Loading...
Item 4FItem 4F ZA07-066 OWNER/ APPLICANT: Tri-Dal Ltd. REQUEST: Approval of first reading for a zoning change and revised site plan from "S-P-1" Detailed Site Plan District to "S-P-1" Detailed Site Plan District to include a contractor's storage yard. The purpose of this request is to add a two-story office addition of approximately 4,200 square feet to an existing building. Zoning change is required to add building square footage. LOCATION: The property is located at 540 Commerce Street. Commerce St Exchange Blvd Market Loop Nolen Dr View looking north toward property Commerce St Exchange Blvd Market Loop ZA07-066 The property will conform to the existing “S-P-1” zoning district with I-1 uses (including a contractor’s storage yard) and development regulations (Ordinance No. 480-41, as amended). Previously Approved Site Plan Revised Site Plan Area of addition Requesting variance to sidewalk requirements Building Elevations Building photos Photos provided by applicant supporting sidewalk variance request Item 4F ZA07-066 P&Z ACTION: July 5, 2007; Approved (5-0) subject to review and granting the requested variance. Questions? Item 4G ZA07-073 OWNER: Todd & Amanda Tracy APPLICANT: Kenny Anderson Construction REQUEST: Approval of a Plat Revision. LOCATION: The property is located at 400 S. White Chapel Boulevard. S. White Chapel Blvd Londonberry Terrace Stratfort Parc The Gardens at Stratfort Parc Proposed Plat Revision Proposed Plat Revision Reduction in Drainage Easement Item 4G ZA07-073 P&Z ACTION: July 5, 2007; Approved (5-0) subject to review. Questions? Existing Plat Public Works Presentation Proposed Channel Improvements Channel Cross Section Questions? Item 4H SP07-213 APPLICANT: SLTS Block 22, L.P. LOCATION: Northeast corner of Central Drive and F.M. 1709 REQUEST: Master Sign Plan for Block 22, Southlake Town Square. The proposed regulations are almost the same as the existing regulations for Block 23, Southlake Town Square. Maximum Letter/Logo Height Maximum Area Letter/Logo Height and Maximum Area Regulations Number of Signs (Same as Block 23 Regulations) First Floor Signs On each building wall which faces a street, drive, or parking area: one fascia sign OR one building blade sign AND one pedestrian blade sign Signs Above the First Floor On each building wall which faces a street, drive, or parking area: one window sign OR one awning sign at every other window AND one fascia sign on facades of 50 feet or more in length Types of Illumination (Same as Block 23 Regulations) Exterior illumination (by externally mounted spot lighting) Silhouette lighting (e.g., neon illuminated behind a solid, opaque letter) Up lighting (e.g., projecting fixtures attached to the building under the letters) Sign box panel with push through letters, internally illuminated Exposed neon lighting Non-Conforming Signs (Same as Block 23 Regulations) Harmonizes with the structure or structures on the parcel on which it is to be applied; Is compatible with the other signs or graphic designs on the premises; Is suitable and appropriate to the Town Square; Contributes to any special characteristics of the particular area in which it is to be located; Is well designed and pleasing in appearance; Is desirable as an urban “downtown” design characteristic Does not constitute a nuisance to the occupants of adjacent or contiguous property; Is not detrimental to property values; and Does not constitute a traffic and safety hazard. Certain signs, while not technically meeting the requirements set forth herein, will nonetheless be considered for approval on a case-by-case basis. Such signage shall be approved if it: Item 4H SP07-213 QUESTIONS? Item 6C ZA07-045 OWNER: Carroll I.S.D. APPLICANT: Gateway Church REQUEST: Approval of a specific use permit for a mass gathering event for the Gateway Church Fall Festival to be located at Dragon Stadium. LOCATION: The property is located at 1085 S. Kimball Avenue. S. Kimball Ave Silicon Dr Area of Festival Event Parking View looking east toward Dragon Stadium Silicon Dr