Item 4FCity of Southlake, Texas
MEMORANDUM
February 19, 2008
To:
From:
Shana Yelverton, City Manager
Sharen Jackson, Director of Finance
Timothy Slifka, Fleet Coordinator
Subject: Authorize Purchase of Vehicles from Philpott Motors through the
Houston - Galveston Area Council of Governments in the amount of
for $573,898.12
Action
Requested: Authorize the purchase of vehicles from Philpott Motors for Public
Works, DPS Fire and Police, Parks, Planning and Building Services in the
amount of $573,898.12.
Background
Information: The City's Vehicle Replacement Plan outlines 11 vehicles for the above
departments that are scheduled for replacement. The FY 2007 -08 Budget
authorizes the purchase of these vehicles as well as the addition of two (2)
new vehicles. In November 2007, the City contacted Philpott Motors to
obtain the HGAC contract pricing.
Financial
Considerations: Vehicles and outfitting are funded through the Vehicle Replacement Plan.
Citizen Input/
Board Review: None
Legal
Review: None
Alternatives: Retain the retiring vehicles which will lead to increased repair costs and
limit the availability of fleet for staff use.
,Supporting
Documents: HGAC Contract Pricing Worksheet
Staff
Recommendation: Authorize the purchase of these 13 vehicles from Philpott Motors.
Staff
Contact: Sharen Jackson, Director of Finance
Timothy Slifka, Fleet Coordinator /Interim Purchasing Agent
CONTRACT PRICING WORKSHEET Contract HTI1 -07 Date 1/25/08
For Standard Equipment Purchases No.: Prepared:
This Form must be prepared by Contractor and given to End User. The H -GAC administrative fee shall be shown in Section
F. End User issues PO to Contractor, and MUST also fax a copy of PO, together with completer) Pricing Worksheet, to H-
GAC @ 713 993 - 4548. Please type or print legibly.
]B uying CITY OF SOUTHLAKE Contractor: PHILPOTT MOTORS
Agency:
Contact TIM SLIFKA Prepared RICHARD HYDER
Person: By:
Phone: (817) 748 -8312 Phone: (888) 973 -5338
Tax: Tax: (409) 724 -0934
Email: TS LIFKA CI.SOUTHLAKE.TX.US I Email: RIC HYDER(d7PHILPOTTMOTORS.COM
Product DA pescription: 2008 FORD F450
Code:
A. Product Item Base Unit Price Per Contractor's H -GAC Contract: $ 20,421.00
B. Published Options - Itemize below - Attach additional shect(s) if necessary - Include Option Code in description if applicable.
;(Note: Published Options are options which were submitted and priced in Contractor's bid.)
Description Cost Description Cost
FLOOR PLAN INTEREST $ 857.69 tN1'�4 k�'(?�KS VATE>c
LOT INSURANCE $ 122.53 KOM 1NGFRSOL RAND AIR COMPRESSOR 30 GAL $ 2,943.00
99R 6AL V8 DIESEL, $ . 4,240.00 52B ELECTRIC BRAKE CQNTROLLER $ 230.00
44B AUTO TRANSMISSrt�N $ I92 SIIW N 150 HQEREEL $ 473.00
572 AIR CONI ITIf1. INC
66S UPFITTER SITHES
31U SEITF THRQ[1I4 B}IJY .
$ 250.00
WINDOW TINT .,. �- _,
$ :. x ,.150 0
84
$ 175.00
E118 KNAPI -IETDE SERVICE BODY 11' **
$ 8,736.00
96LP6 WER EQUIPMENT GROUP
$ 530.00
320988 -002 AUTOCRANE 3203PRX -15
$ 9,553.00
LED LIGHTBARAMBLR/13LUE
$ 2,850.00
Subtotal From Additional Sheet(s):
$ -
2 WHFLEN 700 LIGHTS AMBER/RED MTD REAR
$ 350.00
Subtotal B:
$ 33,799.22
C. Unpublished Options - Itemize below / attach additional sheet(s) if necessary.
(Note: Unpublished options are items which were not submitted and priced in Contractor's bid.)
Description
Cost
Description
Cost
PDI CHARGE
$ 80.00
4 KEYS
$ 6.00
Subtotal From Additional Sheet(s):
$ 15,314.00
Subtotal C:
$ 15,400.00
Cheek: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit
Price plus Published Options (A +B).
For this transaction the percentage is:
28%
D. Other Cost Items Not Itemized Above (e.g. Installation, Freight, Delivery, Etc.)
Description
Cost
Description
Cost
DELIVERY 300 MILES
$ 450.00
ESP 6/100 BASE CARE $50 DED
$ 2,260.00
Subtotal D:
$ 2,710.00
E. Total Cost Before Any Applicable Trade -In / Other Allowances 1 Discounts (A +B +C +D)
$ 72,330.22
Quantity Ordered:
1
X Subtotal of A + B + C + D: $ 72,330.22
=
Subtotal E:
$ 72,330.22
F. H -GAC Fee Calculation (From Current Fee Tables)
Subtotal F:
$ 1,000.00
G. Trade -Ins 1 Other Allowances 1 Special Discounts
Description
Cost
Description
Cost
Subtotal G: $ -
Estimated Delivery Date:
150 DAYS ARO
H. Total Purchase Price (E +F +G): S 73,33022
W 01c,
PAGE 2-- ADDITIONAL OPTIONS
Contract i VE03 -06
No.:
Date 1/25/08
Prepared:
This Form must be prepared by Contractor and given to End User. The H -GAC administrative fee shall he shown in Section
F. End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GAC @ 713- 993 -45
Buying ECITY OF SOUTHLAK E
Agency:
Contractor PHILPOTT MOTORS
Contact :TIM SLIFKA
Person:
Prepared :RICHARD HYDER
By:
Phone: 58177488312
Phone: :8889735338
Fax: 50
Fax: :4097240934
Email: ETSLIFKA CI.SOUTHLAKE.TX.US
Email: RIC HARD.HYDER@PHILPOTTMOTORS.COM
Product DA
Code: ir
Description: :2008 FORD x+'450
B. Additional Published Options to be added to page I
Description Cost
Description Cost
Subtotal B: $
C. Additional Unpublished Options to be added to page 1
Description Cost
Description Cost
WESTIN TUBULAR CAB STEPS € $ 225.00
WIGWAGS $ 99.00
REAR FLASHERS $ 99.00
"SERVICE BODY UPGRADES: i S 7,991.00
RAISED FRONT COMPARTMENT
1 /8" TREADPLATE TOP COMPARTMENTS
HEADACHE RACK
JACK LEGS/BOOM REST
2 5/16" BALL /PINTLE COMBO
SIX WAY PLUG
SLIDE OUT DRAWERS (4) 3 ", (2) 5 ", (1) 7"
MASTER LOCK SYSTEM
LIGHTED COMPARTMENTS
MILLER 250 WELDER W/ LEADS $ 4,550.00
HONDA T20 -11 13HP PRESSURE WASHER $ 2,350.00
Subtotal C: € $ 15,314.00
CONTRACT PRICING WORKSHEET Contract VE03 -06 Date 12/28/07
For Standard Equipment Purchases No.: Prepared:
This Form must be prepared by Contractor and given to End User. The H -GAC administrative fee shall be shown in Section
F. End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GAC (a ) 713 --993 -4548. Please type or print legibly.
Bu CITY OF SOUTHLAKE Contractor: PHILPOTT MOTORS
Pers on:
TIM SLIFKA
Pr Bared Y�
RICHARD HYDER
Phone:
(817) 748 -8312
Phone:
(888) 973 -5338
Fax:
(817) 748 -8048
Fax:
(409) 724 -0934
Email:
TSLIFKA .0 I. SOUTH LAKE.TX.US
Email:
RICHARD. HYDERO)PHILPOTTMOTORS.COM
Product
Code:
D26
Description:
2008 FORD F250 REGULAR CAB
A. Product Item
Base Unit Price Per Contractor's H -GAC Contract:
$ 14,933.00
B. Published Options - Itemize below - Attach additional sheet(s) if necessary - Include Option Code in description if applicable.
