Loading...
Item 4HItem 4H Amendment to the Urban Design Study Scope of Services contract with Townscape Planning, Inc. Amendment to the Urban Design Study Scope Urban design concepts for F.M. 1938 extension (north of F.M. 1709) Design concepts for proposed roundabouts Traffic modeling to evaluate turning movements and pedestrian crossing options at Southlake Town Square / Shops of Southlake Cost of Amendment $5,806 for 1938 Urban Design and roundabout concepts $3,924 for traffic modeling of turning movements and at-grade pedestrian crossing options Total = $9,730 Questions/Comments?