Item 4C Audio1 The construction of the Kimball Avenue Improvements links to the city’s strategy map relative to the focus areas of Mobility, Infrastructure, and Performance Management and Service Delivery. The specific corporate objectives that are met by this construction project include: Providing travel convenience within city and region ; Providing high quality customer service; and Investing to provide and maintain high quality public assets. 2 3 4 The original limits of the project were from SH 114 to Dove Road. The city limit line with Grapevine is north of Shady Lane along the Kimball Avenue centerline. The project was divided into two phases during design. Phase 1, within the city of Southlake, was determined to be from SH 114 to north of Kirkwood Boulevard. With the construction of the school on Kirkwood Boulevard, the city elected to extend Phase 1 to include the East Highland Street intersection. Phase 2, from north of East Highland Street to Dove Road, would have been constructed at some future date. 6 Kimley-Horn has prepared 95% plans for Phase 1, from SH 114 to north of Kirkwood Boulevard. They also prepared 95% plans for the extended Phase 1, from SH 114 to north of Kirkwood Boulevard. Subsequent to that submittal, Grapevine requested the entire project be constructed from SH 114 to Dove Road without phasing and will participate in funding their portion. This amendment for design provides the services required for construction of the entire project. 8 The project schedule is as follows. Design of the entire section of Kimball Avenue from SH114 to Dove Road will be completed in the 3 rd quarter of 2010. Row acquisition is currently underway and utility relocations are anticipated to begin this summer and should be completed in time for construction in the 4 th qtr of 2010. Construction should begin in the 4 th qtr of 2010 with a construction time of approximately 18 months. Construction completion is anticipated in the 2 nd quarter of 2012. 10 11