Item 4GItem 4GApprove a professional services agreement with Jacobs Engineering Group for median landscape design on Southlake Boulevard for an amount not to exceed $119,000
Chris Tribble
FM 1709 Median Landscaping: Urban Design Element
Background
TXDOT intends to install medians along FM 1709 in 2009
Landscaping is not included in their median design or construction scope
Scope
Construction documents for median landscaping, irrigation, electrical and pavements treatments at Carroll, Central and Village Center for Town Center Zone medians
Conceptual drawings for the Estate Residential Zone and the Commercial Zone
Construction documents for irrigation and electrical sleeves for all median zones
Median Character Zones
Town Center Zone
Estate Residential Zone
Commercial Parkway Zone
PSA with Jacobs Engineering
Staff is currently working w/Jacobs on other Urban Design element
Jacobs has the experience and resources to deliver
FY 2009 CIP Funds and Strategic Funds have been allocated for median landscaping design costs in the amount of $119,000
PSA with Jacobs Engineering
Recommendation:
Approval of a professional services agreement with Jacobs Engineering Group for the engineering and design of the FM 1709 median landscaping for a total amount not to exceed $119,000
Questions?Chris Tribble(817) 748-8021