S. Kimball Ave Area of Festival Event Parking ZA07-045 The Gateway Church Fall Festival will include: tents, inflatables, games/booths, food court, first-aid station with a nurse, information booth, and lost and found. The restroom facilities of the stadium will be open for use at the event. Date of Event: October 30, 2007 Hours of Operation: 6:00 p.m. to 9:00 p.m. Estimated Attendance: 10,000 to 12,000 persons Lighting: Parking lot lighting, stadium lights, & 6 light towers Parking: North parking lot to be open for public parking Traffic: 7 – 10 off-duty officers Trash Disposal: Stadium trash facilities, trashcans located throughout parking lot Item 6C ZA07-045 P&Z ACTION: June 7, 2007; Approved (7-0) subject to the staff report as presented. Questions? Item 6D ZA07-050 OWNER/ APPLICANT: Cooper & Stebbins REQUEST: Approval of second reading for a zoning change and revised concept plan for the purpose of realigning Division and State Street and some block configurations to accommodate the proposed DPS Central Facility, modify open space area and rezone some portions of property currently zoned “C-3” general commercial district to “DT” downtown district. LOCATION: The property is located at 245 N. Carroll Avenue, 1297 Division Street, 1301 and 1501 E. State Highway 114, and at the southeast intersection of the eastbound E. State Highway 114 frontage road and Central Avenue. Open Space Summary Original Concept Plan = 12.17 Acres of Open Space New Concept Plan = 11.73 Acres of Open Space Proposed Reduction = 0.44 Acres Existing: Rustin Park 0.94 A Family Park 0.82 A Plaza 0.34 A McPherson 3.26 A Summit 2.05 A Total (Existing) 7.44 A Open Space Requirements New Concept Plan = 11.73 Acres of Open Space Provided = 7.44 Acres (Parks) Proposed as Part of the Concept Plan = 4.29 Acres North McPherson = 0.51 A Block 19 = 2.8 A South Summit = 0.09 A Future Open Space TBD (Lot 11, 16 or Brownstone Phase 3) = 0.89 A Revised Concept Plan Previous alignment for Division St. C-3 to DT DT to S-P-1 * 0.89 ac open space location TBD (pvt. maintenance) Revised Open Space Plan for Southlake Town Square Area to be added to the park PVT. Open Space Park Board Recommendation (APPROVED 7-0) subject to the following: Acceptance of approximately 0.5 acres of park land on the northwest corner of McPherson Park in lieu of approximately ± 1 acre north of McPherson Park; and Developer is to maintain a minimum of 2.2 acres of private open space north of the Brownstones with the use of park credits or payment of park dedication fees to be applied to the difference between 2.8 acres and the actual private open space; and Developer to pay park dedication fees outright for remaining open space requirements of ± 1 acre.) Item 6D ZA07-050 P&Z ACTION: June 7, 2007; Approved (7-0) subject to review. COUNCIL ACTION: June 19, 2007; Approved first reading (6-0) noting the City will retain 0.44 acres of open space with location to be determined later; requiring a schematic for the open space to be brought before Council prior to the final approval of the block north of the Brownstones; and requiring the open space north of the Brownstones to be open to the public. Questions? Public Works Presentation Questions? Previously Approved Concept Plan Item 6E ZA07-049 OWNER/ APPLICANT: City of Southlake REQUEST: Approval of second reading for a zoning change and site plan for “S-P-1” Detailed Site Plan District for the purpose of constructing an 86,454 square feet, 2 - 4 story building to house the City’s central public safety offices (police and fire) and to provide additional community meeting space. LOCATION: The property is located at 667 N. Carroll Avenue. E. Dove Street N. Carroll Ave View looking east toward property N. Carroll Ave Southcrest Ct E. State Highway 114 View looking west toward property N. Carroll Ave Southcrest Ct ZA07-049 The “S-P-1” zoning proposes to comply with the “DT” Downtown District permitted uses and development regulations with the following exceptions: To include a two level structured parking garage as a permitted