Loading...
Item 4O Department of Planning & Development Services S T A F F R E P O R T December 10, 2008 ZA08-100 CASE NO: Zoning Change and Site Plan for Phase II of Southlake Boulevard Presbyterian Church PROJECT: REQUEST: On behalf of Southlake Boulevard Presbyterian Church, C.M. Architecture is requesting approval of a zoning change and site plan. The purpose of this request is to revise the currently approved concept plan and site plan and to change the zoning of a lot acquired west of the existing church from “C3” Retail Commercial District to “CS” Community Service District in order to match the zoning of the existing church. This lot is planned for future parking expansion. The driveway configuration for Lot 14, Block 6 on Corporate Circle has been revised to show the connection to the north as stipulated in the P&Z motion and the southern driveway has been removed, eliminating a spacing issue that required a variance. VARIANCES REQUESTED: 1. A variance is requested to the vertical articulation requirements in Ord. 480, Section 43.9.c.1.c. on all facades visible from a Corridor R.O.W. and/or any portion of the building within 400’ of a property zoned or designated residential. 2. A variance to Driveway Ordinance 634, Section 5.2 (d), requiring a stacking depth of 100’ is requested. Approximately thirty-eight (38) feet is provided. Consider first reading for zoning change and site plan ACTION NEEDED: ATTACHMENTS: (A) Background Information (B) Vicinity Map (C) Plans and Support Information (D) Variance Exhibit Review Summary No. 4, dated December 9, 2008 (E) (F) Surrounding Property Owners Map (G) Surrounding Property Owners Responses (H) SPIN Report Ordinance No. 480-312a (I) for Commission and Council Members Only (J) Full Size Plans () STAFF CONTACT: Ken Baker (817) 748-8067 Richard Schell (817) 748-8602 Case No. ZA08-100 BACKGROUND INFORMATION OWNER: Southlake Boulevard Presbyterian Church APPLICANT: C.M. Architecture PROPERTY SITUATION: 1452 W. Southlake Blvd. and 1470 Corporate Circle LEGAL DESCRIPTION: Lots 3 and 14, Block 6, Southridge Lakes Addition, Southlake, Tarrant County, Texas LAND USE CATEGORY: Retail Commercial and Office Commercial CURRENT ZONING: “CS” Community Service and “C3” General Commercial REQUESTED ZONING: “CS” Community Service HISTORY: -A zoning change and concept plan (ZA99-032) from “C3” General Commercial to “CS” Community Service was approved by City Council on July 6, 1999. -A plat revision (ZA99-034) for Lot 3, Block 6, Southridge Lakes Addition was approved by City Council on September 21, 1999. -A site plan (ZA99-042) for Phase I was approved by City Council on September 21, 1999. PATHWAYS MASTER PLAN: An eight (8) foot multi-use trail is programmed along the north side of W. Southlake Blvd. and it is shown on the plan. WATER & SEWER: There is an existing 8 inch diameter water line located on the west side of the existing building serve this development. There is an existing 8 inch sewer line located on the west side of this property to serve this new development. DRAINAGE ANALYSIS: The drainage from this development is generally to the northwest. TREE PRESERVATION: The only existing trees proposed to be removed are required landscape trees planted during the first phase of construction, six (6) Crape Myrtles, one (1) Cedar Elm, and one (1) Eastern Red Cedar. Two (2) existing trees that are in a parking lot median within the north parking area are proposed as borderline because the alteration of the existing parking lot may impact the critical root zone area of the trees. If the cut of the existing concrete is made on the south side of the north access drive and the access drive and curb remains in-place, the trees should not be impacted by the construction. P&Z ACTION: December 4, 2008; Approved (4-0) subject to Revised Review Summary No. 3, dated December 4, 2008; granting the requested variances to vertical articulation and driveway stacking requirements and denying the variance to driveway spacing, noting the applicant’s willingness to tie the southern driveway entrance on Corporate Circle into the existing driveway entrance on Lot 5, Block 6, to provide cross access to Lot 14, Block 6 to the north, to modify the landscape plan to include street trees matching the existing trees on Corporate