(Note: Published Options are options which were submitted and priced in Contractor's bid.)
Description
Cost
Description
Cost
44T AUTOMATIC TRANSMISSION
$ 1,088.00
EXTERIOR - -WHITE
$ -
X3L LIMITED SLIP AXLE
$ 238.00
66S UPFITTER SWITCHES
$ 61.00
572 AIR CONDITIONING -,
$ �,62LOO
KNAPHEIDE 696LPJ
$ 4,775.00
54K POWER TOWING IVITRRORS:!•.
$ 169 00
UNff ?25 kUB IC WOl[tICS'�VA'PER
$ 5,723.00
99P DIESEL
4,110 �p
LED r TGHTBAR AM$ LUE :
$ 2,850.00
86T RECEIVER "HIhCTL.
$ .) 31 Qp
HEADACHE Rt0K
$' 335.00
FLOOR PLAN INTEREST
TINT WINf301� .
$ 125.00
LOT 1NSURANC
44 80�,..
56" CA
$ -
91T TOW COMMAND
$ 249,00
903 POWER EQUIPMENT GROUP
$ 410.00
Subtotal From Additional Sheet(s)
$ -
6 -WIRE ROUND TRAILER PLUG
$ -
Subtotal B:
1 $ 15,520.40
C. Unpublished Options - Itemize below / attach additional sheet(s) if necessary.
(Note: Unpublished options are items which were not submitted and priced in Contractor's bid.)
Description
Cost
Description
Cost
PDI CHARGE
$ 80.00
CLOTH SPLIT BENCH SEATING
$ 525.00
6AL DIESEL V8 2008 EMMISSIONS
$ 1,750.00
Subtotal From Additional Sheet(s):
$ 3,768.00
BED CREDIT
$ (400.00)
Subtotal C:
$ 5,723.00
Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit
Price plus Published Options (A +B).
For this transaction the percentage is:
19 °/u
I3. Other Cost Items Not Itemized Above (e.g. Installation, Freight, Delivery, Etc.)
Description
Cost
Description
Cost
DELIVERY 300 MILES
$ 450.00
Subtotal D:
$ 450.00
E. Total Cost Before Any Applicable Trade -In I Other Allowances I Discounts (A +B +C +D)
$ 36,626.40
Quantity Ordered:
1
X Subtotal of A + B + C + D:
1 $ 36,626.40
=
Subtotal E:
$ 36,626.40
F. H -GAC Fee Calculation (From Current Fee Tables)
Subtotal F:
G. Trade -Ins / Other Allowances 1 Special Discounts
Description
Cost
Description
Cost
Subtotal G. $ -
Estimated Delivery Date
120 DAYS ARO H. Total Purchase Price (E +F +G): S 36 ,626.40
PAGE 2-- ADDITIONAL OPTIONS
Contract V03 -06
E
No.:
Date
12/28/07
Prepared:
This Form must be prepared by Contractor and given to End User. The H -GAC administrative fee shall be shown in Section
F. End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GAC @ 773- 993 -45
B °Y1 °g :CITY OF SOUTHLAKE
Agency:
Contractor: :PHILPOTT MOTORS
Contact ;TIM SLIFKA
Person:
Prepared :RICHARD HYDER
By:
Phone: :8177488312
Phone: :8889735338
Fax: :8177488048
Fax: :4097240934
Email: @ TSLIFKA(aDCI. SOUTH LAKE.TX.US
Email: RICHARD. HYDER@PHILPOTTMOTORS.COM
Product A26
Code: IF
Description: ':2008 FORD F250 REGULAR CAB
B. Additional Published Options to be added to page I
Description Cost
Description Cost
Subtotal B: $
C. Additional Unpublished Options to be added to page 1
Description Cost
Description Cost
WIGWAGS $ 99.00
REAR FLASHERS $ 99.00
WHELEN 700 LED AMBER/RED ON REAR $ 361.00
4 KEYS $ 6.00
SERVICE BODY UPGRADE TO INCLUDE MASTED $ 2,853.00
LOCK, SLIDE OUT DRAWER SYSTEM, LED
LIGHTING ON SERVICE BODY, COMPARTMENT
LIGHTS
WESTIN TUBULAR CAB STEPS $ 225.00
63R HEAVY DUTY REAR SPRINGS $ 125.00
Subtotal C:: $ 3,768.00
Subtotal G: 1 $
Estimated Delivery Date: H. Total Purchase Price (E +F +G): 1 $ 89 ,445.88
CONTRACT PRICING WORKSHEET
For Standard Equipment Purchases
Contract
No.:
HTII -07
Date
Prepared:
1/21108
This Form must be prepared by Contractor and given to End User. The H -GAC administrative fee shall be shown in Section
F. End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GAC @ 713- 993 -4548. Please type or print legibly.
Buying
Agency:
CITY OF SOUTHLAKE
Contractor:
PHILPOTT MOTORS
Contact
Person:
TIM SLIFKA
Prepared
By:
RICHARD HYDFR
Phone:
(817) 748 -8312
Phone:
(888) 973 -5338
Fax:
Fax: 1 (
09) 724 -0934
Email:
TSLIFKAgQ1.SOUTHLAKE.TX.US
Email:
RICHARD.HYDER @PH ILPOTTMOTORS.COM
Product
Cade:
DB
Description:
2008 FORD F550 REGULAR CAB
A. Product Item Base Unit Price Per Contractor's H -GAC Contract: $ 22,122.00
B. Published Options - Itemize below - Attach additional shect(s) if necessary - Include Option Code in description if applicable.
(Note: Published Options arc options which were submitted and priced in Contractor's bid.)
Description
Cost
Description
Cost
FLOOR PLAN INTEREST
$ 929.14
T lI #76 PT3BT TC W10 CATER ,
LOT INSURANCE
$ 132.74
LED LIGHTBAR AMBER/BLUE
$ 2,850.00
99R 6.4L V8 DIESEL - ;-
$ ..4880
2 WHIELpN 7Q0 LIGHTS, 1NIBERIRED MTD REAR
$ 350.00
44B AUTO TRANSMISSION
$ , 1 2 Q0
1 118 7Ai'IIl IDE S1 RVjC1 BODY 11 " **
$ 8,736.00
572 AIR CONDITI01�'TIsIG :
$ 8$ 00
4811890 AUTOCRANE 6lpQ6IWPII N1 GO IT11f}I
$ 24,763.00
512/513 SPAR/ I IR 1�iNl� WI1 EL
$ X48 00,
O 11W N 1� ROSER.EEL
473.00
W1b5 165 WHELl B t 84'" CA '
$ 151 t10.,
K01vI I txERSCI RANTS AIR COMY...J.�SZ)It`30 GAL
$ 2,943.00
90L POWER EQURMENT GROUP =
$ ._ .,5.30 04_
67A DUAL ALTERNATORS
$ '265.00'
31U SHIP THROUGH BODY
$ 245.00
66S UPFITTER SWITCHES
$ -
Subtotal From Additional Sheet(s)
$ -
52B ELECTRIC BRAKE CONTROLLER
$ 230.00
Subtotal B:
$ 49,213.88
C. Unpublished Options - Itemize below / attach additional sheet(s) if necessary.
(Note: Unpublished options are items which were not submitted and priced in Contractor's bid.)
