Item 4O audio1
2
3
4
The lot to be rezoned is just north of the Washington Mutual lot.
5
6
7
8
9
10
This is the Phase I Site Plan that was approved May 11, 1999.
11
This is the Site Plan for Phase I that was approved August 2, 1999. The Phase I
building and the shaded drives and parking are what is existing today.
12
The is the Site Plan that was approved by P&Z on December 4, 2008. The 10,548
sq ft phase II building is shaded in gray and the added parking and driveways are
shown to the north. The lot to the west has been acquired for future parking to be
added as part of Phase III. It is currently zoned C3, general commercial and the
requested zoning is CS, Community Service to match the existing lot. The
driveways and parking are shown on this plan to satisfy the requirement for a
concept plan or site plan with a zoning request. The southern driveway on to
Corporate Circle created some driveway spacing issues with the existing drive for
Washington Mutual, and it has been removed from the plan. The plan is consistent
with the approved concept plan.
13
The is the revised site plan showing just one driveway on Corporate Circle and with
landscape parking islands added. Also shown is the connection to Lot 13, Block 6 to
the north as stipulated in the P&Z motion. The 8’ multi use trail is shown along
Southlake Blvd extending to the east property line and it will be added as part of this
phase.
14
These are the north and east elevations. The brick will match the existing building.
Variances to the vertical articulation requirements were approved by P&Z.
15
This is the west elevation. A variance was also approved for this elevation.
16
This is the tree conservation plan. Six Crape Myrtles will be removed north of the
existing building along with a 10” cedar elm and a 6” cedar.
17
This is the color landscape plan. The P&Z motion included a stipulation that street
trees be added along Corporate Circle. The Landscape Administrator visited the site
and recommends Live Oaks to be planted at 20’ to 25’ spacing to match the existing
trees. A review comment was added to show the trees on the landscape plan.
18
This is an enlarged view of the southern part of the landscape plan
19
This is an enlarged view of the northern part of the landscape plan.
20
21
This is a view looking northeast towards the Southridge Lakes subdivision. The
existing 8’ fence with stone columns will remain.
22
A view looking north at the drainage area
23
A view looking northwest towards Southridge Lakes subdivision
24
This is a view looking south towards the north side of the existing building where the
Phase II building will be added
25
A view looking west towards Corporate Circle at the lot just north of the church lot to
be used for parking.
26
Another view looking northeast towards the Southridge Lakes subdivision
27
A view looking north towards the location of the new parking to be added.
28
A view towards Corporate Circle of the lot to be used for parking in the future.
29
A view south towards the Washington Mutual driveway.
30
Another view looking west towards Corporate Circle. Some of the existing trees
seen here on Corporate Circle are Cedar Elms, but the Landscape Administrator
recommends Live Oaks.
31
32
33
34
35
36
37
38