Circle and noting that the impervious coverage for the entire site for all phases is not to exceed 65% as required by ordinance. Case No. Attachment A ZA08-100 Page 1 STAFF COMMENTS: The P&Z motion stipulated that the landscape ordinance be modified to include street trees matching the existing trees along Corporate Circle. Although some of the trees along Corporate Circle are Cedar Elms, the City Landscape Administrator recommends planting Live Oaks spaced at 20’-25’ to match the majority of the existing street trees. The driveway configuration for the lot on Corporate Circle has been revised to show the connection to the north as stipulated in the P&Z motion and the southern driveway has been removed, eliminating the spacing issue that required a variance. The motions from the zoning and concept plan case that was approved by City Council September 21, 1999 are included below. P&Z ACTION: June 3, 1999; Approved (7-0) subject to Concept Plan Review Summary No. 3, dated May 28, 1999, deleting Item #1.a (driveway spacing); deleting Item #1.b but requiring the applicant to move the west entry as far north as possible and make it wide enough to meet the Fire Marshal’s approval but not allowing any parking spaces to be extended any closer to F.M. 1709 (no further south than what is shown on plans); allowing Item #2.b (perimeter bufferyards) as shown; and acknowledging the applicant’s agreement to provide a sidewalk along F.M. 1709. COUNCIL ACTION FIRST READING: June 15, 1999; Approved (7-0) subject to Concept Plan Review Summary No. 3, dated May 28, 1999, and per P&Z's recommendation except also allowing the stacking as shown on the west. Not in the motion was a recommendation for them to pay particular attention to the lighting and landscaping/bufferyards adjacent to the residences - (suggested a berm and pine trees even if the berm encroached into 20' DUE - if okay with engineering) in lieu of fencing, and also suggested that the dumpster be relocated on the west side away from the residences. COUNCIL ACTION SECOND READING: July 6, 1999; Approved (7-0) subject to Concept Plan Review Summary No. 3, dated May 28, 1999, with the variances as approved at First Reading; adding a requirement that the applicant provide a sidewalk along F.M. 1709; deleting all references to lighting on the concept; and requiring that the dumpsters be located not closer to residential than the existing dumpster at La Petite Academy and that it be shielded from view of F.M. 1709. Case No. Attachment A ZA08-100 Page 2 Case No. Attachment B ZA08-100 Page 1 Plans and support information Case No. Attachment C ZA08-100 Page 1 Site Plan Case No. Attachment C ZA08-100 Page 2 Variance Exhibit Case No. Attachment D ZA08-100 Page 1 Case No. Attachment D ZA08-100 Page 2 SITE PLAN REVIEW SUMMARY ZA08-100Four12/09/08 Case No.: Review No.: Date of Review: Southlake Boulevard Presbyterian Church Site Plan Project Name: APPLICANT: C. M. Architecture. PA Owner: Southlake Presbyterian Church Kris Calvert Dr. Michael B. Beaugh 1300 Summit Ave. Suite 300 1452 W. Southlake Blvd. Fort Worth, TX 76102 Southlake, TX 76092 Phone: (817) 877-0044 Phone: (8174) 442-8983 Fax: (817) 877-0418 Fax: (817) 442-8963 E-Mail: kcalvert@cmatx.com CITY STAFF HAS REVIEWED THE ABOVE REFERENCED PROJECT RECEIVED BY THE CITY ON 12/9/08 AND WE OFFER THE FOLLOWING STIPULATIONS. THESE STIPULATIONS ARE HEREBY MADE CONDITIONS OF SITE PLAN APPROVAL UNLESS SPECIFICALLY AMENDED BY THE CITY COUNCIL. IF YOU HAVE ANY QUESTIONS OR NEED FURTHER CLARIFICATION, PLEASE CONTACT RICHARD SCHELL AT (817) 748-8602 OR DENNIS KILLOUGH AT (817) 748-8072. 1. Please clarify the bufferyard width to be provided on the 126.04’ north outside phase 2 limits and the northeast 28.69’. The bufferyards shown are wider than the labels indicate. If additional bufferyard area will be provided, please add the width provided along with the width required. 2. Label the dumpster enclosure as “a minimum 8 foot tall masonry screen wall matching the The dumpster has been properly labeled and principal building with a solid metal access gate.” the requirement in the approval of the concept plan that the dumpster be located no closer to residential properties than the existing dumpster at La Petite Academy has also been met. 3. Provide a minimum 8’ screening device meeting the requirements of Ordinance 480, Sections 33 Please separate the note concerning and 39 along all boundaries abutting residential property. the screening device for adjacent properties from the note for the screening around the dumpster. 