Loading...
Item 6B Department of Planning & Development Services S T A F F R E P O R T July 30, 2008 ZA08-048 CASE NO: Site Plan for 600 Zena Rucker Road PROJECT: REQUEST: On behalf of Cary Clarke Homes, Pogue Engineering & Development Co., Inc. is requesting approval of a site plan for a two story general and medical office building at 600 Zena Rucker Road. The site is approximately 1.02 acres and the proposed building is approximately 14,282 square feet in total floor area. The existing zoning is R-PUD Residential Planned Unit Development. The following variances are being requested:  Driveway Stacking Depth – The required minimum stacking depth is 50 feet. The applicant is requesting a stacking depth of 25.5 feet.  Required Parking – The applicant is requesting a 10% reduction in required parking. 1. Conduct public hearing ACTION NEEDED: 2. Consider site plan approval ATTACHMENTS: (A) Background Information (B) Vicinity Map (C) Plans and Support Information (D) Variance Exhibit (E) Site Plan Review Summary No. 3, dated July 29, 2008 (F) Surrounding Property Owners Map (G) Surrounding Property Owners Responses for Commission and Council Members Only (H) Full Size Plans () STAFF CONTACT: Ken Baker (748-8067) Richard Schell (748-8602) Case No. ZA08-048 BACKGROUND INFORMATION OWNER: Cary Clarke Homes APPLICANT: Pogue Engineering & Development Co., Inc. PROPERTY SITUATION: 600 Zena Rucker Road LEGAL DESCRIPTION: Lot 3R1, Block 60, Timarron Addition LAND USE CATEGORY: Retail Commercial CURRENT ZONING: R-PUD Residential Planned Unit Development District HISTORY: -A development plan for Timarron, Phase V was approved by City Council on May 7, 1996. -A final plat (ZA96-141) was filed August 5, 1997. -A plat revision (ZA98-005) was filed July 28, 1998. TRANSPORTATION ASSESSMENT: The Master Thoroughfare Plan recommends that Zena Rucker Road have 60’ of right-of-way for a two-lane collector. Adequate right-of-way exists for this road. May, 2007 traffic counts on Byron Nelson Parkway (between Southlake Blvd. (F.M. 1709) and Continental Blvd.) North Bound South Bound 24hr 2044 2253 A.M Peak 56176 (1) 11:00 – 12:00 () 11:15 – 12:15 P.M. Peak 202213 () 5:45 – 6:45 () 4:00 – 5:00 Traffic Impact Use Sq. Ft. Vtpd* AM-IN AM-OUT PM-IN PM-OUT General Office 9,712 107 13 2 3 12 Building Medical Office 4,570 165 11 6 8 12 Building Total 14,282 272 24 8 11 24 *Vehicle Trips Per Day PATHWAYS MASTER PLAN: A 5 foot sidewalk is required on the north side of Zena Rucker Road, which the applicant is providing. In addition, the applicant is proposing to extend the required sidewalk across the neighboring property to the west (Lot 3R2, Block 60, Timarron Addition Phase 5) to connect to the existing sidewalk on the east side of Byron Nelson Parkway. Although the Southlake Pathways Plan requires an 8 foot multi-use trail along Zena Rucker Road, this trail already exists on the south side of the roadway. WATER & SEWER: There is an 8-inch diameter public water line located on the north side of Zena Case No. Attachment A ZA08-048 Page 1 Rucker Road to serve this development. There is an 8-inch diameter public sanitary sewer line located along the east property line to serve this development. DRAINAGE ANALYSIS: The drainage from this development is generally to the southeast corner of the property where a proposed curb inlet connects to the existing storm sewer system that serves this development. TREE PRESERVATION: There are no trees on the property. P&Z ACTION: July 17, 2008; Approved (4-0) subject to Review Summary No. 2, dated July 10, 2008; ability to get parking agreement for nine (9) parking spaces at 601 Zena Rucker Rd, Lot 2R1, Block 60, Timarron Addition; and, granting the requested variances to driveway stacking and required parking. STAFF COMMENTS: Attached is Site Plan Review Summary No. 3, dated July 29, 2008. N:\Community Development\MEMO\2008cases\048 - SP - 600 Zena Rucker Rd\Staff Report\08-048SP.P&Z 07-17.doc Case No. Attachment A ZA08-048 Page 2 Case No. Attachment B ZA08-048 Page 1 Plans and support information Case No. Attachment C ZA08-048 Page 1 Site Plan Case No. Attachment C ZA08-048 Page 2 Variance Exhibit Case No. Attachment D ZA08-048 Page 1 SITE PLAN REVIEW SUMMARY ZA08-048Three07/29/08 Case No.: Review No.: Date of Review: Site Plan Project