WS - Joint CC/PZCity Council & PZ Commission Work Session
October 5, 2010
Presentation Outline
Brief overview of the Drilling Process
SUP Process
Policies in Place - Review of the Comprehensive Plan, Zoning Ordinance and Gas Drilling & Production Ordinance
Emerging Technologies
Questions
OVERVIEW OF THE DRILLING PROCESS
Drilling Process
Preparation of the
Pad Site
Drilling Operation
Completion Phase
Production
Preparation of the Pad Site
Drilling Operations
Completion Phase
Production
Typical Production Site
Pipeline
OVERVIEW OF THE SUP PROCESS
Specific Use Permit (SUP) ProcessSUP Application Filed with CityStaff Review of SUPSPIN Meeting(s)Planning & Zoning Commission – Public HearingCity Council – Public Hearing
SUP Process
Application filed with the City
Staff Review of the SUP
SPIN Meeting
Public Hearings
POLICIES IN PLACE TO REVIEW DRILLING APPLICATIONS
Comprehensive Approach to
Oil & Gas Drilling
Southlake 2025 Plan
Provides rational nexus for the following:
Location
Operational
Environmental
Zoning Ordinance 480 -Specific Use Permit
Ordinance 880 - Oil & Gas Ordinance/
Road Repair Agreement
Well Permit
SUP Section/Ordinance 480
Permitted to submit an application in all districts.
No application for a SUP for gas or oil drilling and
production shall be considered complete unless it
is accompanied by at least one (1) administratively
complete application for a well and pipeline permit.
All information required for the gas and pipeline
permit must be submitted in conjunction with the
SUP application.
Pad site permit.
The SUP provides a mechanism for the City Council to establish regulations not defined in ordinance 880-A , the Railroad Commission or other City Ordinances.
Notification
SUP notification
- 200’ from the property boundary
- 1,000’ from the pad site
- 1,000’ from any pipeline
- 1,000’ from any access roads
1,000’
1,000’
200’
Parcel Boundary
Pad Site
Pipeline
Access
Road
Notification
1,000’
1,000’
1,000’
880-A Ordinance Overview
Definitions – p. 1 (9.5-222)
Variance Section – p. 7 (9.5-223)
- SUP (Variance requests)
- Gas Permit (Variance Requests)
- Supermajority
Appeal Procedure – p. 8 (9.5-224)
880-A Ordinance Overview
Road Repair Agreement
(9.5-231) p. 10
Statement of Intent
Fee paid based on construction cost estimates prepared by Licensed P.E.
Based upon projected truck loadings and current pavement condition
Predetermined Fee Structure
880-A Ordinance Overview
Seismic Survey Permit (9.5 -233) – p. 10
Survey Map
Process Description
Time Frame
Property Access
Proof of authorization
Notice (Signage)
$250 Permit Fee
880-A Ordinance Overview
9.5-256 Application and Review (p.11)
Filed with PDS
Proposed transportation routes
Well name
Surface owners contact information
Mineral lessee’s contact information
Owner/Operators contact information
Surface owner and address within 1,000’ of the drill site
Emergency contact information
Number of wells and pool information (acreage)
Railroad Commission Documentation
Ordinance 880-A Overview
Site Plan (p.12)
Location of drill site and operation site
Equipment
Lighting
Property Access
Property owners names
All structures within a 1000’
880-A Ordinance Overview
Water Source Plan (p.13)
Source
Anticipated Demand
Surface Impact
Transportation Method
Route Map
Clean up/Restoration
Ordinance 880-A Overview
Tree Protection Plan (p. 13)
Trees to be removed
(Pad/Approach)
Tree fencing
Tree Protection Signage
Removal method
Ordinance 880-A Overview
Erosion Control Plan (P. 13)
Proposed BMPs
Leaking Equipment
Spill Prevention
Waste Removal
Sludge Removal
Chemical Storage
Drainage Plan
Permanent BMPs
Post Rainfall BMP Inspection
Ordinance 880-A Overview
Hazardous Material Plan (P. 13)
Haz-Mat Response Plan
Container Labeling Plan