4. The property is within the Corridor Overlay Zone and must also meet the Residential Adjacency standards. Please provide elevation plans with dimensions showing building height, wall height, wall lengths, dimensions of horizontal and vertical articulation, and the type of exterior construction material. Masonry construction meeting the requirements of Ord. 557 and Ord. 480, Section 43.9.c.1.a is required on proposed buildings. Provide horizontal and vertical articulation meeting the requirements of Ord. 480, Section 43.9.c.1.c. on all facades visible from a Corridor R.O.W. The and/or any portion of the building within 400’ of a property zoned or designated residential. elevations do not meet the vertical articulation requirements in the Overlay Zones. A variance request letter has been submitted. 5. Add the following items to the Site Data Summary Chart (by phase and in total) to include the following items: a. Impervious coverage area and percentage. The impervious coverage percentage plus open space percentage must equal 100%. b. Correct the Phase 2 site area. The area is shown as 183,042.67 square feet in the site The Site Data Summary area row and 183,024.67 square feet in the open space row. needs to include all land area, building area, parking and impervious coverage for all Case No. Attachment E ZA08-100 Page 1 future phases, including Lot 14, Block 6. If future phases are not known to an exact figure, note a ±. Impervious coverage cannot exceed 65% for build out. 6. The following comments refer to driveways and parking. All driveways/points of ingess/egress must comply with the Driveway Ordinance No. 634, as amended). The following changes are needed: a. If the north driveway on Lot 14, Block 6 is approved, provide a connection by way of a The connection is shown on common access easement to Lot 13, Block 6 to the north. the revised plan. A common access easement will be required on the amended plat that is being approved by staff. b. The driveway stacking for the drive to Corporate Circle does not meet the minimum required. One-hundred (100) feet is required. Approximately thirty-eight (38) feet is Please add the variance request to the Variance Request letter. provided. c. Show any existing driveways across adjoining rights-of-way and note the type of pavement and use (residential, commercial, etc.) d. Include in the Site Data Summary Chart that 912 spaces are provided in Lot 14, Block 6 in a future phase. 7. Include the buildings in the future phases (grayed out) on the site plan as they are shown on the concept plan that was approved in 1999. 8. Show the 8’ multi-use trail along Southlake Blvd. extending to the east property line on the landscape plans and the tree conservation plans. 9. Parking lot islands must be 12’ wide equal to or greater than the depth of the spaces. 10. Show the street trees agreed to at the P&Z meeting on the landscape plan. The Landscape Administrator recommends Live Oaks spaced at 20’ to 25’. Case No. Attachment E ZA08-100 Page 2 11. Tree Conservation/Landscape Review Keith Martin Landscape Administrator (817) 748-8229 TREE CONSERVATION COMMENTS: * The only existing trees proposed to be removed are required landscape trees planted during the first phase of construction, six (6) Crape Myrtles, one (1) Cedar Elm, and one (1) Eastern Red Cedar. Two (2) existing trees that are in a parking lot median within the north parking area are proposed as borderline because the alteration of the existing parking lot may impact the critical root zone area of the trees. If the cut of the existing concrete is made on the south side of the north access drive and the access drive and curb remains in-place, the trees should not be impacted by the construction. LANDSCAPE COMMENTS: 1. With the approval of the previous Site Plan the following motions were made regarding landscape requirements. Requiring the bufferyards to be placed along Lot 20 and the first 30’ of Lot 19 with Phase I but acknowledging the applicant’s agreement to phase in the remainder of the bufferyards as phasing begins; acknowledging the applicant’s agreement to maintain the plantings in perpetuity. The required north bufferyard plant material was installed per the motion during the Phase 1 construction of the development. The remainder of the required north bufferyard plant material is proposed to be installed along with the additional required interior landscape plant material. 