use Bufferyards and landscaping as shown on the site plan ZA07-049 Overall Site Data Gross Acreage: 4.75 acres Net Acreage: 4.42 acres Building Size: 86,454 sq. ft. Parking Required: 242 spaces Parking Provided: 249 spaces Open Space: 18.3% (35,243 sq. ft.) Impervious Cover: 81.7% (157,252 sq. ft.) Proposed Site Plan Dumpster Parking Structure Metal Entry Gate Metal Entry Gate Main Entrance Entrance Masonry Wall Sidewalk/Street Trees Building Elevations (Color) Building Elevations Building Elevations Tree Conservation Plan (Color) Tree Conservation Plan Landscape Plan Bosque Elm (typ.) Shumard Oak (typ.) Landscape Plan Item 6E ZA07-049 P&Z ACTION: June 7, 2007; Approved (7-0) subject to review. COUNCIL ACTION: June 19, 2007; Approved first reading (6-0) subject to the Site Plan Review Summary No. 2, dated June 1, 2007, and subject to the recommendations of the Planning and Zoning Commission. Questions? Public Works Presentation Utility Plan Drainage Plan Questions? Item 6F ZA07-055 OWNER/ APPLICANT: City of Southlake and Cooper & Stebbins REQUEST: Approval of a revised preliminary plat for the purpose of modifying the streets and block alignments within the western portion of the Southlake Town Square development. This proposal also includes the City’s public safety facility. LOCATION: The property is located at 1299 Division St, 1297 Division St, 667 N. Carroll Avenue, 1501 E. State Highway 114, and 245 N. Carroll Avenue. Previously Approved Preliminary Plat Revised Preliminary Plat Item 6F ZA07-055 P&Z ACTION: June 7, 2007; Approved (7-0) subject to review. Questions? Item 6G ZA07-065 OWNER: City of Southlake APPLICANT: Cheatham & Associates REQUEST: Approval of a plat revision to redefine the future lot boundary for the development of the DPS Central facility. The plan proposes a single lot of approximately 3.8 acres. LOCATION: The property is located at 245 and 667 N. Carroll Avenue. E. Dove Street N. Carroll Ave Plat Revision Item 6G ZA07-065 P&Z ACTION: June 7, 2007; Approved (7-0) subject to review. Questions? Item 6H ZA07-052 APPLICANT: Southlake Land Holdings L.P. REQUEST: Approval of second reading for a zoning change and concept plan from "AG" Agricultural District and "SF-1A" Single Family Residential District to "S-P-2" Generalized Site Plan District with "O-2" Office District uses to include medical care facilities, health service facilities, offices of a business and/or professional nature, parking lots and garages, subsurface parking and carports. LOCATION: The property is located at 335 E. State Highway 114. E. Highland Street Summerplace Lane E. State Highway 114 View looking east toward property E. Highland St E. State Highway 114 View looking west toward property E. Highland St E. State Highway 114 Highland Street looking east Item ZA07-052 CITY COUNCIL ACTION: June 19, 2007; Approved first reading (6-0) granting the requested variances as approved by the Planning and Zoning Commission; subject to Concept Plan Review Summary No. 2, dated June 1, 2007; incorporating applicant’s presentation tonight and the agreement with the homeowners as stated by the applicant; confirming and incorporating underground utilities as described by the applicant; trees to be live oaks and red oaks as well as other appropriate types of trees; requiring more detail on building materials by the second reading with samples if possible; including Exhibit ‘D’ as presented to City Council tonight; requiring developer to show first phase of the development including landscaped areas; Item ZA07-052 CITY COUNCIL ACTION CONTINUED: requiring clear depictions of the views from the Highland Street residences; requiring any construction entrances to be located on the State Highway 114 access road; noting the applicant’s agreement to a 20 foot bufferyard along Highland Street with 3 ½ foot berm; requiring that any roof-mounted mechanical equipment will not be visible from State Highway 114; requiring internal sidewalks to be five feet in width; and requiring shrub plantings to be five feet on center instead