Loading...
Item 9B Item 9B: Consider bids for Bob Jones Nature Center Improvements June 2006, City Council approved the conceptual design for the Bob Jones Nature Center Base bid items Structure modifications Site improvements Alternate Items Pavilion* Patio fireplace Overflow parking Additional trails Architects Estimate ($667,000 including overhead and contingency) $552,000 in available funding (* Anticipate including as part of base bid in upcoming process due to need for outdoor learning space) Project recently bid with two bids received: SPSD $ 866,978 $ 993,546 with alternates Fain $1,065,725 $1,162,368 with alternates Staff working with Schrickel, Rollins and Associates to identify discrepancies between the bid and cost estimates exploring opportunities to fine tune the documents without foregoing integrity of the project Consultant and staff met with the low-bid contractor to evaluate bid in more detail determine difference between cost estimates and actual bid. Intent: thorough examination of bid documents and bid pricing re-bid project to obtain best pricing available (June) knowledge that market driven pricing may exceed original estimates. Parks Board recommended rejecting the bids (5-0-2) at their April meeting SPDC considered at their May 1, 2007 meeting Staff met with the Bob Jones Nature Center Board (4/18): Update on status of the project current steps being taken to further review and analyze bid documents Preserve the integrity of the project Staff is available for questions and seeks Council direction