MSDS Sheets
Contact Information
Ordinance 880-A Overview
Emergency Response Plan & Fire Suppression Plan (p. 13)
Fire Emergencies
Leaks/Blow outs
Spills
Medical Emergencies
Emergency contacts
Evacuation Plan & Routes
Location of suppression equipment/hookups
Location and quantity of foam on site
Location of fire hydrants
Sources of ignition
Firefighter training and lesson plans
Ordinance 880-A Overview
Noise Management Plan (p. 13)
Acoustic Engineer
Ambient Noise Level
Mitigation-Acoustic
blankets
Drilling/Fracing times
Frequency of Readings
Enforcement/Inspection
Ordinance 880-A Overview
Screening and Fencing Plan (p. 13)
Pre and Post Production
Security fencing for equipment
Screening wall type (materials & height)
Plant material
Ordinance 880-A Overview
Signage Plan (p. 13)
On-site
Off-site
Emergency Contacts
Well/Pool Information
Pipeline
Truck Routes
Ordinance 880-A Overview
Third Party Landscaping Agreement (p. 14)
Frequency of the services to be provided
Service provider
Ordinance 880-A Overview
TCEQ – Depth of Useable Groundwater (p. 14)
Ordinance 880-A Overview
Dust Mitigation Plan (p. 14)
Ordinance 880-A Overview
Public Education (pp. 14 & 39)
Written timeline account of all events
Educational letter to all property
owners within 2000’ of the well site
Annual SPIN Meeting
Ordinance 880-A Overview
Revolving Account (p.14)
Maintain a $15,000 balance
Administrative Expenses
Consulting Fees
Contracting Fees
Funding of an Inspector Position
Ordinance 880-A Overview
Insurance and Indemnification (p. 18):
Each permit shall include Indemnification Language
$10,000,000 Minimum Combined Single Limit
$20,0000 – Annual general aggregate coverage
$10,000,000 – Umbrella Liability Insurance
$10,000,000 – Control of Well Insurance
$200,000 – Cash Bond
Ordinance 880-A Overview
On site Operations (p.22):
1,000 foot distance between the well bore and any habitable structure
1,000 foot distance between the well bore and the property line of a school or hospital
Ordinance 880-A Overview
On site Operations (p. 23):
Knox Box Security
Parking & travel ways shall be concrete
Maintain a temporary chain-link fence with all-weather screening
Masonry wall and interior security fencing required
Ordinance 880-A Overview
On site Operations (p. 24):
Blow Out Prevention Equipment (API Standards)
No air, gas or pneumatic drilling
Closed Loop Mud System
Drill Stem Testing (Daylight only)
Drip Pans-Containment Devices
Electric motors for pumping wells
Emergency Response Plan
Ordinance 880-A Overview
On site Operations (p. 29):
No Frac or surface ponds
No venting of gas
Firefighter Training
Shut off valves
Foam Line Arrestor
Ordinance 880-A Overview
On site Operations (p. 22):
Security System
Security Camera
Watchperson
Alarm systems
Ordinance 880-A Overview
On site Operations (p. 22):
Water Well Testing
- Pre-drilling & Post-Drilling
- Wells within 2,000 ft.
- Parameters need to be established
Ordinance 880-A Overview
Prohibited (p: 24-27):
Disposal Wells
Oil based drilling fluids
Drilling Storage Pit
Venting Gas into the atmosphere
Compressor Stations
H2S Gas
Ordinance 880-A Overview
Pipeline Permit
Require the location and description of pipelines in conjunction with SUP permit.
Plans must show the location of all known public utilities.
Lines must be buried a minimum of 8’ deep.
Notify all property owners within 1,000’ of the proposed line.
Public Education Program
Questions
Emerging Technologies
Vapor Recovery Units
Green Completions
Recycling Fracturing Water
Baseline & Continuous Testing of Air Quality
Baseline & Continuous Testing of Water Quality
Continuous Noise Monitoring
Shorter Well Rigs
No Bleed Pneumatic Valves and Fittings
QUESTIONS
Production Well
Head
Gas Well Production