Loading...
Item 4CCITY OF SOUTH LADE MEMORANDUM (September 21, 2010) To: Shana Yelverton, City Manager From: Robert H. Price, P.E., Director of Public Works Subject: Approve Change Order No. 6 with Quality Excavation for Dove Road Intersection and Drainage Improvements in the amount of $44,752.00 for sidewalks along North White Chapel Blvd. Action Requested: Approve Change Order No. 6 with Quality Excavation for Dove Road Intersection and Drainage Improvements in the amount of $44,752.00 for sidewalks along North White Chapel Blvd. Background Information: The contract for the Dove Road Intersection and Drainage Improvement project was awarded to Quality Excavation, Ltd. in April, 2009 for the construction of roundabouts at Dove and North Carroll Avenue and at Dove and North White Chapel Blvd. Change Order No. 6 is for the addition of an 8' sidewalk along North White Chapel Blvd. in accordance with the Master Pathways Plan from the north property line of the Dove Water tower to connect to the sidewalk of the new elementary school currently under construction. This addition of an 8' sidewalk is a change in the scope of the original project. This segment of sidewalk has not been on the City Council's previous sidewalk priority list; however, is proposed to be included in the FY 2011 Pathway Priority List. The contractor has provided an attractive price to construct this sidewalk that will be needed prior to the opening of the proposed Southlake Elementary School located on N. White Chapel Blvd. Construction of the sidewalk will begin immediately and will be completed with the Dove and White Chapel Roundabout Improvement Project. Financial Considerations: The total amount of Change Order No. 6 to the existing contract is $44,752.00. This will increase the total contract amount to $3,514,154.27. Funds for construction of the sidewalks are currently available in the CIP Sidewalks Account 209499-598804- R0005. Previous Contract Amount Proposed Change Order No. 6 Total Contract Amount $3,469,402.27 $44, 572.00 $3,514,154.27 Strategic Link: The construction of the roundabout at the intersection of North White Chapel Boulevard and Dove Road Continental Boulevard and the additional 8' sidewalk links to the city's strategy map relative to the focus areas of Mobility, Infrastructure, and Performance Management and Service Delivery. The specific corporate objectives that are met by this construction project include: Providing high quality customer service; Investing to provide and maintain high quality public assets; and Providing travel convenience within city and region. Citizen Input/ Board Review: None Legal Review: This is the Change Order form that has been previously reviewed by the City Attorney. Alternatives: The City Council may approve Change Order No. 6 or deny it. Supporting Documents: Location Map Change Order No. 6 Project Schedule: Construction of the intersection is now complete and will be followed immediately with landscaping and irrigation improvements. Staff Recommendation: Approve Change Order No. 6 with Quality Excavation for Dove Road Intersection and Drainage Improvements in the amount of $44,752.00 for sidewalks along North White Chapel Blvd. Staff Contact: Robert H. Price, P.E., Director of Public Works Gordon J. Mayer, Jr., P.E. Deputy Director of Public Works Cheryl Taylor, P.E. Civil Engineer • me • S Q a �y CHANGE ORDER No. 6 Dated: September 21, 2010 OWNER'S Project No. 07-030 Project: Dove Road Intersection and Drainage Improvements OWNER City ofSouthlake Contract for $2,983,435.26 Contract Date: April 22, 2009 To: Quali& Excavation, LTD. Contractor You are directed to make the changes noted below in the subject contract for the dollar amount stated below including all labor, equipment, materials, overhead, and profit: Nature of the changes: Unit 2 — Dove Road/White Chapel Blvd. Intersection Improvements Item #49 Add 900 — Concrete Sidewalk ($40.72/S.Y.) $36,648.00 Item #91 Add 8 — Earthen Flumes Under Walks for Drainage ($350.00/EA.) $2,800.00 Item #53 Add 1200 — Sod ($4.42/S.Y.) $5,304.00 Total: $44,752.00 These changes result in the following adjustment of contract price and contract time: Contract Price Prior to this Change Order $ 3, 469, 402.27 Net Increase Resulting from this Change Order $ 44, 752.00 Current Contract Price Including this Change Order $ 3,514,154.27 Page 1 of 2 The above changes are approved: City of Southlake City IC Title: Mayor Date: 2010 Contract Time Prior to this Change 470 calendar days (Days or Date) Net Increase Resulting from this Change Order 0 calendar days (Days) Current Contract Time Including this Change Order 470 calendar days (Days or Date) The above changes are recommended: Cib� of Southlake City By: Title: City Engineer Date: 12010 City of Southlake City IC Title: ProiectManager Date: .2010 City of Southlake city IC Title: Director Public Works Date: 2010 Quality Excavation, LTD. Contractor IC Date: 2010 Page 2 of 2