2. Provide one (1) north bufferyard. The entire north property line is the north bufferyard. 3. I don’t think the additional parking in the new lot on Corporate Drive is proposed to be constructed with the Phase II development, but when it is constructed parking lot landscape islands meeting the required width and length required by the Landscape Ordinance 544-A, must be constructed at all The islands have been added to the plan, but they must be 12’ wide ends of the rows of parking. for the entire length of the spaces. # Denotes required items. * Denotes informational or suggested items. Case No. Attachment E ZA08-100 Page 3 Public Works/Engineering Review Michelle McCullough Civil Engineer (817) 748-8274 EASEMENTS: 1. There appears to be an 8 inch public water line that is located on this property and is not located in an easement. This line will cross property lines and will be required to be in an easement. * Provide all necessary easements for all public water, sanitary sewer and drainage. Easements shall be 15’ minimum and located on one lot – not centered on the property line. A 20’ easement is required if both storm sewer and sanitary sewer will be located within the easement. * Water and sewer lines cannot cross property lines without being in a public easement or in the ROW. All waterlines in easements or ROW must be constructed to City standards. WATER COMMENTS: 1. The minimum size for public water lines is 8”. Typically the water meter is located just off the main line. The engineer should consider placement of the water meter in the pavement with a private service running to the building. The City will not maintain the proposed 40+ feet of 2 inch service before the meter. * There is an existing 8 inch diameter water line located on the west side of the existing building serve this development. * The water meters and fire hydrants must be located in an easement or right-of-way. * The fire line will need to be separate from the service lines. SANITARY SEWER COMMENTS: * The minimum size for sanitary sewer lines is 8”. All sanitary service lines must connect to a public sanitary system line that is built to City standards. * All sewer lines in easements or ROW must be constructed to City standards. * There is an existing 8 inch sewer line located on the west side of this property to serve this new development. DRAINAGE COMMENTS: * Show the limits of the floodplain if applicable. * Calculations will be required to verify that the proposed curb inlets will be able to handle the volume of storm water at proposed conditions. * The storm sewer will be public if runoff from other than this development site is collected in the system and transported, or the storm sewer crosses property lines. All public storm sewer will be 18” RCP minimum. * This property drains into Critical Drainage Structure #20 ($214.29/acre) and requires a fee to be paid prior to beginning construction. * The drainage from this development is generally to the northwest. * The discharge of post development runoff must have no adverse impact on downstream properties and meet the provisions of Ordinance # 605. INFORMATIONAL COMMENTS: * Submit 4 copies of the civil construction plans (22” X 34” full size sheets) and a completed Construction Plan Checklist as part of the first submittal for review directly to the Public Works Administration Department. The plans shall conform to the most recent construction plan checklist, standard details and general notes which are located on the City’s website. http://www.cityofsouthlake.com/PublicWorks/engineeringdesign.asp * An access permit from TxDOT is required prior to construction of a driveway on FM 1709, FM 1938 or SH 114. Submit application and plans directly to TxDOT for review. * A ROW permit shall be obtained from the Public Works Operations Department (817) 748-8082 Case No. Attachment E ZA08-100 Page 4 to connect to the City’s sewer, water or