Loading...
Item 4OItem 4O ZA08-100 Owner: Southlake Blvd. Presbyterian Church Applicant C.M. Architecture, PA Request: Approval of a zoning change and site plan to revise the currently approved concept plan and site plan and to change the zoning of a lot acquired west of the existing church from “C3” Retail Commercial District to “CS” Community Service District in order to match the zoning of the existing church Location: 1452 W. Southlake Blvd. and 1470 Corporate Circle, being described as Lots 3 and 14, Block 6, Southridge Lakes Addition and being approximately 4.2 acres LU Map Zoning District Map Looking north toward the property The lot to be rezoned for future parking Looking east toward the property Looking south toward the property Looking west toward the property Gross/Net Acreage: 183,042 square feet 4.2 acres Square Footage: 10,548 square feet - Addition 10,880 square feet - Existing 21,428 square feet – Total Parking Required: 128 spaces Parking Provided: Phase 2 145 spaces Lot 14, Block 6 92 spaces (future parking) Phase II Site Data Summary Color Rendering Approved Concept Plan May 11, 1999 Approved Phase I Site Plan August 2, 1999 Site Plan Approved by P&Z December 4, 2008 Revised Site Plan December 9, 2008 North and East Elevations Variance Requested for Vertical Articulation West Elevation Variance Requested for Vertical Articulation CONCEPT PLAN ELEVATION RENDERING SITE PLAN Tree Conservation Plan Color Landscape Plan Color Landscape Plan (Enlarged) CONCEPT PLAN ELEVATION RENDERING SITE PLAN Color Landscape Plan (Enlarged) Driveway Stacking Variance Driveway Stacking ±38’ Item 4O ZA08-100 P & Z ACTION: December 4, 2008; Approved (4-0) subject to Revised Review Summary No. 3, dated December 4, 2008; granting the requested variances to vertical articulation and driveway stacking requirements and denying the variance to driveway spacing, noting the applicant’s willingness to tie the southern driveway entrance on Corporate Circle into the existing driveway entrance on Lot 5, Block 6, to provide cross access to Lot 14, Block 6 to the north, to modify the landscape plan to include street trees matching the existing trees on Corporate Circle and noting that the impervious coverage for the entire site for all phases is not to exceed 65% as required by ordinance. Questions CONCEPT PLAN ELEVATION RENDERING SITE PLAN Utility Plan Existing Public 42 inch Storm Sewer CONCEPT PLAN ELEVATION RENDERING SITE PLAN Grading Plan CONCEPT PLAN ELEVATION RENDERING SITE PLAN Existing Drainage Area Map CONCEPT PLAN ELEVATION RENDERING SITE PLAN Proposed Drainage Area Map Questions? Ken Baker (817) 748-8067