Description
Cost
Description
Cost
PDI CHARGE
$ 80.00
TAIL LIGHT FLASHERS
$ 99.00
4 KEYS
$ 6.00
Subtotal From Additional Sheet(s).
$ 15,116.00
WIGWAGS
$ 99.00
Subtotal C:
$ 15,400.00
Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit
Price plus Published Options (A +B).
For this transaction the percentage is:
22%
D. Other Cost Items Not Itemized Above (e.g. Installation, Freight, Delivery, Etc.)
Description
Cost
Description
Cost
DELIVERY 300 MILES
$ 450.00
ESP 6/100 BASE CARE $50 DED
$ 2,260.00
Subtotal D:
$ 2,710.00
E. Total Cost Before Any Applicable Trade -In / Other Allowances / Discounts (A +B +C +D)
$ 89,445.88
Quantity Ordered:
I
X Subtotal of A + B + C + D:
$ 89,445.88
=
Subtotal E:
$ 89,445.88
F. H -GAC Fee Calculation (From Current Fee Tables)
Subtotal F:
G. Trade -Ins / Other Allowances / Special Discounts
Description
Cost Description
Cost
Subtotal G: 1 $
Estimated Delivery Date: H. Total Purchase Price (E +F +G): 1 $ 89 ,445.88
PAGE 2-- ADDITIONAL OPTIONS
contract VE03 -06
No.:
Date 1/21/08
Prepared:
This Form must be prepared by Contractor and given to End User. The H -GAC administrative fee shall he shown in Section
F. End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GAC @ 713- 993 -45
Buying :CITY OF SOUTHLAKE
Agency:
Contractor: :PHILPOTT MOTORS
Contact :TIM SLIFKA
Person:
Prepared ?RICHARD HYDER
By:
Phone: 8177488312
Phone: :8889735338
Fax: `:0
Fax: :4097240934
Email: € TSLIFKA(a7C1.5011THLAKE.TX,L1S
Email: RICHARD .HYDER @PHILPOTTMOTORS.COM
Product DB j
Code:
Description: :2008 FORD F550 REGULAR CAB
B. Additional Published Options to be added to page 1
Description Cost
Description Cost
Subtotal B: $ -
C. Additional Unpublished Options to be added to page 1
Description Cost
Description Cost
"SERVICE BODY UPGRADES: $ 7,991.00
RAISED FRONT COMPARTMENT
1/8" TREADPLATE TOP COMPARTMENTS
HEADACHE RACK
JACK LEGS/BOOM REST
2 5/16" BALL/PINTLE COMBO
SIX WAY PLUG
SLIDE OUT DRAWERS (4) 3" (2) 5 ", (1) 7"
MASTER LOCK SYSTEM
LIGHTED COMPARTMENTS
MILLER 250 WELDER W/ LEADS $ 4,550.00
HONDA T20 -11 13HP PRESSURE WASHER $ 2,350.00
WESTIN TUBULAR CAB STEPS $ 225.00
Subtotal C:: $ 15,116.00
CONTRACT PRICING WORKSHEET Contract HT11 -07 Date 1125108
For Standard Equipment Purchases No.: Prepared:
This Form must be prepared by Contractor and given to End User. The H -GAC administrative fee shall he shown in Section
F. End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GAC @ 7I3 -993 -4548. Please type or print legibly.
Buying CITY OF SOUTHLAKE Contractor: PHILPO "1 °T MOTORS
Agency:
Contact TIM SLIFKA Prepared RICHARD HYDER
Person: By:
Phone: (817) 748 -8312 Phone: (888) 973 -5338
Fax: I Fax: � U!))
Email: TSLIFKA(a)CI.SOUTHLAKE.TX.US Emil: RICHARD. HYDERC
Product DA Description: 2008 FORD F450
Code:
A. Product Item Base Unit Price Per Contractor's H -GAC Contract: $ 20,421.00
B. Published Options - Itemize below - Attach additional sheet(s) if necessary - Include Option Code in description if applicable.
(Note: Published Options are options which were submitted and priced in Contractor's bid.)
Description Cost Description Cost
FLOOR PLAN INTEREST $ 857.69 W <tKS WATER
.......................... .
LOT INSURANCE $ 122.53 KOM INGERSOL RAND AIR COMPRESSOR 30 GAL $ 2,943.00
99R 6AL V8 DIESEL $ _4 (?0 52B ELECTRIC 13} AVE: CQNTROLLER $ 230.00
�44B AUTO TRANSMISSI'ON $ 1 X92 00 COX SUW N 1Sp`HOSE�ILEEL $ 473.00
572 AIR CONDITIONINGS
X47 4.0X,4 UPGR}
2,724.00
66S UPFITTER STTC) -iES
$
W46. UPGRADE
$ 2,943.00
WINDOW TINT:.:: :. ; . :.�
$ .., 7 .150-00 .
W165 ,$4', CA ,.. ,.. _
$ 175.00
E118 KNAPHEIDE SERVICE BODJ I F*
$ 8,736 .000
POWER EQUIPMENT GROUP '
$ 530.00
320988 -002 AUTOCRANE 3203PRX -15
$ 9,553.00
31U SHIP THROUGH BODY
$ 250.00
LED LIGHTBAR AMBER/BLUE
$ 2,850.00
Subtotal From Additional Sheet(s)
$ -
2 WHELEN 700 LIGHTS AMBER/RED MTD REAR
$ 350.00
Subtotal B:
$ 39,107.22
C. Unpublished Options - Itemize below / attach additional sheet(s) if necessary.
(Note: Unpublished options are items which were not submitted and priced in Contractor's bid.)
Description
Cost
Description
Cost
PDI CHARGE
$ 80.00
4 KEYS
$ 6.00
WIGWAGS
$ 99.00
Subtotal from Additional Sheet(s):
$ 17,466.00
REAR TAILLIGHT FLASHERS
$ 99.00
Subtotal C:
$ 17,750.00
Check: "Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit
Price plus Published Options (A +B).
For this transaction the percentage is.