of three feet. First Reading Recommendations First Reading Recommendations Phase 1 Plan First Reading Recommendations Parking Garage - Conceptual Images First Reading Recommendations Conceptual Building Plan First Reading Recommendations First Reading Recommendations First Reading Recommendations Concept Plan Revisions Concept Plan – First Reading Item # 1--Revised Concept Plan – Second Reading Open Space on SH 114 Parking Reconfigured Additional Cross Access Parking added Revised Concept Plan – Second Reading Driveway Spacing: Required = 250 ft Provided = 194 ft Driveway Spacing: Required = 250 ft Provided = 146 ft Driveway Stacking: Required = 150 ft Provided = 43 ft Driveway Stacking: Required = 150 ft Provided = 35 ft Driveway Stacking: Required = 150 ft Provided = 23 ft * Requesting that parking garages be excluded from the interior landscape calculations. QUESTIONS ZA07-052 Overall Site Data Gross Acreage: 30.17 acres Net Acreage: 29.86 acres Building Size: 970,000 sq. ft. -510,000 sq. ft. Medical Office -460,000 sq. ft. Hospital Open Space: 27% (348,718 sq. ft.) Impervious Cover: 71% (951,967 sq. ft.) P& Z Presentation The “S-P-2” zoning proposes to allow “O-2” Office District uses to include the following as permitted uses: P&Z Presentation The applicant proposes the following accessory uses to be permitted: P&Z Presentation The development regulations shall follow the “O-2” Office District with the following exceptions: P&Z Presentation The development regulations shall follow the “O-2” Office District with the following exceptions: (Continued) Concept Plan Presented to P&Z Concept Plan presented to P&Z Driveway Spacing: Required = 250 ft Provided = 194 ft Driveway Spacing: Required = 250 ft Provided = 146 ft Driveway Stacking: Required = 150 ft Provided = 43 ft Driveway Stacking: Required = 150 ft Provided = 35 ft Driveway Stacking: Required = 150 ft Provided = 23 ft * Requesting that parking garages be excluded from the interior landscape calculations. Conceptual Building Rendering Residential Adjacency Slope Exhibit Highland St. Pedestrian Access Plan Tree Conservation Analysis Highland Street Buffer Exhibit Item 7D ZA07-052 P&Z ACTION: June 7, 2007; Approved (7-0) subject to Concept Plan Review Summary No. 2, dated June 1, 2007; with the following changes and recommendations: 1. With respect to permitted uses: * Exhibit C, Paragraph 2, striking ambulatory dispatch (Exhibit C - #2) * Blood bank limited to accessory use to hospital; not available for retail (Exhibit C - #2) * Cleaning, dry cleaning, and pressing services limited to hospital use only; no retail (Exhibit C -#2) 2. With respect to level of care that hospital will provide * There will be no trauma type care and to be further defined and clarified pursuant to licensing and legal requirements and languages with the intended uses that are reflected in this application (Exhibit C - #1). 3. With respect to the development regulations: * Maximum allowed impervious coverage at 71% (Exhibit C- #6) * Parking along SW half of the property along Highland to be eliminated (Concept Plan) * Eliminating 3 parking spaces along entrances on SH 114 on each side (Concept Plan) Item 7D ZA07-052 P&Z ACTION CONTINUED: * Accepting the applicant’s willingness to include a landscape berm to include evergreen landscaping not to exceed 36 inch off centers; expected to grow to a mature height of 8 feet with initial plantings ranging from 5 to 7 feet (Exhibit C #8). * Berm to have centerline height of 3 ½ feet 4. With respect to the height of the proposed medical office buildings (Concept Plan): * In the SW corner of the property – limited to 3 stories above ground in height * In the NW corner of the property – limited to 4 stories above ground in height * Included in Exhibit D, the applicant will have the option of complying with the Concept Plan with the paragraphs included therein and also complying with the SH 114 Corridor Overlay requirements (Exhibit D). Item 7D ZA07-052 P&Z ACTION CONTINUED: 5. With respect to the variances requested: * Granting the variances for driveway spacing requirements for the entrance on the eastern part of SH 114 and also the SE entrance along Highland * Granting variance in stacking depths * Granting variances for the parking garage landscape calculation exclusions and the overall landscape requirements * Granting variance for the lot abutment public/private street requirements subject to satisfactory reciprocal easement and access agreements Highland St. Bufferyard Item ZA07-052 The following slides are revisions submitted since the first reading on June 19, 2007. Questions? Public Works Presentation Highland Street Exhibit Questions? Item 6I ZA07-053 OWNER: Cambridge Healthcare Development Corp. APPLICANT: Harris Methodist Southlake REQUEST: Approval of a revised site plan proposing to alter the footprint, floor area, and building elevations to add hospital beds and operating rooms to the existing Phase I facility. LOCATION: The property is located at 1545 E. Southlake Boulevard. E. Southlake Blvd S. Carroll Ave Central Ave Summit Ave View looking north toward property Central Ave E. Southlake Blvd View looking east toward property Central Ave E. Southlake Blvd ZA07-053 Overall Site Data Gross/Net Acreage: 12.47 acres Existing Bldg Size: 86,728 sq. ft. Proposed Bldg Addn: 8,372 sq. ft. Total: 95,100 sq. ft. Existing beds 6 beds Additional beds 10 beds Total 16 beds Parking Required: 348 spaces Parking Provided: 351 spaces Open Space: 50% (271,806 sq. ft.) Impervious Cover: 50% (271,387 sq. ft.) Previously Approved Site Plan Revised Site Plan Areas of Expansion Previously Approved Elevations North Elevation – No Change East Elevation Elevation –Changes Proposed South Elevation Elevation –Changes Proposed West Elevation Elevation –Changes Proposed Previously Approved Elevations Building Elevations *The applicant is requesting variances to horizontal & vertical articulation regulations West South East East Landscape Plan Item 6I ZA07-053 P&Z ACTION: June 7, 2007; Approved (7-0) subject to review and granting the requested variance. Questions? Item 7A ZA07-005 OWNER: James Stahala APPLICANT: Oracle Engineering REQUEST: Approval of first reading for a zoning change and concept plan from “AG” Agricultural District and “C-1” Neighborhood Commercial District to “S-P-2” General Site Plan District for Chapel Crossing Shopping Center. LOCATION: The property is located at 245 W. State Highway 114 and 200 Countryside Ct. S.H. 114 View looking north toward property S.H. 114 S.H. 114 Access Road SITE View looking east toward property SITE S.H. 114 Access Road Countryside Court View looking south toward property SITE S.H. 114 Access Road Countryside Court View of site along White Chapel Blvd, looking north View of site along Countryside Court, looking west ZA07-005 The permitted uses and development regulations will follow the “C-3” General Commercial District with the following exceptions: The following “C-3” General Commercial District uses shall be eliminated: Auditoriums, theaters and cinemas; Commercial amusement centers and bowling alleys where the activity is for indoor operations and activities only, including indoor driving ranges and indoor miniature golf courses; Conventional golf courses, including outdoor driving ranges accessory thereto, but excluding outdoor miniature golf courses; Lodges, sororities and/or fraternities; Mortuaries, funeral homes and undertakers; Nursery buildings for the retail sale of plants and accessory items where the sales operations are conducted entirely within an enclosed structure. Outdoor storage or sale shall be permitted with this use to the extent that the outdoor sales area is completely enclosed by a fence, wall or screening device; Skating rinks, ice and roller (indoor only); Taverns, clubs, and other comparable establishments under which the on-premises consumption of alcoholic beverages is permitted subject to the issuance of a special use permit as required in Section 45. Gas stations Hotels ZA07-005 Parking - The required parking ratio shall be 1 space per 