Loading...
Item 4B Item 4B: Reject all bids for the Noble Oaks Pond Improvements project Design previously approved by City Council, as recommended by Parks Board and SPDC Proposed improvements to include: water well Pond excavation, re-shaping, and erosion control spillway and storm drain improvements Domestic water line and electrical upgrades Also recommended as bid alternate items: installation of a gazebo landscape improvements Original cost estimates provided by the project engineer for the base bid items – approx $100,000. Project bids opened December 19, 2007: Fryer Construction Co. $251,000.00 Quality Excavation, LTD. $271,858.50 Both bids far exceeded the available funds for the project ($100,000). Review of bids indicate the increase is a result of the proposed well and pump (average of 73% of base bids). As a matter of procedure, recommend all bids be rejected. Next Steps: Staff working with engineer to restructure the bid documents Separate or remove well from the pond improvements. The timing for drilling a water well is not favorable given the recent drought conditions and tremendous gas exploration within the Barnett Shale. Explore domestic tap. Re-bid in upcoming weeks move forward with improvements. Parks and Recreation Board recommended rejection of all bids at January 8, 2007 meeting (8-0). Staff is available for questions and seeks Council consideration.