Item 6D Department of Planning & Development Services S T A F F R E P O R T May 28, 2008 ZA08-022 CASE NO: Site Plan for Gateway Church Phase I PROJECT: REQUEST: On behalf of Gateway Church, Kimley-Horn & Associates is requesting approval of a site plan for a 206,246 square foot church building and a 4,700 square foot physical plant on 81.82 acres. The first phase shall include a 4000-seat sanctuary, classrooms for adults around the sanctuary, and build-out of approximately one-half of the children’s building. The applicant requests approval of the buildings and landscaping as proposed. A variance to the Lighting Ordinance No. 693, as amended, is requested to allow metal halide (white) type lighting rather than the required high pressure sodium (brown) type lighting due to architectural coloring effects. The plan shows all other lighting characteristics to comply with the lighting ordinance. 1) Conduct public hearing ACTION NEEDED: 2) Consider site plan approval ATTACHMENTS: (A) Background Information (B) Vicinity Map (C) Plans and Support Information (D) Site Plan Review Summary No. 2 dated May 5, 2008 (E) Surrounding Property Owners Map (F) Surrounding Property Owners Responses for Commission and Council Members Only (G) Full Size Plans () STAFF CONTACT: Ken Baker (748-8067) Dennis Killough (748-8072) Case No. ZA08-022 BACKGROUND INFORMATION OWNERS: Gateway Church APPLICANT: Kimley-Horn & Associates PROPERTY SITUATION: The property is located along SH 114 between Carroll and Kimball Avenues LEGAL DESCRIPTION: A portion of Tracts 1, 1A1, 1E, 2, 2C1, Tracts 2B1A, 2B, R. Eades Survey, Abstract No. 481; a portion of Tract 3A, T. Mahan Survey, Abstract No. 1049. LAND USE CATEGORY: Mixed Use HISTORY: -“NR-PUD” Non-Residential Planned Unit Development District and a Concept Plan were approved June 17, 1997. -A zoning change to “NRPUD” with a Concept Plan and Preliminary Plat was approved in August 2007.The purpose of the zoning change was to revise the existing “NR-PUD” to allow religious institutions as a permitted use along with multi-level parking garages as a permitted accessory use. -A Final Plat was approved by P&Z May 5, 2008. CURRENT ZONING: NR-PUD Non-Residential Planned Unit Development District TRANSPORTATION ASSESSMENT: See the “Design Narrative” and “Traffic Impact Analysis - Executive Summary” in Attachment ‘C’ of this report. East State Highway 114 is a six lane, limited access highway with three lane frontage roads on either side. May, 2007 traffic counts on E. SH 114 frontage roads (between Kimball Rd. and N. Carroll Ave.) West Bound East Bound 24hr 1914 4512 A.M Peak 133416 () 11:15 – 12:15 () 11:15 – 12:15 P.M. Peak 206461 () 4:45 – 5:45 () 6:15 – 7:15 Traffic Impact: Church Use Day Sq. Ft. Vtpd* AM-IN AM-OUT PM-IN PM-OUT Weekday 206,246 1879 132 132 172 119 Peak Hour of Generator Peak-In Peak-Out Saturday 206,246 2001 5:00PM – 8:00PM 496 174 Sunday 206,246 7555 9:00AM – 1:00PM 998 959 th *Vehicle Trips Per Day based on ITE’s Trip Generation Manual, 6 Edition. **The AM/PM times represent the estimated number of vehicle trips generated during the peak travel times on SH 114 frontage road, Blessed Way, Kirkwood Blvd. and Grace Lane. Case No. Attachment A ZA08-022 Page 1 WATER & SEWER: See the “Design Narrative” in Attachment ‘C’ of this report. P&Z ACTION: May 22, 2008; Approved (6-0) subject to Site Plan Review Summary No. 2, dated May 5, 2008; requiring a four (4) lane roadway be built on Blessed Way from State Highway 114 to the proposed Kirkwood Blvd. extension; requiring a four (4) lane roadway be built on Grace Lane from State Highway 114 north to the northern boundary of the Peleton property, located directly to the west of this property; recognizing the applicant’s willingness to meet with the city Landscape Administrator to provide further detailed differences to the canopy tree numbers and cover if any from the original concept plan and to discuss evergreen or other screening to the physical plant building prior to presenting this item to the City Council. STAFF COMMENTS: Site Plan Review Summary No. 2 dated May 5, 2008 is attached. N:\Community Development\MEMO\2008cases\022 - SP - Gateway Church\Staff Report\08-022SP_CC 6-3.doc Case No. Attachment A ZA08-022 Page 2 Case No. Attachment B ZA08-022 Page 1 Link to PowerPoint Presentation Case No. Attachment C ZA08-022 Page 1 Case No. Attachment C ZA08-022 Page 2 Case No. Attachment C ZA08-022 Page 3 Case No. Attachment C ZA08-022 Page 4 Case No. Attachment C ZA08-022 Page 5 Case No. Attachment C ZA08-022 Page 6 Case No. Attachment C ZA08-022 Page 7 Case No. Attachment C ZA08-022 Page 8 Case No. Attachment C ZA08-022 Page 9 SITE PLAN REVIEW SUMMARY ZA08-022Two05/05/08 Case No.: Review No.: Date of Review: Site PlanGateway Church Project Name: – APPLICANT: Gateway Church ARCHITECT: Kimley-Horn & Associates Doug Sluiter Matt Moore 500 S. Nolen, Suite 300B 5750 Genesis Court, Suite 200 Southlake, TX 76092 Frisco, TX 75034 Phone: (817) 552-3757 Phone: (972) 335-3580 Fax: Fax: (972) 335-3779 CITY STAFF HAS REVIEWED THE ABOVE REFERENCED PROJECT RECEIVED BY THE CITY ON 05/05/08 AND WE OFFER THE FOLLOWING STIPULATIONS. THESE STIPULATIONS ARE HEREBY MADE CONDITIONS OF SITE PLAN APPROVAL UNLESS SPECIFICALLY AMENDED BY THE CITY COUNCIL. IF YOU HAVE ANY QUESTIONS OR NEED FURTHER CLARIFICATION, PLEASE CONTACT DENNIS KILLOUGH AT (817) 748-8069 OR RICHARD SCHELL AT (817) 748-8602. 