Loading...
Item 6AOrdinance No. 898-A Item 6A April 3, 2007 Utility Fund Temporary labor $ 3,000 Water line maintenance $50,000 Total $53,000 General Fund Temporary labor $ 3,000 Earnings $12,000 Engineering $50,000 Community Service $ 9,000 Equipment $ 8,500 Earnings $ 5,000 Total $87,500 Transfer In-Stormwater $20,157 Special Revenue Funds Court Technology Fund Equipment $45,000 Park Dedication Fund Professional Service $16,000 Stormwater Drainage Fund Revenue Stormwater-residential $579,500 Stormwater-commercial $304,000 Interest $ 20,000 Total $903,500 Stormwater Drainage Fund Expenditures Personnel $ 82,745 Operational $240,549 Capital $226,000 Transfer out $225,375 Total $774,669 Vehicle Replacement F-450 Flatbed $17,838 QUESTIONS? Projects Completed To Date by PW Operation’s Crews Dove Creek @ E. Dove Blvd. BEFORE Projects Completed To Date by PW Operation’s Crews Dove Creek @ E. Dove Blvd. AFTER Project Identification Citizen Web Survey Work Order System Primary Creek Modeling Critical Structures Review Each project ranked for Damage Risk and Cost to Mitigate Are homes likely to flood? Are streets flooded by more than 6” of water? Does this problem cause severe erosion? What is the cost to fix the problem? How Were Projects Ranked? Project Categories Localized Drainage Projects Improve a small area of 2 or 3 blocks Secondary Drainage Projects Improve a small tributary that drains into one of the major Creeks Primary Drainage Projects Improve one of the major Creeks Project #1 - 1900 Blk. E. Dove Rd. East of Creekside Dr. Solution: Re-grade existing ditch, Stabilize edge of roadbed with cement treated base (CTB), jet pipe and clean out-fall ditch ~ 100 L.F. Project #2 - 1200/1201 Meadow Ridge Ct. Channel (Southlake Hills) Solution: Re-grade and construct approx 500 L.F. of 6’ pilot channel. Project #3 - 3000 T. W. King Channel Solution: Construct concrete conveyance structure along west roadway ditch approx 650 L.F. This is a major water route from Trophy Club Project #4 - 2800 Blk. N. White Chapel Blvd. Channel (near Kirkwood Hollow) Solution: Re-grade 600’ of ditch and construct berm from spoil materials. Project #5 - N. Peytonville Avenue Channel (West of Southridge Lakes Pkwy.) Solution: Clear debris in in-fall & out-fall. Project #6 - 1101 Quail Run Rd. Storm Drain (Quail Creek Estates) Solution: Re-construct drainage structure. Evaluate roadway safety conditions Project #7 - 1015 Quail Run Rd. Channel (Quail Creek Estates) Solution: Remove culvert, sawcut and remove section of a wing wall, re-grade ditch, construct a small headwall/wingwall at a intersecting 12-inch pipe to control erosion. Questions?