30%
D. Other Cost Items Not Itemized Above (e.g. Installation, Freight, Delivery, Etc.)
Description
Cost
Description
Cost
DELIVERY 300 MILES
$ 450.00
ESP 61100 BASE CARE $50 DED
$ 2,970.00
Subtotal D:
$ 3,420.00
E. Total Cost Before Any Applicable Trade -In / Other Allowances 1 Discounts (A+B +C +D)
$ 80,698.22
Quantity Ordered:
1 1
1 X Subtotal of A + B + C + D:
1 $ 80,698.22
= Subtotal E:
$ 80,698.22
F. H - GAC Fee Calculation (From Current Fee Tables) Subtotal F:
$ -
G. Trade - Ins / Other Allowances I Special Discounts
Description
Cost Description
Cost
Subtotal G: $ -
Estimated Delivery Date:
150 DAYS ARO
H. Total Purchase Price (E +F +G): s so,69s.22
�--� PAGE 2 -- ADDITIONAL OPTIONS
Contract VE03 -06
No.:
Date 1125108
Prepared:
This Form must be prepared by Contractor and given to End User. The H -GAC administrative fee shall be shown in Section
E End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GAC @ 713- 993 -45
Buying :CITY OF SOIJTHLAKE
Agency:
Contractor: :PHILPOTT MOTORS
Contact :TIM SLIFKA
Person:
Prepared :RICHARD HYDER
By:
Phone: 8177488312
Phone: :8889735338
Fax: :0
Fax: :4097240934
E TSLI�CI.SOUTHLAKE.TX.US
Email: : RICHARD HYDEROPHILPOTTMOTORS.COM
Product DA
Code: JF
Description: :2008 FORD F450
B. Additional Published Options to be added to page 1
Description Cost
Description Cost
Subtotal B: $
C. Additional Unpublished Options to be added to page 1
Description Cost
Description Cost
WESTIN TUBULAR CAB STEPS $ 225.00
* *SERVICE BODY UPGRADES: € $ 7,991.00
RAISED FRONT COMPARTMENT
118° TREADPLATE TOP COMPARTMENTS
HEADACHE RACK
JACK LEGS/BOOM REST
2 5116" BALLIPINTLE COMBO
SIX WAY PLUG
SLIDE OUT DRAWERS (4) 3 ", (2) 5 ", (1) 7"
MASTER LOCK
LIGHTED COMPARTMENTS $ 2,350.00
MILLER 250 WELDER WI LEADS $ 4,550.00
HONDA T20 -11 13HP PRESSURE WASHER • $ 2,350.00
Subtotal C:: $ 17,466.00
CONTRACT PRICING WORKSHEET Contract VE03 -06 Date 1 1/29/07
For Standard Equipment Purchases No.: Prepared:
This Form must be prepared by Contractor and given to End User. The H -GAC administrative fee shall be shown in Section
F. End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H
GAC @ 713- 993 -4548. Please type or print legibly.
Buying CITY OF SOUTHLAKE Contractor: PHILPOTT MOTORS
Agency:
Contact TIM SLIFKA Prepared RICHARD HYDER
Person: By:
Phone: (817) 748 -8312 Phone: (888) 973 -5338
Fax: (817) 748 -8048 Fax: (409) 724 -0934
Email: TSLIFKA CI.SOUTHLAKE.TX.US ymail: RICHARD. HYDERODPHILPOTTMOTORS.COM
Product D25 Description: 2008 FORD F150 4X4
Code:
A. Product Item Base Unit Price Per Contractor's H -GAC Contract: $ 17,517.00
B. Published Options - Itemize below - Attach additional sheet(s) if necessary - Include Option Code in description if applicable.
(Note: Published Options are options which were submitted and priced in Contractor's bid.)
Description Cost Description Cost
AUTOMATIC TRANSMISSION $ - EXTERIOR - -YZ OXFORD WHITE $ -
AIR CONDITIONING $ - LED LIGHTBAR AMBER/BLUE $ 2,850.00
IAMFM $ �, 213 SHIFT C?I,T FLX� $ 338.00
99V 5ALV8 GAS H85 F1 EXFUE
$ $95,(10
UNCI 7
FLOOR PLAN 1:NTEST',.
$ 34140.84
l��IG WQIiKS WAIEIt
LOT INSURANCI
$ 44
b WIRE
-
145" W13 8' BED '.
1Il�T W1N130W
$ 125.00
POWER EQUIPMENT GROUP,
$ ,. ,,770,00..
CLOTH 40 /20 /40'SEATING
$ ._ ... . -.
535 TRAILER TOW PKG (INC REC HITCH)
$ 233.00
6 WAY SWITCHBOX
$ 119.00
Subtotal From Additional Sheet(s)
$ -
413 SKID PLATE PKG
$ 99.00
Subtotal B:
$ 5,588.82
C. Unpublished Options - Itemize below / attach additional sheet(s) if necessary.
(Note: Unpublished options are items which were not submitted and priced in Contractor's bid.)
Description
Cost
Description
Cost
PDI CHARGE
$ 80.00
4 KEYS
$ 100.00
WIGWAGS
$ 99.00
Subtotal From Additional Sheet(s):
$ (843.00)
TOW COMMAND PKG (54P& BRAKE CONTROL)
$ 351.00
Subtotal C:
$ (213.00)
Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit
Price plus Published Options (A +B).
For this transaction the percentage is:
-1%
D. Other Cost Items Not Itemized Above (e.g. Installation, Freight, Delivery, Etc.)
Description
Cost
Description
Cost
DELIVERY 300
$ 450.00
ESP 61100 PREMIUM $50 DED
$ 1,535.00
Subtotal D:
$ 1,985.00
E. Total Cost Before Any Applicable Trade -In 1 Other Allowances 1 Discounts (A +B +C +D)
$ 24,877.82
Quantity Ordered:
I 1
I X Subtotal of A + B + C + D:
$ 24,877.82
—
Subtotal E:
$ 24,877.82
F. H -GAC Fee Calculation (From Current Fee Tables)
Subtotal F:
G. Trade -Ins 1 Other Allowances 1 Special Discounts
Description
Cost Description Cost
I Subtotal G:
$ -
Estimated Delivery Date
90 DAYS H. Total Purchase Price (E +F +G):
$ 24,s77.s2
PAGE 2 -- ADDITIONAL OPTIONS
Contract VE03 -06
No.:
Date 11/29/07
Prepared:
This Form must be prepared by Contractor and given to End User. The H GAC administrative fee shall be shown in Section
F. End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GAC @ 713- 993 -45
Baying :CITY OF SOUTIILAKE
Agency:
Contractor: PHILPOTT MOTORS
Contact .TIM SLIFKA
Person:
Prepared .RICHARD HYDER
By:
Phone: :8177488312
Phone: :8889735338
Fax: :8177488048
Fax: :4097240934
Email: TSLIFKA CI.SOIJTHLAKE.TX.US
E mail: : RICHARD .HYDEKa)PHILPOTTMOTORS.COM
Product D25
Code: IF
Description: ?2008 FORD F150 4X4
B. Additional Published Options to be added to page X
Description Cost
Description Cost
Subtotal B- $
C. Additional Unpublished Options to be added to page 1
Description Cost
Description Cast
08F12VQI45 CREDIT $ (1,167.00)
WESTIN TUBULAR CAB STEPS BLACK $ 225.00
REAR FLASHERS $ 99.00
Subtotal C. $ (843.00
CONTRACT PRICING WORKSHEET Contract VE03 -06 Date 11/29/07
For Standard Equipment Purchases No.: Prepared:
This Form must he prepared by Contractor and given to End User. The H -GAC administrative fee shall he shown in Section
F. End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GAC@ 713- 993 -4548. Please type or print legihly.
Buying CITY OF SOUTHLAKE Contractor: PHILPOTT MOTORS
Agency:
Contact TIM SLIFKA Prepared RICHARD HYDER
Person: By:
Phone: (817) 748 -8312 Phone: (888) 973 -5338
Fax: (817) 748 -8048 Fax: (409) 724 -0934
Email: TSLIFKA(aCI.SOUTHLAKE.TX.US Email: RICHARD .HYDERPPHILPOTTMOTORS.COM
Product D28 Description: 2008 FORD F250 SUPERCAB
Code:
A. Product Item Base Unit Price Per Contractor's H -GAC Contract: $ 16,909.00
B. Published Options - Itemize below - Attach additional sheet(s) if necessary - Include Option Code in description if applicable.
(Note: Published Options are options which were submitted and priced in Contractor's bid.)
Description Cost Description Cost
44T AUTOMATIC TRANSMISSION $ 1,111.00 EXTERIOR - -YZ OXFORD WHITE €
X31, LIMITED SLIP AXLE ': $ 239.00 66S UPFITTER SWITCHES i $ 67.00
572 AIR CONDITIONING, $ :; 642, : 00 LEA L) HTBAIL. AMB_YRBLUE $ 2,854.00
54K POWER TOWING15RR( 5. ... $.
