Loading...
Item 7CZA10-042 Owner: Triple 9 Sandy Lake, L.P. Applicant: Dean Tarpley, School of Rock Request: Approval of a zoning change and site plan to add studios for the practice, education or training in academics, dance and/or music and exercise as permitted uses along with the existing “O-1” office district uses that are allowed in the current “S-P-1” regulations Location: 3220 W. Southlake Boulevard, being described as Lot 14, J.G. Allen No. 18 Addition and being approximately 0.64 acres VIEW LOOKING NORTH VIEW LOOKING SOUTH VIEW LOOKING EAST VIEW LOOKING WEST Site Data Summary Gross Acreage: 36,912 square feet (0.85 acres) Square Footage: 7,529 square feet Open Space: 17% Impervious Coverage: 83% Parking Required: 41 spaces (2 HC) Parking Provided: 40 spaces (2 HC) (S-P-1 regulation based on 1 space per 188 square feet of floor area) S-P-1 Regulations The Site shall follow the “O-1” office district uses regulation in accordance with Ordinance No. 480, Section 18, as amended, except as follows:  Development Regulations: Front Yard: There shall be a front yard of not less then twenty three (23) feet. Maximum Impervious Coverage: The maximum impervious coverage shall not exceed eighty three (83%) percent of total lot area. Bufferyards shall not be required due to existing site conditions. Building shall be permitted to exist as currently constructed, but shall be permitted to be improved in accordance with the attached architectural rendering. Permitted Uses: All uses permitted in the “O-1” office district uses and the following additional uses: Studios for the practice, education or training in academics, dance and/or music and exercise. Hours of operation for these uses shall be limited to the following: M-Th.: 12:00 PM to 9:00 PM; Friday: 12:00 P.M. to 11:59 P.M., Saturday: 9:00 AM to 11:59 PM, and Sunday: 9:00 AM – 9:00 PM. Parking for the studio uses will be 1:188 (one parking spot for every 188 Sq Ft of floor area). CONCEPT PLAN ELEVATION RENDERING SITE PLAN EXISTING SITE PLAN CONCEPT PLAN ELEVATION RENDERING SITE PLAN FRONT OF BUILDING CONCEPT PLAN ELEVATION RENDERING SITE PLAN FRONT OF BUILDING CONCEPT PLAN ELEVATION RENDERING SITE PLAN FRONT OF BUILDING CONCEPT PLAN ELEVATION RENDERING SITE PLAN WEST DRIVE CONCEPT PLAN ELEVATION RENDERING SITE PLAN REAR OF BUILDING LOOKING WEST CONCEPT PLAN ELEVATION RENDERING SITE PLAN REAR OF BUILDING LOOKING EAST CONCEPT PLAN ELEVATION RENDERING SITE PLAN REAR OF BUILDING LOOKING WEST CONCEPT PLAN ELEVATION RENDERING SITE PLAN REAR PARKING LOOKING SOUTH CONCEPT PLAN ELEVATION RENDERING SITE PLAN REAR PARKING LOOKING SOUTH CONCEPT PLAN ELEVATION RENDERING SITE PLAN DRAINAGE EASEMENT CONCEPT PLAN ELEVATION RENDERING SITE PLAN DRAINAGE EASEMENT CONCEPT PLAN ELEVATION RENDERING SITE PLAN RENDERING SUBMITTED WITH EXISTING S-P-1 ZONING ZA10-042 P&Z: August 5, 2010; Approved (5-0), noting the applicant’s agreement to provide sound proofing if noise is a problem, noting that normal hours of operation end at 8:30 p.m., and subject to Site Plan Review Summary No. 1, dated July 29, 2010. Questions?