Loading...
Item 9BITEM 9B Authorize a Commercial Developer Agreement with Keller Watermere, L.P., for South Village at Watermere, located south of West Southlake Boulevard between Pearson Road and Davis Boulevard South Village at Watermere Site Location South Village at Watermere Council Consideration required: Request for Public Participation Watermere Drive -- $49,713 Off-Site Drainage -- $59,306 Park Dedication and Improvements South Village at Watermere Residential Retirement Community Standard Commercial Developer Agreement as previously approved by City Council South Village at Watermere Proposed Public Infrastructure includes: 1,300 LF of Public Paving 6,000 LF of Public Water Line 3,500 LF of Public Sanitary Sewer Line 2,000 LF of Public Storm Sewer South Village at Watermere Proposed Utility Plan 1,300 LF PUBLIC PAVING 6,000 LF PUBLIC WATER LINE 3,500 LF PUBLIC SANITARY SEWER 2,000 LF PUBLIC STORM SEWER South Village at Watermere Developer requests Paving Participation: Proposed Watermere Drive - C2U 60’ R.O.W. – 37’ B-B Development requires 31’ street $ 49,713 - Difference between 37’ street and 31’ street South Village at Watermere Developer requests Off-site Drainage Participation: – 2 - 6x3 and 1- 5x3 Box Culverts Under Union Church Road The developer is requesting that the City participate in the engineering, construction and surveying of off-site drainage improvements by reimbursing the developer to the extent of 29.5% of actual costs not to exceed $59,306.00. South Village at Watermere Park Issues Park Dedication Fees $90,000 Park Dedication 6 Acres of Private Open Space South Village at Watermere Park Issues Developer will construct 8’ paved pathway on the east side of Watermere Drive 1.25 miles of 5’ paved trails on the west side of Watermere Drive connecting the public parkland at Southlake Boulevard to Union Church Road 6’ paved sidewalk along Union Church Road South Village at Watermere Park Issues Phase 2 Park Improvements 2 Lighted Tennis Courts Fishing Pier Outdoor Neighborhood Pool Horseshoe Pit Pavilion Phase 2 Park improvements will be completed within one year of final acceptance South Village at Watermere Recommendation: Approve Developers Agreement for South Village at Watermere Delete playground requirement Grant Park Board authority to redetermine amount of Park Dedication fee Questions? Bob Price (817) 748-8097