99P DIESEL ENIr)k'.?E ,.... 3 `991 40
FLOOR PLAN INTEREST $ 355It9 ,IIsII
TV` 8t14
LOT INSURANCE, .- :- $ 50,73,
RI .........
158" WB 8' BED
91T TOW COMMAND PKG $ 351.00
6 -WIRE ROUND TRAILER PLUG $ -
Subtotal From Additional Sheet(s)
$ -
903 POWER EQUIPMENT GROUP $ 421.00
Subtotal B:
$ 10,366.82
C. Unpublished Options - Itemize below 1 attach additional sheet(s) if necessary.
(Note: Unpublished options are items which were not submitted and priced in Contractor's bid.)
Description
Cost
Description
Cost
PDI CHARGE
$ 80.00
CLOTH SPLIT BENCH SEATING
$ 525.00
4X4 UPGRADE
$ 3,015.00
Subtotal From Additional Sheet(s):
$ 426.00
6.41, V8 DIESEL UPGRADE 2008 EMISSIONS
$ 1,750.00
Subtotal C.
$ 5,796.00
Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit
Price plus Published Options (A +B).
For this transaction the percentage is:
21%
D. Other Cost Items Not Itemized Above (e.g. Installation, Freight, Delivery, Etc.)
Description
Cost
Description
Cost
DELIVERY 300 MILES
$ 450.00
ESP 61100 PREMIUM $54 DED
$ 2,755.04
Subtotal D:
$ 3,205.00
E. Total Cost Before Any Applicable Trade -In I Other Allowances 1 Discounts (A +B +C +D)
$ 36,276.82
Quantity Ordered: I 1
I X Subtotal of A + B + C + D:
I S 36,276.82
—
Subtotal E:
$ 36,276.82
F. H -GAC Fee Calculation (From Current Fee Tables)
Subtotal F:
G. Trade -Ins 1 Other Allowances 1 Special Discounts
Description
Cost
Description
Cost
Subtotal G: $ -
Estimated Delivery Date:
120 DAYS ARO
H. Total Purchase Price (E +F +G): $ 36,276.82
-- PAGE 2-- ADDITIONAL OPTIONS
Contract VE03 -06
No.:
Date 11/29/07
Prepared.,
This Form must be prepared by Contractor and given to End User. The H -GAC administrative fee shall be shown in Section
F. End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GAC @ 713- 993 -45
Buying :CITY OF SOL)THLAKE
Agency:
Contractor: IPIIILPOTT MOTORS
Contact :TIM SLIFKA
Person:
Prepared :RICHARD HYDER
By:
Phone: 8177488312
Phone: :8889735338
Fax: 8177488048
Fax: :4097240934
Email: €TSLIFKA CI.S0UTHIAKE.TX.US
Email: RICHARD AYDER(dPHILPOTTMOTORS.COM
Product 028 Description: :2008 FORD F250 SUPERCAB
Code:
B. Additional Published Options to be added to page 1
Description Cost
Description Cost
Subtotal B: $
C. Additional Unpublished Options to be added to page 1
Description Cost
Description Cost
WIGWAGS $ 99.00
4 KEYS € $ 3.00
REAR FLASHERS $ 99.00
WESTIN TUBULAR CAB STEPS S 225.00
Subtotal C:: $ 426.00
CONTRACT PRICING WORKSHEET Contract VE03 -46 Date 1/25/08
For Standard Equipment Purchases No.: Prepared:
This Form must be prepared by Contractor and given to End User. The H -GAC administrative fee shall be shown in Section
F. End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GAC @ 713 -993 -4548. Please type or print legibly.
Bay ing :CITY OF SOUTHLAKE Contractor: ;PHILPOTT MOTORS
Agency:
Contact :TIM SLIFKA Prepared :RICHARD HYDER
Person: By:
Phone: ;(817) 748-8312 Phone: ;(888) 973 -5338
;E, x: :(817) 748 8048 Fax: :(409) 724 -0934
;i: € TSLIFKA _CI.S0QTHLAKE.TX QS Email: ': RICH .HYDER(cbPHILPOTTMOTORS.COM
Product D34 Description: :2008 FORD E350 CUTAWAY (BOX)
Code:
A. Product Item Base Unit Price Per Contractor's H -GAC Contract: $ 20,581.00
B. Published Options - Itemize below - Attach additional sheet(s) if necessary - Include Option Code in description if applicable.
(Note: Published Options are options which were submitted and priced in Contractor's bid.)
Description Cost Description Cost
FLOOR PLAN INTEREST € $ 648.32
LOT INSURANCE $ 92.62 : � : CAIVIERA FRIYCI z
99P 6.01, DIESEL ENGIN
54E POWER MIRRORS `IRAILER T01Y
Subtotal From Additional Sheet(s) $ -
Subtotal B:: $ 11,158.94
C. Unpublished Options - Itemize below I attach additional sheet(s) if necessary.
(Note: Unpublished options are items which were not submitted and priced in Contractor's bid.)
Description Cost
Description Cost
PDI CI IARGE $ 80.00
63E HD ALTERNATOR 140 AMP $ 75.00
903 POWER LOCKS /WINDOWS $ 465.00
Subtotal From Additional Sheet(s): $ 3,754.00
552 INSULATION PKG : $ 85.00
Subtotal C:: $ 4,459.00
Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit':
Price plus Published Options (A +B ), For this transaction the percentage is: 14%
D. Other Cost Items Not Itemized Above (e.g. Installation, Freight, Delivery, Etc.)
Description Cost
Description Cost
DELIVERY 300 MILES •. $ 450.00
EQUIPMENT SERVICES $ 350.00
ESP 61100 BASE $50 DED $ 1,780.00
Subtotal D. € $ 2,580.00
E. Total Cost Before Any Applicable Trade -In 1 Other Allowances 1 Discounts (A +B +C +D) $ 38,778.94
Quantity Ordered:
L� K Subtotal of A + B + C + D:
$ 3$,77$.94
—
Subtotal E: $ 38,778.94
F. H -GAC Fee Calculation (From Current Fee Tables) Subtotal F :: $ -
G. Trade -Ins 1 Other Allowances / Special Discounts
Description Cost
Description Cost
Subtotal G: $ -
Estimated Delivery Date: DAYS ARO
H. Total Purchase Price (E +F +G):
$ 38,778.94
PAGE 2-- ADDITIONAL OPTIONS
Contract VE03 -06
No.:
Date 1125108
Prepared:
This Form must he prepared by Contractor and given to End User. The H -GAC administrative fee shall be shown in Section
F. End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GAC @ 713- 993 -45
Buying ;CITY OF SOUTHLAKE
Agency:
Contractor: :PHILPOTT MOTORS
Contact :TIM SLIFKA
Person:
Prepared :RICHARD HYDER
By:
Phone: :8177488312
Phone: :8889735338
Fax: ;8177488048
Fax: :4097240934
Email: TSLIFKA CI. SOUTH LAKE.TX.US
Email: : RICHARD .HYDER @PHILPOTTMOTORS.COM
Product D34
Code:
Description: :2008 FORD E350 CUTAWAY
B. Additional Published Options to be added to page 1
Description Cost
Description Cost
Subtotal B:
I $
C. Additional Unpublished Options to be added to page I
Description Cost
Description Cost
2008 DIESEL EMISSIONS $ 1,750.00
SRW 138" WB 99004GVWR € $ (378.00)
CLOTH SEATING $ 40.00
SPARE TIRE AND WHEEL $ 270.00
ADJ TO SUPREME SPARTAN CARGO 10' $ (371.00)
PER ATTACHED SPECIFICATIONS
XE6 4.10 LMITED SLIP AXLE $ 270.00
TOP HAT ROOF WI FULL HEIGHT SLIDING CAB $ 540.00
ACCESS DOOR
4 WHELEN LEDS 5VBA2ZCR X4 $ 520.00
3 ARROWSTICK WHELEN TAL85AA $ 595.00
WHELEN 400 GRILL LED BLUE $ 150.00
WHELEN 400 GRILL LED AMBER $ 150.00
WIGWAGS : $ 99.00
6 WAY SWITCBOX : $ 119.00
Subtotal C:: $ 3,754.00
CONTRACT PRICING WORKSHEET Contract VE03 -06 Date 11/26/07
For Standard Equipment Purchases No.: Prepared:
This Form must be prepared by Contractor and given to End User. The H -GAC administrative fee shall be shown in Section
