Loading...
Item 4ECITY OF SOUTHL_AKE MEMORANDUM (May 4, 2010) To: Shana Yelverton, City Manager From: Robert H. Price, P.E., Director of Public Works Subject: Approve Change Order No. 4 for the South White Chapel Boulevard /Continental Boulevard Intersection Improvements Project with Quality Excavation, Ltd. in the amount of $36,254.05 Action Requested: Approve Change Order No. 4 for the South White Chapel Boulevard /Continental Boulevard Intersection Improvements Project with Quality Excavation, Ltd. in the amount of $36,254.05 Background Information: The contract for the S. White Chapel Blvd. /Continental Blvd. Intersection Improvements project was awarded to Quality Excavation, Ltd. in May, 2009 for the construction of a roundabout. Change Order No. 4 includes the final reconciliation of miscellaneous changes during construction for construction of the roundabout at South White Chapel Boulevard and Continental Boulevard including additional electronic message boards to notify commuters of lane closures within the intersection and traffic delays due to construction, as well as for additional temporary pavement as needed to allow the intersection to safely remain open to traffic during construction of the roundabout. Previous change orders approved by the City Manager bring the total to $56,587.52 which is above the City Manager's signatory authority. Change Order No. 1 (July 2009) $7,583.47 Change Order No. 2 (August 2009) $11,250.00 Change Order No. 3 (December 2009) $1,500.00 Change Order No. 4 (May 2010) $36,254.05 Total Change Orders $56,587.52 Change Order No. 4 also adds 28 calendar days to the contract to compensate for the severe weather of the winter months to allow the contractor to install patterned asphalt and striping once the temperatures rose above 45 degrees. Construction of the intersection is now complete and landscaping and irrigation improvements will commence in the next several weeks. Financial Considerations: The total amount of Change Order No. 4 to the existing contract is $36,254.05. This will increase the construction cost to $572,641.73. Funds for construction of the project, including this change order, are budgeted in the FY2008, FY2009 and FY2010 Capital Improvement Program. Strategic Link: The construction of the roundabout at the intersections of South White Chapel Boulevard and Continental Boulevard links to the city's strategy map relative to the focus areas of Mobility, Infrastructure, and Performance Management and Service Delivery. The specific corporate objectives that are met by this construction project include: Providing high quality customer service; Investing to provide and maintain high quality public assets; and Providing travel convenience within city and region. Citizen Input/ Board Review: None Legal Review: This is the Change Order form that has been previously reviewed by the City Attorney. Alternatives: The City Council may approve Change Order No. 4 or deny it. Supporting Documents: Location Map Change Order No. 4 Project Schedule: Change Order No. 4 adds 28 calendar days to the contract to compensate for the severe weather of the winter months to allow the contractor to install patterned asphalt and striping once the temperatures rose above 45- degrees. Construction of the intersection is now complete and will be followed immediately with landscaping and irrigation. Staff Recommendation: Approve Change Order No. 4 for the South White Chapel Boulevard /Continental Boulevard Intersection Improvements Project with Quality Excavation, Ltd. in the amount of $36,254.05 Staff Contact: Robert H. Price, P.E., Director of Public Works Gordon J. Mayer, Jr., P.E. Deputy Director of Public Works Cheryl Taylor, P.E. Civil Engineer 1 .jw; a S.i C Project: S. White Chapel Blvd, Xnn tinental Blvd. Intersection Improvements OWNER Cit y of Southlake Contract for $516,054.21 Contract Date: May 5, 2009 To: O ualify Excavation LTD, Contractor You are directed to make the changes noted below in the subject contract for the dollar amount stated below including all labor, equipment, materials, overhead, and profit: Nature of the changes: 1, Item #5 Add 175 --. 