Loading...
Item 4GItem 4G Approve a professional services agreement with Jacobs Engineering Group for median landscape design on Southlake Boulevard for an amount not to exceed $119,000 Chris Tribble FM 1709 Median Landscaping: Urban Design Element Background TXDOT intends to install medians along FM 1709 in 2009 Landscaping is not included in their median design or construction scope Scope Construction documents for median landscaping, irrigation, electrical and pavements treatments at Carroll, Central and Village Center for Town Center Zone medians Conceptual drawings for the Estate Residential Zone and the Commercial Zone Construction documents for irrigation and electrical sleeves for all median zones Median Character Zones Town Center Zone Estate Residential Zone Commercial Parkway Zone PSA with Jacobs Engineering Staff is currently working w/Jacobs on other Urban Design element Jacobs has the experience and resources to deliver FY 2009 CIP Funds and Strategic Funds have been allocated for median landscaping design costs in the amount of $119,000 PSA with Jacobs Engineering Recommendation: Approval of a professional services agreement with Jacobs Engineering Group for the engineering and design of the FM 1709 median landscaping for a total amount not to exceed $119,000 Questions? Chris Tribble (817) 748-8021