F. End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GAC @ 713- 993 -4548. Please type or print legibly.
Buying CITY OF SOUTHLAKE Contractor: PHILPOTT MOTORS
Agency:
Contact TIM SLIFKA Prepared RICHARD HYDER
Person: By:
Phone: (817) 748 -8312 Phone: (888) 973 -5338
Fax: (817) 748 -8048 Pax: (409) 724 -0934
Email: TSLIFKAQQ1. SOUTH LAKE.TX.US rmau: I RICHARD. HYDER(c)PHILPOTTMOTORS.COM
Product D29 Description: 2008 FORD F250 CREW CAB
Code:
A. Product Item Base Unit Price Per Contractor's H -GAC Contract: $ 18,031.00
B. Published Options - Itemize below - Attach additional sheet(s) if necessary - Include Option Code in description if applicable.
(Note: Published Options are options which were submitted and priced in Contractor's bid.)
Description Cost Description Cost
44T AUTOMATIC TRANSMISSION $ 1,091.00 EXTERIOR - -YZ OXFORD WHITE $ -
X31, LIMITED SLIP AXLE € $ 210.04 LED LIGHTBAR AMB RIBLUE € $ 2,850.00
572 AIR CONDITIONING $ 613-„00 TUB ULAR,CB STEPS .. $ 335.04
665 UPFITTER SWITCH
.. $.....:.67,00 _.
99P DIESEL ENQIN „
FLOOR PLAN INTEREST ' $ .... ,S 66
11►IT 216
LOT INSURANCE- „�.. . ; ,.: $ . 54,10
.. _- ........:
172" WB 8' BED $
91T TOW COMMAND PKG $ 351.00
6-WIRE ROUND TRAILER PLUG $
Subtotal From Additional Sheet(s)
$ -
903 POWER EQUIPMENT GROUP $ 421.00
Subtotal B:
$ 10,498.76
C. Unpublished Options - Itemize below I attach additional sheet(s) if necessary.
(Note: Unpublished options are items which were not submitted and priced in Contractor's bid.)
Description
Cost
Description
Cost
PDI CHARGE
$ 80.00
85G TAILGATE STEP
$ 375.00
6.4L V8 DIESEL UPGRADE 2008 EMISSIONS
$ 1,750.00
Subtotal From Additional Sheet(s):
$ -
PANASONIC COMPUTER DOCK AND STAND
$ 895.00
Subtotal C:
$ 3,100.00
Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit For this transaction the percentage is:
Price plus Published Options (A +B).
11%
D. Other Cost Items Not Itemized Above (e.g. Installation, Freight, Delivery, Etc.)
Description
Cost
Description
Cost
DELIVERY 300 MILES
$ 450.00
ADD CUSTOMER MOTOROLA RADIO
$ 50.00
ESP 61100 PREMIUM $50 DED
$ 1,985.00
Subtotal D:
$ 2,485.00
E. Total Cost Before Any Applicable Trade -In I Other Allowances 1 Discounts (A +B +C +D)
$ 34,114.76
Quantity Ordered:
1
X Subtotal of A + B + C + D:
$ 34,114.76
=
Subtotal E:
$ 34,114.76
F. H -GAC Fee Calculation (From Current Fee Tables)
Subtotal F:
G. Trade -Ins 1 Other Allowances I Special Discounts
Description
Cost
Description
Cost
Subtotal C: $ -
Estimated Delivery Date
120 DAYS ARO
H. Total Purchase Price (E +F +G): $ 34 ,114.76
CONTRACT PRICING WORKSHEET Contract HTII -07 Date 1/21/08
For Standard Equipment Purchases No.: Prepared:
This Form must be prepared by Contractor and given to End User. The H -GAC administrative fee shall be shown in Section
F. End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GAC @ 713- 993 -4548. Please type or print legibly.
Buying CITY OF SOUTHLAKE Contractor: PHILPOTT MOTORS
Agency:
Contact TIM SLIFKA Prepared RICHARD HYDER
Person: By:
Phone: (817) 748 -8312 Phone: (888) 973 -5338
Fax: Fax: (409) 724 -0934
Email: TSLIFKA(d)CI.SDUTHLAKE.TX.US F,mna: RICHARD. HYDERQPHILPOTTMOTORS.COM
Product DA Description: 2008 FORD F450
Code:
A. Product Item Base Unit Price Per Contractor's H -GAC Contract: $ 20,421.00
B. Published Options - Itemize below - Attach additional sheet(s) if necessary - Include Option Code in description if applicable.
(Note: Published Options are options which were submitted and priced in Contractor's bid.)
Description Cost Description Cost
FLOOR PLAN INTEREST $ 857.69 31U SHIP THROUGH BODY $ 250.00
LOT INSURANCE $ 122,53 EXTERIOR - -TBD $ -
99R 6AL V8 DIESEL $ .4 GRAY C i OTH $
4- 240,OD INTERL,
44B AUTO TRANSMISQN $ 192 00 b6Pk11 SITCFIES $
572 AIR
86R BUMPER W /;�:)�C 1VR9
_.
Description
Cost
:. ....
Cost
PDI CHARGE
121.00
F47 4X4 UPGRADE . ,
$ 6.00
90L POWER EQUIPMENT GROUP
2; X24 {10 ,
W' Ml [ AT BAD I3OI'
$
2,618.00
X4L 4.30 LIMITED SLIP „AXLE
S
_,252.
Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit
Price plus Published Options (A+B).
For this transaction the percentage is:
24%
512/513 SPARE TIRE AND WHEET
Description
$
359.04
Cost
DELIVERY 250 MILES
$ 420.00
16000# GVWR
$
-
Subtotal D:
$ 3,390.00
213 ELECTRONIC SHIFT ON THE FLY
$ 52,890.66
$
185.00
X Subtotal of A + B + C + D:
Subtotal From Additional Sheet(s):
$
5,389.44
413 SKID PLATE PKG
F. H -GAC Fee Calculation (From Current Fee Tables)
$
98.00
G. Trade -Ins / Other Allowances / Special Discounts
1 Subtotal B:
$
19,431.66
C. Unpublished Options - Itemize below / attach additional sheet(s) if necessary.
(Note: Unpublished options are items which were not submitted and priced in Contractor's bid.)
Description
Cost
Description
Cost
PDI CHARGE
$ 80.00
3 KEYS
$ 6.00
90L POWER EQUIPMENT GROUP
$ 530.00
Subtotal From Additional Sheet(s):
$ 6,562.00
EXTENDED CAB UPGRADE W/ 60” CA
$ 2,470.00
Subtotal C.
$ 9,648.00
Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit
Price plus Published Options (A+B).