storm sewer system. * A Developer’s Agreement may be required for this development and may need to be approved by the City Council prior to any construction of public infrastructure. Construction plans for these improvements must be acceptable to Public Works prior to placing the Developer’s Agreement on the City Council agenda for consideration. * A separate bond will be required for the Maintenance Bond and bound only unto the City of Southlake for a period of two years for all development projects. The Maintenance Bond cannot be tied to the Performance and Payment Bond in any way. * Any hazardous waste being discharged must be pretreated Ordinance No. 836. * This review is preliminary. Additional requirements may be necessary with the review of construction plans. Case No. Attachment E ZA08-100 Page 5 Informational Comments: * No review of proposed signs is intended with this site plan. A separate building permit is required prior to construction of any signs. * All mechanical equipment must be screened of view right-of-ways and residential properties in accordance with the Zoning Ordinance No. 480, as amended. * All lighting must comply with the Lighting Ordinance No. 693, as amended. * All development must comply with the Drainage Ordinance No. 605 and the Erosion and Sediment Control Ordinance No. 946, as amended. * The applicant should be aware that prior to issuance of a building permit a Plat must be processed and filed in the County Plat Records, a fully corrected site plan, landscape plan, irrigation plan, and building plans, must be submitted for approval and all required fees must be paid. This may include but not be limited to the following fees: Park Fee, Perimeter Street Fee, Water & Sewer Impact and Tap Fees, and related Permit Fees. * Denotes Informational Comment Case No. Attachment E ZA08-100 Page 6 Surrounding Property Owners - - - - -- SPOOwner ZONING Land Use ACREAGE # 1 Carroll ISD SP1 Medium Density Residential, Public/Semi-56.04 Public 2 Burchfield, Michael R SF20A Medium Density Residential 0.68 & Karen 3 McLendon, Michael SF20A Medium Density Residential 0.49 Etux Debbie 4 Chealander, Steven SF20A Medium Density Residential 0.51 Etux Rebecc 5 Smith, Robert Etux SF20A Medium Density Residential 0.62 Sandra 6 Seyedkalal,MirjalalaeSF20A Medium Density Residential 0.56 dim Etux 7 Behringer, Rocklin & SF20A Medium Density Residential 0.49 Nancy J 8 Moore, Jack Etux SF20A Medium Density Residential 0.47 Sharon 9 Richardson, Gary SF20A Medium Density Residential, Office 0.47 Etux Patricia Commercial Case No. Attachment F ZA08-100 Page 1 10 Wallace, N B III Etux SF20A Medium Density Residential, Office 0.51 Lucretia Commercial 11 Nelson, Lisa Etvir SF20A Medium Density Residential, Office 0.48 Mark N Commercial 12 Southridge Lakes C3 Medium Density Residential, Retail 3.44 Hmowner Assn Commercial 13 Realty Income Texas C3 Medium Density Residential, Office 0.97 Prop Lp Commercial, Retail Commercial 14 Southlake Blvd CS Medium Density Residential, Office 5.02 Presbyterian C Commercial, Retail Commercial 15 Southlake Safeco Ltd C3 Office Commercial, Retail Commercial 1.31 16 Southlake 114 C3 Office Commercial, Retail Commercial 0.81 Investors 17 7-Eleven Inc C3 Office Commercial, Retail Commercial 0.99 18 Southlake Chamber C3 Office Commercial, Retail Commercial 0.46 Of Commerce 19 Realtex Ventures Inc C3 Office Commercial 1.36 20 Realtex Ventures Inc C3 Medium Density Residential, Office 1.73 Commercial 21 Eric H Schmidt Llc C3 Office Commercial 0.81 22 Jns Land Family Lp C3 Office Commercial 1.20 23 Southlake Blvd C3 Office Commercial, Retail Commercial 0.98 Presbyterian Ch Case No. Attachment F ZA08-100 Page 2 Surrounding Property Owner Responses Notices Sent: Twenty-three (23) Responses Received: Two (2) 1) Mirjalalaedim & Soraya Seyedkalal (6), Notification Response 104 San Jacinto Ct., submitted a opposition Form and supporting letter in on December 1, 2008 (see attached). 