Loading...
Item 4H AudioSOUTHLAKL Item 4H ZA07-137 9 Owner: Bosworth Farms II, L.P. Applicant Blake Architects I Request: Approval of a Zoning Change and Site Plan from "B-1" Business Service Park District to "S-P-1" Detailed Site Plan District for the development of four (4) general office buildings totaling 14,153 Integrity square feet on approximately 1.55 acres Innovation Accountability Location: 1900 E. State Highway 114 Commitment Lot 2R, Brewer Industrial Addition to Excellence Teamwork .1 T ■sM�� Y� b'. r �� Ij®S•• �� MULTIPLEIm ' FAMILY �1,ff m OFFICE DISTRICT Q. 0 NEIGHBORHOOD COMMERCIAL�: ;CZ-LOCILRETAILCOMMERCRLRCIAL M'. LL COMM IRIIL Ali J HC: HOTEL ON BU111EIIIERVICEIARK I -LIGHT NOUSTRKL $N DETAILED SITE PLAN -�minims% — : SITE PLAN J LOCATION SS 111 1 111 111 111 1�, �„7• fi �? Land Use Map Lot 2R Brewer Industrial Addition Land Use Designation: Mixed Use LEGEND 100 YEAR FLOOD PLAIN CORPS OF ENGINEERS BOUNDARY PUBLIC PARKS/OPEN SPACE PUBLIC/SEMI-PUBLIC LOW DENSITY RESIDENTIAL MEDIUM DENSITY RESIDENTIAL f. �� soar„wEsr,Kwr �.sr OFFICE COMMERCIAL � RETAIL COMMERCIAL MIXED USE TOWN CENTER REGIONAL RETAIL �. INDUSTRIAL LOCATION MAP N 1000 0 1000 2000 3000 Feet 3 Optional Land Use Map Lot 2R, Brewer IndustrialAddition Optional Land Use: Employment Center 1 (EC-1) LEGEND I � RC � ILI EC-1 _ ■■■-r�■Nr■■ 1�LOCATION MAP/ ►�.r��■����rn■.. LLLL ■■� ��y*� i�i ti 111 I 1000 2000 3000 Feet1�,�•� �? El 5 xg AM c 4 / i I 0 7 9 10 Site Plan 11 G 61N31 e'�u9Al9LI�iimom f r � E — teir� .�.. — WEOT ELEVATION I� r R djr I +2f �t Srd, I 4W'i va ltt-,y l I � J •: y EAST ELEVATION UTw ELEVATIONS VAST @L@NATION A 12 Vil 13 Man moo©i(T♦p� � � �•�� - sue: � � �M� . - 1 I 1 14 15 0- - SOUTHLAKL 9 Integrity Innovation Accountabilin, Commitment to Excellence Teamwork Site Data Summary Gross/Net Acreage: 67,781 square feet 1.55 acres Number of Buildings: 4 General Office Buildings Square Footage: 14,153 square feet total - Bldg. A 5,013 sq. ft. - Bldg. B 3,772 sq. ft. - Bldg. C 2,370 sq. ft. - Bldg. D 2,998 sq. ft. Parking Required: 60 spaces Parking Provided: 58 spaces Open Space: 21,108 square feet (31%) Impervious Cover: 46,673 square feet (69%) Cry Oi SOUTHLAKL Proposed S-P-1 Zoning Regulatio This "S-P-1" Detailed Site Plan Zoning District sha follow the uses and regulations set forth in the "C 1" Office District, with the following exceptions: Building line setbacks shall be fift -_ adjacent for residential adjacency. -The 4:1 slope restriction for residential adjacency shall be _ waived. -Parking shall be eight (8) spaces for the first 1.000 square feet and one (1) car per 300 square feet after that minus 10%. Integrity -All lots within this development as a whole will have a maximum of 69% impervious coverage. Each lot on its own Innovation will not be limited to a maximum of 65% impervious coverage. Accountabilin, -Minimum building size will not be less than 2,300 square feet. Commitment -Minimum side yard setback shall not be less than ten (10) to Excellence feet. Teamwork -Articulation shall be per elevations on plans. -No bufferyards are required between interior lot lines. "I. "r'- Item SOUTHLAI<E 9 4�q P&Z Action: April 17, 2008; Ap Revised Site Plan Review Summary No. dated April 1, 2008 granting the request variance to driveway stacking Integrity Innovation Accountability Commitment to Excellence Teamwork C�ry Oi - SOUTHEAKE =_ Questions? Ken Baker Integrity (817) 748-8067 Innovation Richard Schell Accountability (817) 748-8602 Commitment to Excellence Teamwork