Name: -600 Zena Rucker Road APPLICANT/ENGINEER: OWNER: Cary Clarke Homes Pogue Engineering & Development Arlyn W. Samuelson, P.E Cary Clarke 1515 Heritage Drive Suite 105 204 N. Dooley McKinney, TX 75069 Grapevine, TX 76051 Phone: (214) 544-8880 Phone: (817) 410-8400 Fax: (214) 544-8882 Fax: (817) 410-8401 E-mail: asamuelson@pogueengineering.com CITY STAFF HAS REVIEWED THE ABOVE REFERENCED PROJECT RECEIVED BY THE CITY ON 06/30/08 AND WE OFFER THE FOLLOWING STIPULATIONS. THESE STIPULATIONS ARE HEREBY MADE CONDITIONS OF SITE PLAN APPROVAL UNLESS SPECIFICALLY AMENDED BY THE CITY COUNCIL. IF YOU HAVE ANY QUESTIONS OR NEED FURTHER CLARIFICATION, PLEASE CONTACT RICHARD SCHELL AT (817) 748-8602. 1. Add “Tarrant County” after “Southlake” and before “TX” in the title block. 2. Please change the land use map designation ("L.U.D.=_____") on Lot 2R1, Block 60 to “ Retail Commercial” (See Southlake 2025 Plan - Future Land Use Plan). 3. Driveways do not meet the minimum required stacking depth of 50’. The stacking provided is 25.5’. A variance request letter for the stacking depth has been submitted. 4. Provide fire lanes in compliance with the City Fire Code. Show and label the fire lane width and The fire lanes are any curve radii. Also label any radius of any curbs adjacent to the fire lane. existing. The curve radius of the fire lane adjacent to the dumpster appears to meet the 30’ minimum radius regulation. 5. All lighting must comply with the Lighting Ordinance No. 693, as amended with regard to type of lighting, intensity, glare and spill-over. Please provide a copy of the shared parking agreement. 6. The Revised Development Plan (ZA04-063) approved by City council on January 4, 2005 shows that parking requirements for Lots 2 and 3 (before a plat revision), now lot 2R1, were based on Retail Commercial uses (one space for every 200 square feet of floor area). Calculating the parking requirements based on General Office uses (one space for every 300 square feet of floor area) would provide the necessary surplus in parking, however, please be aware that future uses on lots 2R1 and 3R1would be A variance request letter has limited by the reduced parking provided for both lots combined. been submitted for the 10% reduction in parking. Case No. Attachment E ZA08-048 Page 1 Tree Conservation/Landscape Review Keith Martin Landscape Administrator (817) 748-8229 TREE CONSERVATION COMMENTS: * There are no existing trees on the property. PARKING LOT LANDSCAPE: * No comments. LANDSCAPE PLAN: * No comments # Denotes required items. * Denotes informational items. Case No. Attachment E ZA08-048 Page 2 Community Service/Parks Department Review Peter Kao 817-748-8607 Park Board comments or recommendations: All applicants are required to appear before the Park Board to discuss park dedication issues if requesting fee credits. Please contact the Community Services Department at (817) 748-8607 for further details. Land/park dedication requirements: The client Requires park dedication fees in the amount of $2400 per gross acre x 1.02 acres = $2448.00. has been notified of the fees. Pathway Comments: None Other informational comments? None Case No. Attachment E ZA08-048 Page 3 Public Works Review Comments Cheryl Taylor (817) 748-8100 ctaylor@ci.southlake.tx.us GENERAL COMMENTS: 1. The curb return radii for proposed drives shall be 30’ minimum. All fire lane radii must be 30’ minimum. * Sight distances will be required to conform to AASHTO guidelines on adjacent collectors and arterials. * Use the City of Southlake GPS monuments whenever possible. WATER AND SANITARY SEWER COMMENTS: * There is an 8-inch diameter public water line located on the north side of Zena Rucker Road to serve this development. * There is an 8-inch diameter public sanitary sewer line located along the east property line to serve this development. * Water meters must be located in an easement or right-of-way. DRAINAGE COMMENTS: 1. Detention may be required with any new proposed building construction. Describe how increased runoff from site is being detained. If detention is not being proposed, documentation supporting and certifying that detention is not necessary will be required prior to approval of construction plans and issuance of the building permit. * The drainage from this development is