1.The following comments pertain to the narrative describing the project, infrastructure to be installed, facilities to be provided etc.: a.The narrative states that only two of the four lanes of Grace Lane and Blessed Way are to be constructed, but the plan shows all four lanes. Please correct the discrepancy. If only two lanes are being built, provide justification by way of a traffic analysis and executive summary conclusion. b.Extend the medians on Grace Lane and Blessed Way to the first drives. Align the drives on Grace Lane. 2.Add the tract numbers to the legal description. Fire lanes on 3.Fire lane width must be designated with all curb radii adjacent to the fire lane labeled. each side of the building need to be labeled more clearly. Please use shading to match the fire lane along the front of the building. 4.All lighting must comply with the Lighting Ordinance No, 693, as amended. Metal halide type (Variance lighting is not permitted. Only high pressure sodium-type lighting is permitted. Requested) 5.Site Data Summary Chart (by phase and in total) to include the following items: a.Seating Capacity b.Required and provided loading spaces. Case No. Attachment D ZA08-022 Page 1 * A fully corrected plan that includes all associated support plans/documents and conditions of approval is required before any ordinance or zoning verification letter publication or before acceptance of any other associated plans for review. Plans and documents must be reviewed and stamped “approved” by the Planning Department. * The elevations are subject to City Council approval following a recommendation from the Planning and Zoning Commission. It is the applicant’s responsibility to demonstrate compliance. Staff recommends providing material samples as part of this demonstration. * All mechanical units must be screened of view in accordance with Ord. 480, Section 43.9c1(c). * Please note that the maximum height for monument signs is twelve (12) feet measured from the finished grade of the adjacent paved surface of the SH 114 frontage roads. Signs would not be permitted on top of the berms at the intersections of Grace Lane and Blessed Way with S.H. 114. * All development must comply with the City’s Drainage Ordinance No. 605 and detain all post development run-off. * All infrastructure must be installed and accepted or otherwise approved by the Director of Public Works and Fire Marshal prior to issuance a permit for building construction. * No review of proposed signs is intended with this site plan. A separate building permit is required prior to construction of any signs. 65 or 75 * It appears that this property lies within the LDN D/FW Regional Airport Overlay Zone and will require construction standards that meet requirements of the Airport Compatible Land Use Zoning Ordinance No. 479. * The applicant should be aware that prior to issuance of a building permit a Plat must be processed and filed in the County Plat Records, a fully corrected site plan, landscape plan, irrigation plan, and building plans, must be submitted for approval and all required fees must be paid. This may include but not be limited to the following fees: Park Fee, Perimeter Street Fee, Water & Sewer Impact and Tap Fees, and related Permit Fees. * A letter of permission from the adjacent property owner(s) on the west must be obtained prior to issuance of a building permit for the construction of the off-site pavement and a permit from TxDOT must be obtained prior to any curb cut along F.M. 1709. * Please be aware that any change of tenant/owners with a request for a new C.O. will require that all parking areas meet the "all weather surface" requirement in the zoning ordinance and all fire lanes shall be per the Fire Department's requirements. * Denotes Informational Comment Landscape Administrator Comments: Case No. Attachment D ZA08-022 Page 2 Keith Martin (817) 748-8229 TREE CONSERVATION COMMENTS: 1. The scale of the submitted Tree Conservation Plan is too small to make out the species and trunk diameters of the exiting trees. Please submit the Tree Conservation Plan at a legible scale. * The Tree Conservation Plan is generally consistent with the Concept Plan and Preliminary Plat Tree Conservation Plans. More trees are proposed to be preserved south of the parking lot area east of the lake due to elimination of a fire lane and cul-de-sac. However, a 13’ berm is proposed at the southeast corner of the property at Blessed Way and Highway 114 that would remove about the same amount of