2) Michael & Debbie McLendon (3), Notification Response Form 110 San Jacinto Ct., submitted a in favor of on December 2, 2008 (see attached). Case No. Attachment G ZA08-100 Page 1 Case No. Attachment G ZA08-100 Page 2 Case No. Attachment G ZA08-100 Page 3 SPIN MEETING REPORT CASE NO. None assigned PROJECT NAME: Southlake Boulevard Presbyterian Church Education Building SPIN DISTRICT: 13 MEETING DATE: Monday, May 12, 2008 at 6:30PM MEETING LOCATION: 1400 MAIN STREET, SOUTHLAKE, TEXAS MEETING ROOMS 3A & 3B TOTAL ATTENDANCE: Ten (10), No (0) residents  SPIN REPRESENTATIVE(S) PRESENT: Michael Terry (13)  APPLICANT(S) PRESENTING: Kris Calvert  STAFF PRESENT: Planner Richard Schell STAFF CONTACT: Richard Schell, (817) 748-8602; rschell@ci.southlake.tx.us EXECUTIVE SUMMARY Property Location  1452 W. Southlake Boulevard. Development Details  Proposing an 11,785 sq. ft. one-story children's and adult education building behind the existing gym / meeting building.  Requesting a zoning change for a 0.97 acre lot to the west for parking.  A plat revision in conjunction with the site plan and zoning change. QUESTIONS & DISCUSSION No residents attended. SPIN Meeting Reports are general observations of SPIN Meetings by City staff and SPIN Representatives. The report is neither verbatim nor official meeting minutes; rather it serves to inform elected and appointed officials, City staff, and the public of the issues and questions raised by residents and the general responses made. Responses as summarized in this report should not be taken as guarantees by the applicant. Interested parties are strongly encouraged to follow the case through the Planning and Zoning Commission and final action by City Council. Case No. Attachment H ZA08-100 Page 1 CITY OF SOUTHLAKE, TEXAS ORDINANCE NO. 480-312a AN ORDINANCE AMENDING ORDINANCE NO. 480, AS AMENDED, THE COMPREHENSIVE ZONING ORDINANCE OF THE CITY OF SOUTHLAKE, TEXAS; GRANTING A ZONING CHANGE ON A CERTAIN TRACT OR TRACTS OF LAND WITHIN THE CITY OF SOUTHLAKE, TEXAS BEING LEGALLY DESCRIBED AS LOT 14, BLOCK 6, SOUTHRIDGE LAKES ADDITION, BEING APPROXIMATELY 0.984 ACRES, AND MORE FULLY AND COMPLETELY DESCRIBED IN EXHIBIT “A” FROM “C3” GENERAL COMMERCIAL DISTRICT TO “CS” COMMUNITY SERVICE DISTRICT, AS DEPICTED ON THE APPROVED SITE PLAN ATTACHED HERETO AND INCORPORATED HEREIN AS EXHIBIT “B”, SUBJECT TO THE SPECIFIC REQUIREMENTS CONTAINED IN THIS ORDINANCE; CORRECTING THE OFFICIAL ZONING MAP; PRESERVING ALL OTHER PORTIONS OF THE ZONING ORDINANCE; DETERMINING THAT THE PUBLIC INTEREST, MORALS AND GENERAL WELFARE DEMAND THE ZONING CHANGES AND AMENDMENTS HEREIN MADE; PROVIDING THAT THIS ORDINANCE SHALL BE CUMULATIVE OF ALL ORDINANCES; PROVIDING A SEVERABILITY CLAUSE; PROVIDING FOR A PENALTY FOR VIOLATIONS HEREOF; PROVIDING A SAVINGS CLAUSE; PROVIDING FOR PUBLICATION IN THE OFFICIAL NEWSPAPER; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City of Southlake, Texas is a home rule City acting under its Charter adopted by the electorate pursuant to Article XI, Section 5 of the Texas Constitution and Chapter 9 of the Texas Local Government Code; and, WHEREAS, pursuant to Chapter 211 of the Local Government Code, the City has the authority to adopt a comprehensive zoning ordinance and map regulating the location and use of buildings, other structures and land for business, industrial, residential and other purposes, and to amend said ordinance and map for the purpose of promoting the public health, safety, morals and general welfare, all in accordance with a comprehensive plan; and WHEREAS, the hereinafter described property is currently zoned as “C3” General Commercial District under the City’s Comprehensive Zoning Ordinance; and Case No. Attachment I ZA08-100 Page 1 WHEREAS, a change in the zoning classification of said property was requested by a person or corporation having a proprietary interest in said property; and WHEREAS, the City Council of the City of Southlake, Texas, at a public hearing called by the City Council did consider the following factors in making a determination as to whether these changes should be granted or denied: safety of the motoring public and the pedestrians using the facilities in the area immediately surrounding the sites; safety from fire hazards and damages; noise producing elements and glare of the vehicular and stationary lights and effect of such lights on established character of the neighborhood; location, lighting and types of signs and relation of signs to traffic control and adjacent property; street size and adequacy of width for traffic reasonably expected to be generated by the proposed use around the site and in the immediate