Loading...
Item 4BItem 4B Approve a professional service agreement for the design of FM1938 Phase 2 with TranSystems Corporation in the amount of $1,498,107.13 Location Map – FM1938 Project FM1938 – Phase 1 FM1938 - Phase 2 Approve PSA with TranSystems Corporation for FM1938 Phase 2 Background: FM1938 is a joint project between the City of Southlake, Keller, the Town of Westlake, Tarrant County, TxDOT and the Regional Transportation Council (NCTCOG – RTC) Approve PSA with TranSystems Corporation for FM1938 Phase 2 Background: The Cities and Tarrant County are responsible for providing engineering design services and right-of-way to TxDOT for the FM1938 project Approve PSA with TranSystems Corporation for FM1938 Phase 2 Background: Construction of FM1938 Phase 1 is anticipated to begin in Spring 2010 for the section of roadway within the Town of Westlake Phase 1 will be a 6 lane roadway at SH114 and will transition to a 4 lane roadway south of Dove Road in Westlake Approve PSA with TranSystems Corporation for FM1938 Phase 2 Background: FM1938 Phase 2 will continue as a 4 lane roadway from the Randol Mill bend and will transition to a 6 lane roadway at Johnson Road FM1938 Phase 2 will also include improvements to the intersection at Southlake Blvd. (FM1709) Approve PSA with TranSystems Corporation for FM1938 Phase 2 Design services to be provided include: Pavement design Drainage design with detention facility Structural retaining wall design, as needed Right-of-way documents and staking for acquisition by Tarrant County Preliminary conceptual landscape design for the FM1938 medians Approve PSA with TranSystems Corporation for FM1938 Phase 2 FM1938 Phase 2 Schedule Completion of design - Fall 2011 Anticipated construction - 2012 Approve PSA with TranSystems Corporation for FM1938 Phase 2 Project Funding Construction funding is programmed in the approved FY2010 and proposed FY2011 CIP Budgets Approve PSA with TranSystems Corporation for FM1938 Phase 2 FM1938 Design Southlake has expended approximately $235,171.00 towards the design of FM1938 Phase 1 Tarrant County, through the efforts of Precinct III Commissioner Gary Fickes, has committed funding toward the FM1938 roadway expansion project Approve PSA with TranSystems Corporation for FM1938 Phase 2 FM1938 Phase 2 Construction Anticipated construction cost projection is $20,928,948 Engineering fee is approximately 7.2% of the construction cost The fee for design includes both Basic Services and Special Services Approve PSA with TranSystems Corporation for FM1938 Phase 2 Funding for FM1938 Engineering Design Engineering design is included in the General Fund CIP - successive CIP budgets from 2001 to present Southlake’s net obligation under this contract – approx. $790,000 with participation by Tarrant County and the City of Keller Recommendation Approve a professional service agreement for the design of FM1938 Phase 2 with TranSystems Corporation in the amount of $1,498,107.13 Questions? Bob Price (817) 748-8097