trees. Existing trees that were previously shown to be preserved along Blessed Way are now proposed to be removed in order to construct screening berms within the bufferyard and interior landscape area along Blessed Way. The proposed configuration of the #1 Pond adjacent to Highway 114 seems to have changed and proposed grading does not reach as far horizontally east to Highway 114 as previously proposed. Also only trees that are proposed to be removed with the proposed phase of the development or shown to be altered instead of across the entire development as shown on the Concept Plan Tree Conservation Plan. * Please be aware that all existing trees shown to be preserved on the City Council approved Tree Conservation Plan must be preserved and protected during all phases and construction of the development. Alteration or removal of any of the existing trees shown to be preserved on the approved Tree Conservation Plan is a violation of the Tree Preservation Ordinance and the zoning as approved by the Southlake City Council. Please ensure that the layout of all structures, easements, utilities, structures grading, and any other structure proposed to be constructed do not conflict with existing trees intended to be preserved. PARKING LOT LANDSCAPE ISLANDS: 1. Some of the parking lot landscape islands measure smaller than the required 12’ width. Planter islands shall have a minimum width of 12’ back-to-back if curbed or 13’ edge-to-edge if no curb is intended, and shall be equal to the length of the parking stall. LANDSCAPE PLAN: 1. The submitted Landscape Plan is not consistent with the Landscape Plan submitted with the Concept Plan. The bufferyard plantings along Blessed Way are generally consistent with the Concept Landscape Plan and some berms have been added. However, the original Concept Landscape Plan showed the full planting of materials in accordance with the \ Type J bufferyard adjacent to State Highway 114 in addition to the existing trees (no new plantings are proposed), showed two trees per parking lot island (only one per island is proposed) and showed planting of canopy trees, accent trees and shrubs within the access drives (no plantings are proposed). Please provide a Landscape Plan that is consistent with what was submitted and approved with the development Concept Plan. 2. Typical parking lot landscape island details are provided on the landscape plan but they are not consistent with total landscape design. Canopy trees are shown within most all of the parking lot Case No. Attachment D ZA08-022 Page 3 landscape islands but the typical island plantings show only shrubs and ornamental grasses, no trees are provided. * In the parking lot areas that are intended to be future structured parking it may be more beneficial to only install shrubs and ground cover during this phase of development and plant the proposed canopy trees and accent trees somewhere else on the property. This only if the parking lot areas are truly intended to be structured parking in the near future. * The different plant material symbols on the landscape plan cannot be distinguished. Please submit a color landscape plan that distinguishes the different types of plant material by color. This is a City Council request. LANDSCAPE SUMMARY CHARTS: 1. Please provide the Season Color plant material calculations to the Interior Landscape Summary Chart. 2. The plant material calculations within the Bufferyard Summary Chart are slightly off and the total length of the south bufferyard adjacent to Highway 114 is 2,206’ instead of 981’ as shown. Please correct the bufferyard calculations for each designated bufferyard. # Denotes required items * Denotes recommended items Case No. Attachment D ZA08-022 Page 4 Surrounding Property Owners Gateway Church SPO # Owner Zoning Land Use Acreage 1. Mixed Use, Retail Commercial, Public/Semi- Gateway Church NRPUD Public 16.87 2. Low Density Residential, Mixed Use, Gateway Church NRPUD Public/Semi-Public 89.61 3. Gateway Church NRPUD Public/Semi-Public 0.25 4. Texas, State Of NRPUD Public/Semi-Public 0.34 5. Greenway-Berk Partners, Lp AG Mixed Use, Mixed Use 0.10 6. Mixed Use, Mixed Use, Mixed Use, Gateway Church NRPUD Public/Semi-Public 5.28 7. Greenway-Berk Partners, Lp AG Mixed Use, Public/Semi-Public 3.48 8. Gateway Church NRPUD Mixed Use, Public/Semi-Public 1.77 9. Low Density Residential, Mixed Use, Carroll ISD AG Public/Semi-Public 26.49 10. Mixed Use, Mixed Use, Mixed Use, Gateway Church NRPUD Public/Semi-Public 48.97 11. Fechtel, Joe NRPUD Mixed Use, Public/Semi-Public 0.06 12. Fechtel, Joe NRPUD Mixed Use, Mixed Use 0.23 13. Greenway-Berk Partners, Lp AG Mixed Use 8.15 14. Fechtel, Joe NRPUD Mixed Use, Mixed Use 0.09 15. Greenway-Berk Partners, Lp AG Mixed Use, Mixed Use, Public/Semi-Public 1.46 Case No. Attachment E ZA08-022 Page 1 Surrounding Property Owner Responses Gateway Church Notices Sent: Fifteen (15) Responses Received: None (0) Case No. Attachment F ZA08-022 Page 1