neighborhood; adequacy of parking as determined by requirements of this ordinance for off-street parking facilities; location of ingress and egress points for parking and off-street loading spaces, and protection of public health by surfacing on all parking areas to control dust; effect on the promotion of health ad the general welfare; effect on light and air; effect on the over-crowding of the land; effect on the concentration of population, and effect on transportation, water, sewerage, schools, parks and other public facilities; and, WHEREAS, the City Council of the City of Southlake, Texas, further considered among other things the character of the districts and their peculiar suitability for particular uses and the view to conserve the value of the buildings, and encourage the most appropriate use of the land throughout this City; and, WHEREAS, the City Council of the City of Southlake, Texas, does find that there is a public necessity for the zoning changes, that the public demands them, that the public interest clearly requires the amendments, and that the zoning changes do not unreasonably invade the rights of those who bought or improved property with reference to the classification which existed at the time Case No. Attachment I ZA08-100 Page 2 their original investment was made; and, WHEREAS, the City Council of the City of Southlake, Texas, does find that the changes in zoning lessen the congestion in the streets, helps secure safety from fire, panic, and other dangers, promotes the health and the general welfare, provides adequate light and air, prevents the over-crowding of land, avoids undue concentration of population, and facilitates the adequate provision of transportation, water, sewerage, schools, parks and other public requirements; and, WHEREAS, the City Council of the City of Southlake, Texas, has determined that there is a necessity and need for the changes in zoning and has also found and determined that there has been a change in the conditions of the property surrounding and in close proximity to the tract or tracts of land requested for a change since the tract or tracts of land were originally classified and therefore feels that the respective changes in zoning classification for the tract or tracts of land are needed, are called for, and are in the best interest of the public at large, the citizens of the city of Southlake, Texas, and helps promote the general health, safety and welfare of the community. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF SOUTHLAKE, TEXAS: SECTION 1. That Ordinance No. 480, the Comprehensive Zoning Ordinance of the City of Southlake, Texas, passed on the 19th day of September, 1989, as originally adopted and amended, is hereby amended so that the permitted uses in the hereinafter described areas be altered, changed and amended as shown and described below: Being Lot 14, Block 6, Southridge Lakes Addition, an addition to the City of Southlake, Tarrant County, Texas, according to the plat recorded in Cabinet A, Slide 4596, Plat Records, Tarrant County, Texas, and being approximately 0.984 acres, and more fully and completely described in Exhibit “A” from “C3” General Commercial District to “CS” Community Service District, as depicted on the approved Site Plan attached hereto and incorporated herein as Exhibit “B”, and subject to the following specific conditions: Case No. Attachment I ZA08-100 Page 3 1. SECTION 2. That the City Manager is hereby directed to correct the Official Zoning map of the City of Southlake, Texas, to reflect the herein changes in zoning. SECTION 3. That in all other respects the use of the tract or tracts of land herein above described shall be subject to all the applicable regulations contained in said Zoning Ordinance and all other applicable and pertinent ordinances for the City of Southlake, Texas. All existing sections, subsections, paragraphs, sentences, words, phrases and definitions of said Zoning Ordinance are not amended hereby, but remain intact and are hereby ratified, verified, and affirmed. SECTION 4. That the zoning regulations and districts as herein established have been made in accordance with the comprehensive plan for the purpose of promoting the health, safety, morals and the general welfare of the community. They have been designed, with