12" PVC DR -18 (C900) Waterline ($58.40/L.F.) $10,220.00 2. Item #6 Delete 1 - 12" Gate Valve ($2,120.00 /Ea.) - $2,120.00 3. Item #7 Delete 1 --- 2" Water Service Tap ($1,020.00/Ea.) - $1,020.00 4. Item #11 Delete 1 - Install Water Meter Box ($107.00 /Ea.) - $107.00 5. Item #12 Delete 3 - Connect to Existing Water Main ($3,880.00/Ea.) - $11,640.00 6. Item #15 Add 143 - Temporary Asphalt Repair ($26.00/LF.) $3,718.00 7. Item #16 Delete 1 - Remove and Salvage Exist. Valve ($460.00 /Ea.) - $460.00 8. Item #21 Delete 3 --- 24" Class III RCP ($57.00 /LF.) - $171,00 9. Item #22 Delete 3 - Trench Safety Storm Sewer ($1.50/LF.) -$4.50 10. Item #23 Add 484 - Temp. Pavement for Storm Sewer ($26.00/LF.) $12,584.00 11. Item #29 Add 23 --- Cement ($134.00 /TON) $3,082.00 12. Item #33 Add 161 - 2" Type D Asphalt ($9.90 /SY.) $1,593.90 13. Item #34 Add 170 - Concrete Laydown Curb ($21.20/LF.) $3,604.00 14. Item #35 Delete 115 -Concrete Ribbon Curb ($17.70/LF.) - $2,035.50 15. Item #36 Delete 5 - Concrete Truck Apron Curb ($22.90/LF.) - $114.50 16. Item #37 Delete 5 - Concrete Central Island Curb ($24.20 /LF.) - $121.00 17. Item #38 Add 114.49 --- 6" Concrete Sidewalk (6' wide) ($39.00 /SY.) $4,465.00 18. Item #43.1 Add 1.65 - Electronic Message Boards ($7,583.47/LS.) $12,500.00 19. Item #45 Add 75 - 4" PVC Conduit (Bore) ($19.00 /LF.) $1,425.00 20. Item #49 Delete 16 - Reflec. Pavement Markings White 4" Solid ($0.85/LF.) - $13.60 21. Item #50 Delete I - Reflec. Pavement Markings White Solid 6" ($1.10 /LF.) -$1.10 22, Item #51 Add 14 - Reflec. Pavement Markings White 8" ($1.60 /LF.) $22.40 23. Item #52 Add 4 - Reflec. Pavement Markings 24" Solid ($790/LF.) $31.60 24. Item #53 Delete 2 - Ref. Pvmt Markings White 18" Yield Triangles ($40.00/Ea.) 480.00 25. Item #54 Delete 436 - Reflec, Pavement Markings Yellow 4" ($0.80 /LF.) - $348.80 26. Item #55 Delete 25 - Reflec. Pavement Markings Yellow 24" ($7.90/LF.) - $197.50 27. Item #58 Delete 8 - Reflec. Pavement Markers Type II -A -A ($4.50/Ea.) - $36.00 28. Item #59 Delete 10 --- Reflec. Pavement Markings Type II -C -R ($4.50 /Ea.) - $45.00 29. Item #60 Add 46 - Traffic Button Type I-C ($8.50/Ea.) $391.00 30. Item #61 Delete 482 - Surface Prep, for 4" Markings ($0.16 /LF.) - $77.12 31. Item #62 Delete 1 - Surface Prep. for 6" Markings ($0.23/LF.) -$0.23 31 Item #63 Add 14 - Surface Prep. for 8" Markings ($0.34 /1,F.) $4.76 33. Item #64 Delete 21 - Surface Prep, For 24" Markings ($1.10 /LF.) - $23.10 34. Item #66 Add 28 - Surface Prep. For Marking RPM ($0.28 /LF.) $7.84 35. Item #67 Delete 2 --- Surface Prep. For 18" Yield Triangles ($2.25/Ea.) -$4.50 36. Item #73 Add 4 --- Relocate Sign Bases Per City ($250.00/LS.) $1,000.00 37, Item #74 Add 3 - Move Signs to Other Bases ($75.00/LS.) $225.00 Total: Page 1 of 2 These changes result in the following adjustment of contract price and contract time: Contract Price Prior to this Change Order Net Increase Resulting from this Change Order Current Contract Price Including this Change Order The above changes are approved: S 536.387.68 $ 36.254.05 $ 572, 641.73 Ciu of South lake City M Title: May Date: Contract Time Prior to this Change 230 calendar da s (Days or Date) Net Increase Resulting from this Change Order 28 calendar days (Days) Current Contract Time Including this Change Order 258 calendar da s (Days or Date) The above changes are recommended: Qy o Southlake city Title: City Engineer Date: 2010 Ciu ofSouthlake City LM Title: Protect Manager Date: J 2010 City o Southlake City By: Title: Director Public Works P101ra 2010 Q uality Excavation LTD. Contractor By: Date: �Z - z � ..--- Page 2 of 2