WS Item 3 (2)Space/ Master Planning for Future Space Needs
Brinkley Sargent Architects
Dwayne Brinkley
Gina Irwin
December 18, 2007
Presentation Agenda
Background of Study
Goals
Results
General Observations
Future Improvements Concepts
Growth Opportunities
Future Improvements Budgets
Next Steps for City
Goals of Study
Analyze Departments and Determine Space Needs
Determine Condition and Constraints of Existing Facilities/Sites
Identify Facility Utilization Options and Budgets
Create Facility Phasing Timeline and Priorities
Create a document that is a building block for future updates
General Observations - Library
Parking can be a challenge for patrons
Amount of natural light in reading areas is lower than normal for a library
Collection growth is limited due to restricted space; many key staff have moved to another floor to allow collection to expand on first floor; staff is currently in County space and
fourth floor office.
COMMUNITY CENTER TRENDS
COMMUNITY CENTER TRENDS
Community Center Components
Enhanced and expanded facilities for Library and Senior Center
New Recreation Center and programs
Large meetings space with catering kitchen
Community Services Offices
General Observations, Community Services
Outdoor Recreation is excellent
Indoor recreation opportunities are limited
Existing Pond
Existing Seniors
Existig Pond
General Observations – Town Hall
Beautiful Town Hall has some space utilization inefficiencies
Simultaneous use of Town Hall for public and staff meetings create some challenges
Municipal Court/Admin and Lobby are undersized and are planned to move
Security in Town Hall could be improved
Improved Directional Signage at Town Hall is an opportunity to quickly orient visitors
Brinkley Sargent Architects
Town Hall
PLANNING,
CODE ENFORCEMENT
BUILDING INSPECTIONS
PUBLIC WORKS ADMIN
Brinkley Sargent Architects
Overflow Council / CME
RECEPTION/
INFORMATION
Brinkley Sargent Architects
Total Area of Renovation =
23,454 SF
Opportunities in Support of Growth
Town Hall
Relocate Courts to Public Safety Facility
Place Development Services Departments together on convenient lower floor
Create an Information point
Could explore trading space with County to better suit department adjacencies/growth
Dedicate meeting space to staff and training, and create new public meeting space
Improve Security and Signage
Provide areas for departmental growth; Options include:
Relocate library or move some departments off-site
Make better use of some underutilized areas such as Copy Center,
Break Area and Mail Room
DPS West Response Actions
Expand Training space to double capacity
Modify for Police Community Initiatives
Enlarge Day Room
Expanded Work/Copy and Report Writing areas for Fire and Police
DPS West – Final Design Direction
General Observation: Service Center
Combined Service Center yard for Public Works, Parks, and Central Warehouse should be explored for more efficiency.
Service Center
Conceptual Space Allocation
NORTH
Service Center
Relocate Continental Storage to Service Center
Locate Park Maintenance to Service Center
Potential to locate Animal Shelter on Site in future
Locate Records Management and Central Warehouse on Site
Provide office/storage space for Facilities Maintenance
Provide covered area for equipment
Provide bays for Public Works and Parks.
Provide separate employee and public parking
Stand Alone Improvements
Animal Shelter (if required)
Central Warehouse
Records Management
Facility Maintenance
Overall Staffing
Reflects approximately 7.5% reduction in staffing ratio from present level
Response Actions
Basis for Budgets
Budget Estimates include total development costs
Construction, FF&E, Indirect Costs, Contingency
No Land Acquisition Costs required.
Budget Estimate reflects 3rd quarter 2007 dollars
For accurate budgets, they should be escalated by 7% annually to mid-point of construction
Budget Basis
Southlake Standards
Service Center– enhanced façade buildings
Next Steps
Continue to evaluate Library Options
Develop strategies to implement directions desired
Communicate w/stakeholders
Opportunities in Support of Growth
Joint Facility that addresses Recreation, Senior, Public Meeting and Library needs
Central Receiving/Warehouse
Enhanced/Combined Service Center
Dedicated, City-Owned Records Management Facility
Relocate Facility Maintenance Department to Service Center