200 square feet for all uses. Horizontal Articulation – Allow the horizontal articulation on the west façade of building ‘A’. Interior Bufferyards – Bufferyards along interior lot lines shall not be required. ZA07-005 Overall Site Data Gross/Net Acreage: 6.23 acres Number of Lots: 3 lots Number of Buildings: 5 buildings Square Footage: 44,814 square feet - 38,314 sq. ft. Retail - 3,500 sq. ft. Bank - 3,000 sq. ft. Restaurant Parking Required: 224 spaces (ratio of 1:200) Parking Provided: 275 spaces Open Space: 68,943 square feet (25.4%) Impervious Cover: 202,119 square feet (74.6%) Original Site Plan Council Concerns-White Chapel Access from White Chapel Blvd. is problematic. Need to address White Chapel frontage better since local traffic will be off this roadway. Council Concerns-Articulation 3. Evaluate articulation variance on the west side of Building A. Original Building Elevations Horizontal Articulation Max. allowed = 69 ft, 3.5’ offset Provided = 142 ft Vertical Articulation Max. allowed = 69 ft, 3.5’ offset Provided = 165 ft Horizontal Articulation Max. allowed = 69 ft, 3.5’ offset Provided = 142 ft Revised Building Elevations Council Concerns-Restaurant 4. Drive-through restaurant not acceptable on the site. -Increased building area by 2,100 sq.ft. -Eliminated Drive-through Council Concerns-Design Scale, design, a mix of uses are not appropriate given the location on a key site on SH 114. Treat the SH 114 frontage with better landscaping and bufferyard treatments; limit parking along the access road. Create a unique design with some features and identity. Limit glass façade. Council Concerns Tree Preservation and Replacement 2” caliper trees Evaluate the signage Underground utilities Proposed Sign Concepts Driveway Spacing SH 114, White Chapel Driveway Stacking Countryside Ct. Proposed Site Plan QUESTIONS Proposed Site Plan Driveway Spacing: Req’d = 200 ft to intersection Prov. = 152 ft Driveway Spacing: Req’d = 200 ft to intersection Prov. = 150 ft Driveway Stacking: Req’d = 100 ft Prov. = 36 ft Driveway Stacking: Req’d = 100 ft Prov. = ±97 ft Driveway Stacking: Req’d = 100 ft Prov. = 30 ft Building Height Analysis Existing Church Proposed Shopping Center View of site from the end of Countryside Court, looking northeast Building Elevations Building Elevations Building Elevations Building Elevations Color Building Elevations Tree Conservation Plan Landscape Plan The following slides are revisions submitted since the first reading was tabled on May 15, 2007 Questions? Questions? Item 7A ZA07-005 P&Z ACTION: Approved (4-1) subject to Site Plan Review Summary No. 4, dated April 27, 2007; and subject to the following modifications: Granting variances to driveway stacking (comment 2a) and driveway spacing (comment 2b) allowing the right-in right-out driveway on N. White Chapel with the condition that they work with staff to insure that the design restricts any left-out movement and extending the median south of the White Chapel Driveway; Requiring brick pilasters and wainscot along the west façade of Building A; Eliminating the “C-3” uses as specified in the applicant’s letter dated April 25, 2007 and more specifically as follows: (2) Auditoriums, theaters and cinemas (5) Commercial amusement centers and bowling alleys where the activity is for indoor operations and activities only, including indoor driving ranges and indoor miniature golf courses. (7) Conventional golf courses, including outdoor driving ranges accessory thereto, but excluding outdoor miniature golf courses. Item 7A ZA07-005 (16) Lodges, sororities and/or fraternities (17) Medical care facilities to include nursing and care homes, hospitals with their related facilities and supportive retail and personal service uses operated by or under the control of the hospital primarily for the convenience of patients, staff and visitors. (18) Mortuaries, funeral homes and undertakers. (20) Nursery buildings for the retail sale of plants and accessory items where the sales operations are conducted entirely within an enclosed