Loading...
Item 7AItem 7A – ZA07-135 Owner: Northeast Baptist Church Applicant: Blake Architects Request: First-reading approval of a Zoning Change and Site Plan from “AG” Agricultural District and “SF-1A” Single-Family Residential District to “CS” Community Service District for the construction of a new church addition of 14,760 square feet. Location: 1000 Davis Blvd & 2785 Union Church Rd; near the northwest corner of Davis Boulevard and Union Church Road. Michael Drive Davis Blvd (FM1938) Union Church Rd Siena III SITE PLAN SITE PLAN Trail Segment 30-S: Davis Greenway Pathway An 8’ paved (or natural) pathway through floodplain area to the rear of large tracts which front the west side of Davis Blvd. Union Church Rd Looking West Union Church Rd Looking East Union Church Rd looking North onto Church Property West of Creek Union Church Rd looking North onto Siena Open Space Lot Looking South on Siena Open Space Lot Possible Alternate Trail Locations Proposed Trail Location VARIANCES REQUESTED – SITE PLAN Trail Installation in P.A.E. Provided Sidewalk Completion VARIANCES REQUESTED – SITE PLAN Davis Blvd Bufferyard Required: 15’ Type ‘R’ Provided: 7.5’ Type ‘R’ Horizontal Articulation North Elevation: Max Length Permitted: 51 ft. Length provided: 139 ft. West Elevation: Max Length Permitted: 51 ft. Length provided: 100 ft. Davis Blvd looking North NORTH/SOUTH ELEVATIONS VARIANCES REQUESTED -- NORTH/SOUTH ELEVATIONS Vertical Articulation Max Length Permitted: 51 ft Length Provided: 72 ft Church Spire Height Waiver Limit: 50’ Requested: 64’ * Existing building represents a legal non-conforming situation Existing Church Building to Remain LANDSCAPE PLAN LANDSCAPE PLAN LEGEND Existing Trees 4” Lacebark Elm 4” Shumard Oak 4” Chinese Pistache 4” Burr Oak Crape Myrtle Wax Myrtle Cluster * Not inclusive of all shrubs proposed TREE CONSERVATION PLAN Site Data Summary Variance Request Summary Planning & Zoning Commission Action May 8, 2008; Approved (5-0) subject to the following: Site Plan Review Summary No. 4, dated May 2, 2008; Granting the requested 10% parking variance; Granting the requested variance to the Bufferyard along Davis Blvd; Granting the requested variances to horizontal and vertical articulation; Denying the requested variance to the full installation of Trail Segment 29 along Union Church Blvd; Providing the applicant the opportunity to complete the installation of Trail Segment 30-S though the floodplain within 2 years of approval; and Granting a waiver to the 50-foot maximum height limitation for architectural elements, noting that the church spire is proposed at 64-feet. CONCEPT PLAN ELEVATION RENDERING SITE PLAN PLAT REVISION Questions? Public Works PRELIMINARY UTILITY PLAN PRELIMINARY DRAINAGE PLAN PRELIMINARY GRADING PLAN Looking North at Primrose School Driveway Stub to Church Looking West at Primrose School Driveway Stub to Church Looking East toward Davis Blvd at North Property Line of Church Looking North at Proposed Church Parking Lot Looking North at Site from Union Church Rd Looking South toward Union Church Rd at Proposed Church Parking Lot