Loading...
Item 4DFW Connector Urban Design Update January 5, 2010 Presentation Outline Brief update on the DFW Connector project (FKA as the “Funnel Project”) Recap of the Urban Design Base Line recommendations Retaining Wall Graphics Bridge Treatments Next Steps DFW Connector Urban Design Update DFW Connector Urban Design Update DFW Connector Urban Design Update DFW Connector Urban Design Update Planning Phases: Base Structure Design (concrete color, substructures, retaining walls) Base Aesthetics Package ($8 million – accents, form liners, landscaping, lighting, wall treatments) Community Enhancement (bridge towers, entry features, signage, logo, railing) DFW Connector Urban Design Update Committee Recommended Options Color & Column Type Accent Color-None DFW Connector Urban Design Update Retaining Walls - Fracture Fin (Most of the Corridor) - Ashlar Stone (Southlake Existing) Retaining Wall Option #1 Retaining Wall Option #2 Existing Bridge Retaining Wall Insert Picture December Meeting Retaining Wall Treatments Bridge Design Landscaping Wall Graphics-Grapevine Wall Graphics -DFW Wall Graphics -Southlake QUESTIONS? DFW Connector Urban Design Update DFW Connector Urban Design Update Base Structure Design - Color - Bridge Substructures - Retaining Walls Color Option #1 Color Option #2 Color Option #3 DFW Connector Urban Design Update Bridge Substructures (Columns) - Constant Radius - Constant Chamfer - Flair Column Bridge Column Option #1 Bridge Column Option #2 Stakeholders Recommendation Southlake Green: PMS 553 C=60, M=0, Y=47 , K= 76 R=24, G=61, B=32 HEX #183D20