Item 4EITEM 4E
Approve a commercial developer's agreement with Hines Southlake Land, L.P. for Carillon, Phase 1A, offsite infrastructure located at the northeast corner of North White Chapel Boulevard
and State Highway 114
Project Location
Project Location
Project Location
Carillon, Phase 1A Offsite Infrastructure Improvements
Public Roadway Improvements
Portion of the South side of Kirkwood Blvd
Southmont Drive
Deceleration lane along State Hwy 114 at Southmont Drive (TxDOT)
Public Water Line Improvements
Approximately 2,800 linear feet of 12 inch water line along State Hwy 114
Approximately 2,600 linear feet of 12 inch water line along proposed Kirkwood Blvd and Southmont Drive
Carillon, Phase 1A Offsite Infrastructure Improvements
Drainage Improvements
Approximately 2,600 linear feet of storm sewer pipe
Approximately 450 linear feet of storm box culverts
Detention pond
Located on a 7.646 acre lot proposed to be dedicated to the City as a public park
This CDA does not accept this lot as a public park and will be addressed separately in the near future
Carillon, Phase 1A Offsite Infrastructure Improvements
Drainage Improvements
Earthen channels that connect to the box culvert on the Children’s site to transport flow through the two sites until future phases are constructed as part of the Carillon Development
Public Sanitary Sewer Improvements
Approximately 850 linear feet of 8 inch sewer line
RECOMMENDATION
Approve a commercial developer's agreement with Hines Southlake Land, L.P. for Carillon, Phase 1A, offsite infrastructure located at the northeast corner of North White Chapel Boulevard
and State Highway 114
Questions?
Bob Price
817-748-8097