respect to both present conditions and the conditions reasonably anticipated to exist in the foreseeable future; to lessen congestion in the streets; to provide adequate light and air; to prevent over-crowding of land; to avoid undue concentration of population; and to facilitate the adequate provision of transportation, water, sewerage, drainage and surface water, parks and other commercial needs and development of the community. They have been made after a full and complete hearing with reasonable consideration among other things of the character of the district and its peculiar suitability for the particular uses and with a view of conserving the value of buildings and encouraging the most appropriate use of land throughout the community. SECTION 5. Case No. Attachment I ZA08-100 Page 4 That this ordinance shall be cumulative of all other ordinances of the City of Southlake, Texas, affecting zoning and shall not repeal any of the provisions of said ordinances except in those instances where provisions of those ordinances are in direct conflict with the provisions of this ordinance. SECTION 6. That the terms and provisions of this ordinance shall be deemed to be severable and that if the validity of the zoning affecting any portion of the tract or tracts of land described herein shall be declared to be invalid, the same shall not affect the validity of the zoning of the balance of said tract or tracts of land described herein. SECTION 7. Any person, firm or corporation who violates, disobeys, omits, neglects or refuses to comply with or who resists the enforcement of any of the provisions of this ordinance shall be fined not more than Two Thousand Dollars ($2,000.00) for each offense. Each day that a violation is permitted to exist shall constitute a separate offense. SECTION 8. All rights and remedies of the City of Southlake are expressly saved as to any and all violations of the provisions of Ordinance No. 480, as amended, or any other ordinances affecting zoning which have accrued at the time of the effective date of this ordinance; and, as to such accrued violations and all pending litigation, both civil and criminal, whether pending in court or not, under such ordinances, same shall not be affected by this ordinance but may be prosecuted until final disposition by the courts. SECTION 9. The City Secretary of the City of Southlake is hereby directed to publish the proposed ordinance or its caption and penalty together with a notice setting out the time and place for a Case No. Attachment I ZA08-100 Page 5 public hearing thereon at least fifteen (15) days before the second reading of this ordinance, and if this ordinance provides for the imposition of any penalty, fine or forfeiture for any violation of any of its provisions, then the City Secretary shall additionally publish this ordinance in the official City newspaper one time within ten (10) days after passage of this ordinance, as required by Section 3.13 of the Charter of the City of Southlake. SECTION 10. This ordinance shall be in full force and effect from and after its passage and publication as required by law, and it is so ordained. PASSED AND APPROVED on the 1st reading the _____ day of ___________, 2008. _________________________________ MAYOR ATTEST: _________________________________ CITY SECRETARY PASSED AND APPROVED on the 2nd reading the _____ day of __________, 2008. ________________________________ MAYOR ATTEST: ________________________________ CITY SECRETARY Case No. Attachment I ZA08-100 Page 6 APPROVED AS TO FORM AND LEGALITY: _________________________________ CITY ATTORNEY DATE:___________________________ ADOPTED:_______________________ EFFECTIVE:______________________ Case No. Attachment I ZA08-100 Page 7 EXHIBIT “A” Being Lot 14, Block 6, Southridge Lakes Addition, an addition to the City of Southlake, Tarrant County, Texas, according to the plat recorded in Cabinet A, Slide 4596, Plat Records, Tarrant County, Texas, and being approximately 0.984 acres Case No. Attachment I ZA08-100 Page 8 EXHIBIT “B” Site Plan Reserved for Approved Site Plan Case No. Attachment I ZA08-100 Page 9 Elevations Reserved for Approved Elevations Case No. Attachment I ZA08-100 Page 10 Variance Letter Case No. Attachment I ZA08-100 Page 11 Case No. Attachment I ZA08-100 Page 12