For this transaction the percentage is:
24%
D. Other Cost Items Not Itemized Above (e.g. Installation, Freight, Delivery, Etc.)
Description
Cost
Description
Cost
DELIVERY 250 MILES
$ 420.00
ESP 6/100 BASE $50 DED
$ 2,970.00
Subtotal D:
$ 3,390.00
E. Total Cost Before Any Applicable Trade -In 1 Other Allowances / Discounts (A +B +C +D)
$ 52,890.66
Quantity Ordered:
I
X Subtotal of A + B + C + D:
$ 52,890.66
=
Subtotal E:
$ 52,890.66
F. H -GAC Fee Calculation (From Current Fee Tables)
Subtotal F:
$ -
G. Trade -Ins / Other Allowances / Special Discounts
Description
Cost
Description Cost
Subtotal G: $ -
Estimated Delivery Date:
150 DAYS ARO
H. Total Purchase Price (E +F +G): $ 52 ,890.66
4-M PAGE 2 -- ADDITIONAL OPTIONS
Contract VE03 -06
No.:
Date 1121108
Prepared:
This Form must be prepared by Contractor and given to End User. The H GAC administrative fee shall be shown in Section
F. End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GAC @ 713- 993 -45
Buying :CITY OF SOUTHLAKE
Agency:
Contractor: :PHILPOTT MOTORS
Contact ;TIM SLIFKA
Person:
Prepared :RICHARD HYDER
BY
Phone: 8177488312
Phone: :8889735338
Pax: :0
Fax: :4097240934
Email: : TSLIFKA(c CI.SOUTHLAKE.TX.US
Email: RICHARD. HYDER(DPHILPOTTMOTORS.COM
Product DA
Code:
Description: :2008 FORD F450
B. Additional Published Options to be added to page I
Description Cost
Description Cost
RCCS3 LIGHTING AND EQUIPMENT PKG C ** € $ 5,389.44
Subtotal B: 11 $ 5,389.44
C. Additional Unpublished Options to be added to page I
Description Cost
Description Cost
CLOTH SPLIT BENCH SEATING 's $ 715.00
EQUIPMENT SERVICES $ 850.00
* *UPGRADE LIGHTING AND EQUIP TO OUST SPIN $ 4,997.00
WHELEN FREEDOM 55" LIGHTBAR W/ OPTICOM
HANDS FREE SIREN AND SPEAKER
(4) 700 SERIES RED /CLEAR LED
(2) TIR3 RED LED
(2) 700 SERIES RED /AMBER LED
WIGWAGS
ULTRASOUND INTERCOM
SE-8 SIGTRONIC HEADSET
RANCH HAND REPLACEMENT BUMPER
WARN WINCH
WESTIN NERF BARS
HELLA LAMP KIT
STREAMLIGHT FIREBOX W/ MOUNT
Subtotal C:: $ 6,562.00
CONTRACT PRICING WORKSHEET Contract VE03 -06 Date 11/29/07
For Standard Equipment Purchases No.: Prepared:
This Form must be prepared by Contractor and given to End User. The H -GAC administrative fee shall he shown in Section
F. End User issues PO to Contractor, andMUST also fax a copy of PO, together with completed Pricing Worksheet, to H
GAC @ 713 -993 -4548. Please type or print legibly.
CITY OF SOUTHLAKE Contractor: PHILPOTT MOTORS
Agency:
Contact TIM SLIFKA Prepared RICHARD HYDER
Person: $y:
Phone: (817) 748 -8312 Phone: (888) 973 -5338
Fax: (817) 748 -8048 Fax: (409) 724 -0934
Email: TSLIFKA(cDCI. SOUTH LAKE.TX.US Email: RICHARD. HYDERaPHILPOTTMOTORS.COM
Product D25 Description: 12008 FORD F150 SUPERCAB 4X4
Code:
A. Product Item Base Unit Price Per Contractor's H -GAC Contract: $ 17,517.00
B. Published Options - Itemize below - Attach additional sheet(s) if necessary - Include Option Code in description if applicable.
(Note: Published Options are options which were submitted and priced in Contractor's bid.)
Description Cost Description Cost
AUTOMATIC TRANSMISSION
$ -
EXTERIOR - -YZ OXFORD WHITE
$ -
AIR CONDITIONING
$ -
LED LIGHTBAR AMBER/BLUE
$ 2,850.00
AM1+M
$ 5,611.82
.IOTTO..DESI4.CENTEA,CQN,SOLE
$ 295.00
6 WAY SWITCHBOX
$ 119.00
Subtotal From Additional Sheet(s)
$ -
413 SKID PLATE PKG
$ 99.00
Subtotal B: 1
$ 5,611.82
C. Unpublished Options - Itemize below / attach additional sheet(s) if necessary.
(Note: Unpublished options are items which were not submitted and priced in Contractor's bid.)
Description
Cost
Description
Cost
PDI CHARGE
$ 80.00
4 KEYS
$ 100.00
WIGWAGS
$ 99.00
Subtotal From Additional Sheet(s):
$ 324.00
TOW COMMAND PKG (54P& BRAKE CONTROL)
$ 351.00
Subtotal C:
$ 954.00
Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit
For this transaction the percentage is:
Price plus Published Options (A +B).
4%
D. Other Cost Items Not Itemized Above (e.g. Installation, Freight, Delivery, Etc.)
Description
Cost
Description
Cost
DELIVERY 300
$ 450.00
ESP 6/100 PREMIUM $50 DED
$ 1,535.00
Subtotal D:
$ 1,985.00
E. Total Cost Before Any Applicable Trade -In 1 Other Allowances I Discounts (A +B +C +D)
$ 26,067.82
Quantity Ordered:
2
X Subtotal of A + B + C + D:
$ 26,067.82
=
Subtotal E:
$ 52,135.64
F. H -GAC Fee Calculation (From Current Fee Tables)
Subtotal F:
G. Trade -Ins / Other Allowances 1 Special Discounts
Description
I Cost Description
Cost
Subtotal G: 1 $ -
Estimated Delivery Date: 90 DAYS H. Total Purchase Price (E +F +G): $ 52,135.64
PAGE 2-- ADDITIONAL OPTIONS
Contract VE03 -06
No.:
Date 11/29/07
Prepared:
This Form must be prepared by Contractor and given to End User. The H -GAC administrative fee shall be shown in Section
F. End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H
GAC @ 7I3- 993 -45
$ °g :CITY OF SOUTHLAKE
Agency:
Contractor: THILPOTT MOTORS
Contact :TIM SLIFKA
Person:
Prepared :RICHARD HYDER
By:
Phone: 8177488312
Phone: :8889735338
Fax: :8177488048
Fax: 4097240934
Email: : TSLIFKA(7.CE.SOUTHLAKE.TX.US
]Cmail: : RICHARD. HYDER c@PHILPOTTMOTORS.._COM
Product D25 Description: :2008 FORD F150 SUPERCAB 4X4
Code:
B. Additional Published Options to be added to page 1
Description Cost
Description Cost
Subtotal B: $ -
C. Additional Unpublished Options to be added to page 1
Description Cast
Description Cost
REAR FLASHERS i $ 99.00
WESTIN TUBULAR CAB STEPS BLACK $ 225.00
Subtotal C: $ 324.00
CONTRACT PRICING WORKSHEET Contract Date
VE03 -06 11/29/07
_HM For Standard Equipment Purchases No.: Prepared:
This Form must be prepared by Contractor and given to End User. The H -GAC administrative fee shall be shown in Section
F. End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GAC @ 713- 993 -4548. Please type or print legibly.
Buying CITY OF SOUTHLAKE Contractor: PHILPOTT MOTORS
Agency:
Contact TIM SLIFKA Prepared RICHARD HYDER
Person: By:
Phone: (817) 748 -8312 Phone: (888) 973 -5338
Fax: (817) 748 -8048 Fax: (409) 724 -0934
Email: TSLIFKAQQI. SOUTH LAKE.TX.US 11 Email: RICHARD. HYDER PHI LPOTTMOTORS.COM
Product D29 Description: 2008 FORD F250 CREW CAB
Code:
A. Product Item Base Unit Price Per Contractor's H -GAC Contract: $ 18,031.00
B. Published Options - Itemize below - Attach additional sheet(s) if necessary - Include Option Code in description if applicable.
