Loading...
WS Item 3Council Workshop March 6, 2007 Topic: Discuss Upcoming Stormwater Utility Projects Public Works Supervisors Kyle Flanagan – Water Joined City of Southlake – Dec 1998 Maintenance Worker Promoted to Equipment Operator – Dec 1999 Interim Supervisor – Jun 2005 Promoted to PW Supervisor – Jan 2007 Public Works Supervisors Jack Thompson – Wastewater Holds numerous TCEQ licenses Right-of-Way Inspector -2000-02 Utility Supervisor – 2002 – 2007 Joined Southlake - Feb 2007 Public Works Supervisors Joe Walsh – Streets/Drainage Joined City of Southlake – Jan 2007 1987 – 96, Construction/Maintenance Supv, Tarrant County Precinct #3 1997- 2000, Iowa Bridge & Culvert 1999 – 2007, City of Grapevine Construction Foreman Projects Completed To Date by PW Operation’s Crews Dove Creek @ E. Dove Blvd. BEFORE Projects Completed To Date by PW Operation’s Crews Dove Creek @ E. Dove Blvd. AFTER Project Identification Citizen Web Survey Work Order System Primary Creek Modeling Critical Structures Review Each project ranked for Damage Risk and Cost to Mitigate Are homes likely to flood? Are streets flooded by more than 6” of water? Does this problem cause severe erosion? What is the cost to fix the problem? How Were Projects Ranked? Project Categories Localized Drainage Projects Improve a small area of 2 or 3 blocks Secondary Drainage Projects Improve a small tributary that drains into one of the major Creeks Primary Drainage Projects Improve one of the major Creeks Project #1 - 1900 Blk. E. Dove Rd. East of Creekside Dr. Solution: Re-grade existing ditch, Stabilize edge of roadbed with cement treated base (CTB), jet pipe and clean out-fall ditch ~ 100 L.F. Project #2 - 1200/1201 Meadow Ridge Ct. Channel (Southlake Hills) Solution: Re-grade and construct approx 500 L.F. of 6’ pilot channel. Project #3 - 3000 T. W. King Channel Solution: Construct concrete conveyance structure along west roadway ditch approx 650 L.F. This is a major water route from Trophy Club Project #4 - 2800 Blk. N. White Chapel Blvd. Channel (near Kirkwood Hollow) Solution: Re-grade 600’ of ditch and construct berm from spoil materials. Project #5 - N. Peytonville Avenue Channel (West of Southridge Lakes Pkwy.) Solution: Clear debris in in-fall & out-fall. Project #6 - 1101 Quail Run Rd. Storm Drain (Quail Creek Estates) Solution: Re-construct drainage structure. Evaluate roadway safety conditions Project #7 - 1015 Quail Run Rd. Channel (Quail Creek Estates) Solution: Remove culvert, sawcut and remove section of a wing wall, re-grade ditch, construct a small headwall/wingwall at a intersecting 12-inch pipe to control erosion. FY06-07 Project Schedule FY07-08 Project Schedule Questions?