structure. Outdoor storage or sale shall be permitted with this use to the extent that the outdoor sales area is completely enclosed by a fence, wall or screening device. (26) Skating rinks, ice and roller (indoor only). (27) Taverns, clubs, and other comparable establishments under which the on-premises consumption of alcoholic beverages is permitted subject to issuance of a special use permit as required in Section 45 of this ordinance. The mere reference to this provision within the zoning ordinance does not indicate or imply that the sale or consumption of alcoholic beverages has been or will be permitted under the alcoholic beverage laws of the State of Texas. It is only intended to define a location for this type of use if its existence should be permitted by state law. And removing the request for gasoline sales and hotels as permitted uses. Questions? Public Works Presentation Utility Plan Drainage Plan Retention Pond Detention Pond Synthetic stucco application Step 1 Step 2 Step 3 Step 4 Step 5 Concrete stucco application Questions? Item 7B ZA07-054 OWNER: Shafer Plaza XXV Ltd. APPLICANT: Artis L.P. REQUEST: Approval of first reading for a zoning change and site plan to amend the current “S-P-2” Generalized Site Plan District zoning. The purpose of this request is to add a roof and fire place to the existing patio and outdoor seating area on the north side of the building adjacent to E. Southlake Boulevard. LOCATION: The property is located at 2707 E. Southlake Boulevard. Southlake Blvd S. Nolen Ave Georgetown Park View looking southwest toward property Southlake Blvd S. Nolen Ave ZA07-054 The property will conform to the existing “S-P-2” zoning district uses and development regulations (Ordinance No. 480-386, as amended) except as follows: 1) The building setback along E. Southlake Boulevard for Building “B” shall be 34 feet as shown on the site plan; 2) Up to a 10% reduction in required parking shall be permitted (to allow tenant flexibility for the shopping center); 3) Sidewalks and trails are not required with this site plan revision. Revised Site Plan Revised Site Plan Building Elevations Color Rendering Item 7B ZA07-054 P&Z ACTION: July 5, 2007; Approved (5-0) subject to staff report and review; denying variance request to exclude sidewalks; granting parking and setback variance requests. Questions? Items 9A & 9B ZA07-029 & ZA07-033 OWNER/ APPLICANT: Riordan Capital Properties REQUEST: Approval of a preliminary plat and plat revision for Autumn Creek proposing to subdivide three (3) lots into a total of seven (7) lots and providing a street and extension of water and sanitary sewer utilities to the proposed lots. LOCATION: The property is located at 321, 331, and 333 W. Highland Street. W. Highland St N. White Chapel Blvd Carroll High School W. Highland St View looking north toward property W. Highland St View looking south toward property Filed Plat ZA07-029 & ZA07-033 Overall Site Data Gross Acreage: 8.67 acres Net Acreage: 7.82 acres Area of R.O.W.: 0.85 acres Number of Lots: 7 lots Gross Density: 0.81 du/acre Net Density: 0.90 du/acre Avg. Lot Size: 1.12 acres (48,663 sq. ft.) Preliminary Plat / Plat Revision Pedestrian Access Plan Tree Conservation Plan Item 9A & 9B ZA07-029 and ZA07-033 P&Z ACTION: July 5, 2007; Approved ZA07-029 (5-0) subject to review and Approved ZA07-033 (5-0) subject to review. Questions? Public Works Presentation Utility Plan Drainage Plan Proposed Detention Areas Questions? Item 9C SP07-182 APPLICANT: Shafer Plaza XXV, Ltd. LOCATION: 2707, 2717, & 2729 E. Southlake Blvd.; Cornerstone Plaza REQUEST: Variance from the Sign Ordinance 704-C regulations for monument signs. The applicant has revised the request based on City Council recommendations made at the June 19, 2007 City Council meeting: Revised Request – Summary of Variances Existing sign to be replaced Site Plan Shoe Pavilion Monument sign granted set back variance in Dec. 2002 Second sign no longer proposed Previously Proposed (Existing) Sign New Proposed Sign Wyndham Plaza Sign SP07-182 QUESTIONS?