Item 4OItem 4OZA08-100
Owner: Southlake Blvd. Presbyterian Church
Applicant C.M. Architecture, PA
Request: Approval of a zoning change and site plan to revise the currently approved concept plan and site plan and to change the zoning of a lot acquired west of the existing church
from “C3” Retail Commercial District to “CS” Community Service District in order to match the zoning of the existing church
Location: 1452 W. Southlake Blvd. and 1470 Corporate Circle, being described as Lots 3 and 14, Block 6, Southridge Lakes Addition and being approximately 4.2 acres
LU Map
Zoning District Map
Looking north toward the property
The lot to be rezoned for future parking
Looking east toward the property
Looking south toward the property
Looking west toward the property
Gross/Net Acreage: 183,042 square feet
4.2 acres
Square Footage: 10,548 square feet - Addition
10,880 square feet - Existing
21,428 square feet – Total
Parking Required: 128 spaces
Parking Provided:
Phase 2 145 spaces
Lot 14, Block 6 92 spaces (future parking)
Phase II Site Data Summary
Color Rendering
Approved Concept Plan May 11, 1999
Approved Phase I Site Plan August 2, 1999
Site Plan Approved by P&Z December 4, 2008
Revised Site Plan December 9, 2008
North and East Elevations
Variance Requested for Vertical Articulation
West Elevation
Variance Requested for Vertical Articulation
CONCEPT PLAN
ELEVATION RENDERING
SITE PLAN
Tree Conservation Plan
Color Landscape Plan
Color Landscape Plan (Enlarged)
CONCEPT PLAN
ELEVATION RENDERING
SITE PLAN
Color Landscape Plan (Enlarged)
Driveway Stacking Variance
Driveway Stacking ±38’
Item 4O ZA08-100
P & Z ACTION: December 4, 2008; Approved (4-0) subject to Revised Review Summary No. 3, dated December 4, 2008; granting the requested variances to vertical articulation and driveway
stacking requirements and denying the variance to driveway spacing, noting the applicant’s willingness to tie the southern driveway entrance on Corporate Circle into the existing driveway
entrance on Lot 5, Block 6, to provide cross access to Lot 14, Block 6 to the north, to modify the landscape plan to include street trees matching the existing trees on Corporate Circle
and noting that the impervious coverage for the entire site for all phases is not to exceed 65% as required by ordinance.
Questions
CONCEPT PLAN
ELEVATION RENDERING
SITE PLAN
Utility Plan
Existing Public 42 inch Storm Sewer
CONCEPT PLAN
ELEVATION RENDERING
SITE PLAN
Grading Plan
CONCEPT PLAN
ELEVATION RENDERING
SITE PLAN
Existing Drainage Area Map
CONCEPT PLAN
ELEVATION RENDERING
SITE PLAN
Proposed Drainage Area Map
Questions?Ken Baker(817) 748-8067