generally to the southeast corner of the property where a proposed curb inlet connects to the existing storm sewer system that serves this development. * The discharge of post development runoff must have no adverse impact on downstream properties and meet the provisions of Ordinance # 605. INFORMATIONAL COMMENTS: * Submit civil construction plans for the public storm sewer proposed with this development (22” X 34” full size sheets) and a completed Construction Plan Checklist directly to the Public Works Administration Department for review. The plans shall conform to the most recent construction plan checklist, standard details and general notes which are located on the City’s website. * A ROW permit shall be obtained from the Public Works Operations Department (817) 748-8082 to connect to the City’s sewer, water or storm sewer system. * A Developer’s Agreement may be required for this development and may need to be approved by the City Council prior to any construction of public infrastructure. Construction plans for these improvements must be acceptable to Public Works prior to placing the Developer’s Agreement on the City Council agenda for consideration. * Any hazardous waste being discharged must be pretreated Ordinance No. 836. * This review is preliminary. Additional requirements may be necessary with the review of construction plans. Case No. Attachment E ZA08-048 Page 4 Informational Comments: * The Development Review Committee (DRC) has determined this pre-submittal is sufficient for formal submittal to the Planning and Zoning Commission subject to completing the changes noted above . The applicant should be aware that a formal submittal for the next scheduled Planning and 27 must be received at the City by 5:00 p.m. on 6/30/08. Zoning Commission meeting A total of 11" X 17" revised copies of each plan folded to 6" X 9" and a single reduction of each plan must be submitted. If not received before the deadline, the item will be moved to a later P&Z agenda. If any significant changes, other than those noted above are made to the submittal, the plan could be withheld from processing until a later meeting or remanded back to the Development Review Committee for review. * No review of proposed signs is intended with this site plan. A separate building permit is required prior to construction of any signs. * All mechanical equipment must be screened of view right-of-ways and residential properties in accordance with the Zoning Ordinance No. 480, as amended. * All lighting must comply with the Lighting Ordinance No. 693, as amended. * All development must comply with the Drainage Ordinance No. 605, as amended. * The applicant should be aware that prior to issuance of a building permit a Plat must be processed and filed in the County Plat Records, a fully corrected site plan, landscape plan, irrigation plan, and building plans, must be submitted for approval and all required fees must be paid. This may include but not be limited to the following fees: Park Fee, Perimeter Street Fee, Water & Sewer Impact and Tap Fees, and related Permit Fees. * Denotes Informational Comment Case No. Attachment E ZA08-048 Page 5 Surrounding Property Owners 600 Zena Rucker Road SPO # Owner Zoning Land Use Acreage 1. Pecan Creek Shop Cntr Dallas SP1 Retail Commercial/Office Commercial 1.84 2. 100-Year Flood Plain/Retail Hcp Crs2 Ltach-Baylor Southlak SP1 Commercial/Office Commercial 4.52 3. Rcck Enterprises Llc O1 Office Commercial 0.91 4. 100-Year Flood Plain/Retail Commercial/Office Pecan Creek Southlake Prts Lp O1 Commercial/Public/Semi-Public 2.30 5. 100-Year Flood Plain/Retail Commercial/Office Southlake, City Of CS Commercial/Public/Semi-Public 12.26 6. 100-Year Flood Plain/Retail Commercial/Office Commercial/Public/Semi-Public/Medium Carroll ISD RPUD Density Residential 15.83 7. Pecan Creek Southlake Prtns Lp RPUD Retail Commercial/Public/Semi-Public 1.07 8. Pecan Creek Southlake Prtns Lp RPUD Retail Commercial/Office Commercial 0.99 9. Venus Drews Partners V Lp RPUD Retail Commercial/Office Commercial 3.67 10. Venus ( Drews ) Partners V Lp RPUD Retail Commercial 1.05 Case No. Attachment F ZA08-048 Page 1 Surrounding Property Owner Responses 600 Zena Rucker Road Notices Sent: Ten (10) Responses Received: None (0) Case No. Attachment G ZA08-048 Page 1