Item 6A (2)
Southlake, Texas
City Council Meeting
November 18,2008
1. Reduced the residential units to approximately 404.
2. Restructured the office layout to more effectively hide the parking from 114.
3. Realigned Kirkwood Boulevard on the south end of Carillon to accommodate the neighboring properties to the southeast.
4. Increased the buffer and landscaping along Primrose Lane and Carroll Avenue.
5. Realigned the entrance off Carroll to align between properties on the opposite side of Carroll.
6. Increased in the size of the lots facing the Lake Park
7. Added a winding trail among berms in front of the commercial district along 114.
8. Increased in the amount of regional detention planned for the site.
9. Decreased the number of attached homes in the Village District.
10. Removed the smaller 40-foot villa lots in the Village District.
11. Changed the configuration of the retail along White Chapel and provided additional renderings.
12. Expanded the Gateway monument signage and surrounding green space at the corner of White Chapel and 114.
13. Reconfigured the retail garages to provide better pedestrian traffic flow.
14. Moved the location of the public parking in the Lake Park away from Jim Boudreaux’s house.
15. Added more green areas to the office parking along 114.
16. Moved the retail building off the corner of White Chapel and Kirkwood and expanded the entry area.
17. Restricted access to the property from construction traffic to Carillon by requiring entry from 114 and White Chapel only.
(White Chapel access was restricted to between 114 and Kirkwood).
18. Established architectural controls for the four districts and incorporated the controls into Appendix B in the Development Plan.
19. Revised the Rights-of-Way in the Village District and the Chateaux District to add depth to residential lots.
20. Added twenty feet to the depth of the Lake lots and changed the front yard setback requirement to 45 feet.
21. Added 10 feet to the Village District lots and Chateaux lots backing up to Kirkwood and expanded the back yard setbacks.
22. Changed the location of the Plaza District entry along the 114 feeder road due to TxDot requirements.
23. Agreed to set the minimum size for homes in the Village District to 2,800 s.f.
24. Added additional design renderings for the Carillon entry features and established the standard columns at each entry type.
25. Added a requirement for a Specific Use Permit in Appendix B for any grocery store within 300 feet of Kirkwood Boulevard.
26. Added Appendix B, a Land Use Category table for each district.
27. Added Appendix F, a list of plant materials for Carillon.
28. Added an open space that leads from Kirkwood Boulevard to the Amenity Center in the Village District to provide a better
view while driving down Kirkwood Boulevard.
Development Plan Changes since Original Submittal (August 19, 2008)
Retail
Development Plan – October 7, 2008
Revised Development Plan – November 18, 2008
Retail at White Chapel and 114
Retail from inside the Plaza District
Retail at North end of White Chapel
Revised R.O.W.’ – Chateaux District
Revised R.O.W. – Village District
Revised R.O.W. – Village District
Kirkwood Blvd. Measurements
Kirkwood Blvd. Tree Types
Kirkwood Blvd. Tree Types
Proposed:
Live Oak
Bur Oak
Cedar Elm
Alta Magnolia
Crape Myrtle
Existing:
Post Oaks
Residential – Village District
Maisons
Maisons
Villas
Villas
Residential Options
Option ‘A’
Option ‘B’
Development Plan -Option ‘A’–November 18, 2008
Maisons
Development Plan–Option’ B’–November 18, 2008
Villas
Villa Streetscape
Villa Streetscape
Analysis of Residential Units
Entry Features
Entry Features
Primary Entry
Opportunity for public art
Primary Entry
Secondary Entry
Tertiary Entry
EIFS Detail
EIFS Detail
Office Elevations and Renderings
Revised Development Plan – November 18, 2008
Corporate District Site Plan – Nov 18, 2008
Office Building Elevations Nov. 18, 2008
Office Building Renderings Nov. 18, 2008
Office Building Renderings Nov. 18, 2008
Retail Building Elevations Nov. 18, 2008
Garage Building Renderings Nov. 18, 2008
Retail Building Renderings Nov. 18, 2008
Retail Building Renderings Nov. 18, 2008
Office Site Plan Nov. 18, 2008
Drive Around the Corporate District
VIDEO HYPERLINK
Phasing Plan
Phasing Plan – November 18, 2008
Phasing Plan
Questions?
Revised Development Plan – November 18, 2008