Item 6GZA10-026 Owner: Sabre Group Inc. Applicant: Brockette Davis Drake, Inc. Request: Site Plan approval for 336 surface parking spaces at Sabre Corporate Campus Location: 3110 – 3150
Kirkwood Blvd. APPROVED DEVELOPMENT PLAN SITE PLAN CONCEPT PLAN ELEVATION RENDERING SITE PLAN PAVING PLAN N CONCEPT PLAN ELEVATION RENDERING SITE PLAN VARIANCES N Driveway Spacing Required:
250 ft Provided: 180 ft Stacking Depth Required: 100 ft Provided: 40 ft Lighting Required: High Pressure Sodium Provided: Metal Halide CONCEPT PLAN ELEVATION RENDERING SITE PLAN PAVING
PLAN N Left turn bay CONCEPT PLAN ELEVATION RENDERING SITE PLAN LANDSCAPE PLAN TREE LEGEND Lacebark Elm Multi-Trunk Vitex Southern Wax Myrtle Southern Live Oak Eastern Red Cedar
Existing 3” Cal. Red Oak Existing 5” Cal. Bois D’ Arc VARIANCES Driveway Ordinance No. 634, as amended, Section 5.1 Design Criteria for driveway spacing Driveway Ordinance No. 634,
as amended, Section 5.2 Design Criteria for stacking Lighting Ordinance No. 693-B, as amended, Section 4 (b) Lighting Design for metal halide lighting PLANNING & ZONING COMMISSION
May 20, 2010; Approved (4-1) noting the applicant’s willingness to explore the possibility of moving the northern driveway further north, granting the variances to driveway spacing,
driveway stacking depth and lighting for the use of metal halide lighting and subject to Site Plan Review Summary No. 2, dated May 13, 2010. Questions? * *