(Note: Published Options are options which were submitted and priced in Contractor's bid.)
Description Cost Description Cost
44T AUTOMATIC TRANSMISSION $ 1,091.00 EXTERIOR - -YZ OXFORD WHITE $ -
X31, LIMITED SLIP AXLE $ 210.00 LED LIGHTBAR AMBER/BLUE $ 2,850.00
572 AIR CONDITIONINQ., $ fit Q.00 TINT WINDOWS $ 125.00
66S UPFITTER SWI'fCI,MS
0
DIESEL E
FOR PLAN
LOT INSURANCE
172" WB 8' BED
91T TOW COMMAND PKG $ 351.00
6 -WIRE ROUND TRAILER PLUG :$ -
Subtotal From Additional Sheet(s)
$
903 POWER EQUIPMENT GROUP $ 421.00
Subtotal B.
$ 10,288.76
C. Unpublished Options - Itemize below / attach additional sheet(s) if necessary.
(Note: Unpublished options are items which were not submitted and priced in Contractor's bid.)
Description
Cost
Description
Cost
PDl CHARGE
$ 80.00
4 KEYS
$ 3.00
6AL V8 DIESEL UPGRADE 2008 EMISSIONS
$ 1,750.00
Subtotal From Additional Sheet(s):
$ 423.00
CLOTH SPLIT BENCH SEATING
$ 700.00
Subtotal C:
$ 2,956.00
Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit
Price plus Published Options (A +B).
For this transaction the percentage is:
10%
D. Other Cost Items Not Itemized Above (e.g. Installation, Freight, Delivery; Etc.)
Description
Cost
Description
Cost
DELIVERY 300 MILES
$ 450.00
ESP 61100 PREMIUM $50 DED
$ 1,985.00
Subtotal D:
$ 2,435.00
E. Total Cost Before Any Applicable Trade -In I Other Allowances I Discounts (A +B +C +D)
$ 33,710.76
Quantity Ordered:
I 1
X Subtotal of A + B + C + D:
$ 33,710.76
=
Subtotal E:
$ 33,710.76
F. H -GAC Fee Calculation (From Current Fee Tables)
Subtotal F:
G. Trade -Ins 1 Other Allowances 1 Special Discounts
Description
Cost
Description
Cost
Subtotal G: $ -
Estimated Delivery Date:
120 DAYS ARO
H. Total Purchase Price (E +F +G): S 33,710.76
4-M PAGE 2 -- ADDITIONAL OPTIONS
Contract V E03 -06
No.:
Date 11/29/07
Prepared::
This Form must be prepared by Contractor and given to End User. The H -GA C administrative fee shall be shown in Section
F. End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GAC @ 713- 993 -45
Buying :CITY OF SOUTHLAKE
Agency:
Contractor: :PHILPOTT MOTORS
Contact ;TIM SLIFKA
Person:
Prepared ;RICHARD HYDER
By:
Phone: E8177488312
Phone: :8889735338
Fax: :8177488048
Fax: 4097240934
Email: cTSLIFKA CI. SOUTHL,.AKE,TX.US
Email: : RECHARD .HYDER @PHILPOTTMOTORS.COM
Product A29
Code: IF
Description: ;2008 FORD F250 CREW CAB
B. Additional Published Options to be added to page I
Description Cost
Description Cost
Subtotal B: $
C. Additional Unpublished Options to be added to page I
Description Cost
Description Cost
WIGWAGS $ 99.00
WESTIN WHEEL TO WHEEL CAB STEPS BLACK $ 225.00
REAR FLASHERS $ 99.00
Subtotal C:: $ 423.00
CONTRACT PRICING WORKSHEET Contract Date
VE03 -06 11/29/07
For Standard Equipment Purchases No.: Prepared-
This This Form must be prepared by Contractor and given to End User. The H -GAC administrative fee shall be shown in Section
F. End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GAC @ 7I3- 993 -4548. Please type or print legibly.
B uying :CITY OF SOUTHLAKE Contractor: €Pl1ILPOTT MOTORS
Agency:
Contact ;TIM SLIFKA Prepared :RICHARD HYDER
Person: By:
Phone: :(817) 748 -8312 Phone: :888 973 -5338
Fax: :(817) 748 -8048 Fax: :409 724 -4934
Email: TSLIFKA(c).CI.S0UTHLAKE.TX.U Email: ' RICHARD ,HYDER@PHILPOTTMOTORS.COM
Product D38 Description: :2008 FORD E250 CARGO VAN
Code:
A. Product item Base Unit Price Per Contractor's H -GAC Contract: $ 7 14,788.00
B. Published Options - Itemize below - Attach additional sheet(s) if necessary - IncIude Option Code in description if applicable.
(Note: Published Options are options which were submitted and priced in Contractor's bid.)
Description Cost Description Cost
138" WB REGULAR LENG "fH VAN : $ - YZ OXFORD WHITE
AIR CONDITIONING € $ BRAKE CONTROLLER : $ 175.00
178 GLASS IN SIDI; AND REAR DOORS ONLY $ 92.00 LADDEI R RACK $ 565.00
FLOOR PLAN INTER-E, S l $ X10, 0 4 EYR:° ; $ 100.00
LOT INSURAN 44 4Q
4.6L V8 E85 FLEX TL11' E ]3IIIED1CNCx �.NND PlGA1TING New Ilrrtt';
CLOTH BUCKET AN PASSEIs1lt 27 00
43P POWER GROUP $ . � 5 10 90
667 QUIET FLEX RAC1 SAND BINS/BULI�IfFAD $ 369.00
536 TRAILER TOWING PKG WI HITCH $ 299.00
54E TELESCOPIC MIRRORS $ 158.00 Subtotal From Additional Sheet(s):
6 WIRE ROUND PLUG $ - Subtotal B. $ 2,650.00
C. Unpublished Options - Itemize below / attach additional sheet(s) if necessary.
(Note: Unpublished options are items which were not submitted and priced in Contractor's bid.)
Description Cost Description Cost
PDI CHARGE $ 80.00 REAR FLASHERS $ 99.00
TPMS, BODY STYLE UPGRADE (2008 ONLY) $ 916.00 Subtotal From Additional Sheet(s):
WIGWAGS $ 99.06 Subtotal C: $ 1,194.00
Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit':
Price plus Published Options (A B). ? For this transaction the percentage is: 7%
D. Other Cost Items Not Itemized Above (e.g. Installation, Freight, Delivery, Etc.)
Description Cost Description Cost
DELIVERY - -300 MILES $ 450.00
ESP PREMIUM 61100 $50 DED $ 1,930.00 Subtotal D:: $ 2,380.00
E. Total Cost Before Any Applicable Trade-in/ Other Allowances /Discounts (A +B +C +D) $ 21,012.00
Quantity Ordered: I� X Subtotal of A + R + C + D: $ 21,012.00 = Subtotal E: $ 21,012.00
F. H -GAC Fee Calculation (From Current Fee Tables) Subtotal F: $
G. Trade -Ins / Other Allowances / Special Discounts
Description Cost Description Cost
Subtotal G: $
Estimated Delivery Date: 90 DAYS ARO H. Total Purchase Price (E +F +G): $ 21,012.04