantity Ordered: 1
I X Subtotal of A + B + C + D: $ 28,620.68
=
Subtotal E:
$ 28,620.68
F. H -GAC Fee Calculation (From Current Fee Tables)
Subtotal F: I
$ -
G. Trade -Ins / Other Allowances 1 Special Discounts
Description
Cost
Description
Cost
Subtotal G $ -
Estimated Delivery Date:
90 DAYS ARO
H. Total Purchase Price (E +F +G): $ 28,620.68
4 1 PAGE 2-- ADDITIONAL OPTIONS I Contract I VE03 06 Date 9/20110
No.: Prepared:
This Form must be prepared by Contractor and given to End User. The H -GAC administrative fee shall be shown in Section
F. End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GAC @ 713- 993-45
Buying
Agency:
CITY OF SOUTHLAKE
Contractor:
PHILPOTT MOTORS
Contact
Person:
TIM SLIFKA
P
By re R ICHARD
HYDER
Phone:
5177488312
Phone:
8889735338
Fax:
8177488048
Fax:
4097240886
Entail:
TSL1FKA(CDCI.SOUTHLAKE.TX.US 77
Email: j
RICHARD. HYQER PHILPOTTMOTORS,COM
Product
Cade:
D
2010 FORD F150 SUPERCAB 4X4
B. Additional
Published Options to be added to page
1
Description
Cost
Description
Cost
HAVIS HDM136 UNIVERSAL FLOOR MOUNT
$ 61.00
HAVIS HDM401 SUPPORT BRACE
$ 45.00
Subtotal C:
$ 1,759.00
Subtotal B:
$ -
IC. Additional Unpublished Options to be added to page 1 ]
Description
Cost
Description
Cost
WIGWAGS
$ 99.00
REAR FLASHERS
$ 99.00
4 KEYS
$ 100.00
WESTIN TUBULAR CAB STEPS
$ 225.00
HAVIS DOCKING STATION FOR CF30 W/ 2 PORTS
$ 795.00
HAVIS MD 102 ACTION ADAPTER
$ 225.00
HAVIS HDM202 9" LOWER POLE
$ 110.00
HAVIS HDM136 UNIVERSAL FLOOR MOUNT
$ 61.00
HAVIS HDM401 SUPPORT BRACE
$ 45.00
Subtotal C:
$ 1,759.00