Item 4FY 2010SidewalkProjectsUpdate
City Council
December 1, 2009
Presentation Outline
Southlake 2025 Plan
Strategic Alignment
Citizen Survey
2009 Sidewalk projects completed
FY 2010 Sidewalk plan
Questions
Southlake 2025 Plan
City of Southlake Strategy Map
The City of Southlake provides municipal services that support the highest quality of life for our residents and businesses. We do this by delivering outstanding value
and unrivaled quality in everything that we do.
Fulfill Our
Mission
Promote
Learning
and Growth
Provide
Financial
Stewardship
Serve Our
Customers
Live Our Core Values
Manage the
Business
Safety Mobility Infrastructure Performance Management Quality Partnerships
and Security and Service Delivery Development and Volunteerism
Deliver on Our
Focus Areas
Results from the Citizens Survey:
“Sidewalk availability was the lowest rated condition overall, and it was rated lower in SPINs A and B than in SPIN C.”
“If taxes are increased to increase services, those willing to accept the increase believe the additional revenue should go toward parks and recreation, sidewalks, and street maintenance.”
Website Contact Form Request
City Council Initiatives
Adoption of the Sidewalk Plan
Ordinance Revisions
Grant Funding
FY 10 CIP funding
$ 300,000
Sidewalk Partnership Program (Item 4E)
STEP Resolution (Item 7A)
FY 2009 Completed Segments
Completed
Constructed with FM 1709 Decel/Median Project
Requires TxDOT Permit – FM 1709 Plans
Under Construction
Segments Completed
SH 114 WB Frontage Road
(Blessed Way to Grace Lane)
Kirkwood
Kimball to Blessed Way
Morrison Office Park
Segments Completed
Segments Completed
East Haven
Includes Pedestrian Bridge
FM 1709
Phase II of Mendez development
Segments Completed
Shady Oaks
Along development
Segments Completed
DPS Hdqtrs
(Carroll Ave)
Dove & Carroll Roundabout
Segments Completed
Estes Park
Bowen Office Bldg
Segments Completed
Woodbury
Liberty Park
Segments Completed
Xaris Office Park
Royal and Annie Smith Park
FY 2010 Segments
FM 1709 sidewalk sections built with decel lane/median project
FM 1709 sidewalk priority segments
FY 2010 funding will be used to supplement 2009 priority list
DECEL LANE PROJECT LOCATION MAP (16 locations)
FY 2010 Funding
Additional funding is necessary to:
Construct retaining walls
FY 2010 Funding
Additional funding is necessary to:
Reconstruct driveways to provide TAS slope
FY 2010 Funding
Additional funding is necessary to:
Provide for drainage structures, rails, irrigation system repairs, etc.
Questions?
Status of Project Listing from FY 2008:
Status of Project Listing from 2008:
Project Segment #1 – connecting from existing sidewalks on East side of South Carroll at Westmont Drive south to Bordeaux. Southlake Sidewalk Plan Segment # 60
COMPLETED
Project Segment #2 – connecting from west side of North White Chapel along FM 1709 to future sidewalk at decel lane in front of Bicentennial Park. Southlake Sidewalk Plan Segment #
47a & b
White Chapel
FM 1709
Decel lane
Bicentennial Park
Existing sidewalk
FM 1709
Shady Oaks
Segment #2
Issues include need for wall and rail; and proposed decel lane
Segment # 2
Segment # 2 information:
Length = approximately 1000 feet
Width and depth = 8 feet at 6 inches
Project Segment #3 – east side of North Carroll at Taylor Street south to Dove Road. Southlake Sidewalk Plan Segment # 61.
Segment # 3
Taylor
North Carroll
Recently built
Existing sidewalk
Future Round-about
Dove
Carroll Middle School
Existing sidewalk
Segment # 3
Issues include trees, right-of-way, and future round-about at Dove
Segment # 3
Segment # 3
Segment # 3
Segment # 3 information:
Length = approximately 1400 feet
Width and depth = 5 feet at 4 inches
Project Segment #4 – connecting from Mendez development along FM 1709 to decel lane at Foxborough Drive. Southlake Sidewalk Plan Segment # 126
Decel lane
FM 1709
Foxborough Ln
Existing sidewalk at Mendez
Segment # 4
Issues include the proposed decel lane and utilities
Segment # 4 information:
Length = approximately 600 feet
Width and depth = 8 feet at 6 inches
Project Segment #5 – connecting from west side of Foxborough Lane to Diamond Boulevard. Southlake Sidewalk Plan Segment # 25
FM 1709
Foxborough Ln
Diamond Blvd
Decel lane
Segment # 5
There are no noted issues with this segment
Segment # 5
There are no noted issues with this segment
Segment # 5 information:
Length = approximately 450 feet
Width and depth = 8 feet at 6 inches
Project Segment #6 – south side of FM 1709 from existing sidewalk at Harris Methodist to decel lane at Miron Drive. Southlake Sidewalk Plan Segment # 85
FM 1709
Existing sidewalk at Harris Methodist
Decel lane
FM 1709
Westwood Drive
Decel lane
Recently
Constructed
Segment # 6
Issue with this segment is the proposed decel lanes
Segment # 6
Segment # 6 information:
Length = approximately 150 feet
Width and depth = 8 feet at 6 inches
Project Segment #7 – existing sidewalk on the west side of Player’s Circle connecting to Davis Boulevard. Southlake Sidewalk Plan Segment # 104
Existing sidewalk at Players Circle
Davis Blvd
FM 1709
Randol Mill
Segment # 7
There are no noted issues with this segment
Segment # 7
Segment # 7 information:
Length = approximately 1200 feet
Width and depth = 8 feet at 6 inches
Project Segment #8 – east side of North Carroll Avenue from existing sidewalk at Bay Meadows Drive connecting to Whispering Lane. Southlake Sidewalk Plan Segment # 130.
Bay Meadows Drive
Whispering Lane
Existing sidewalk
Carillon Development
Segment # 8
Issues include trees, right-of-way, bridge/culvert
Segment # 8 information:
Length = approximately 1000 feet
Width and depth = 5 feet at 4 inches
Project Segment #9 – connecting from west side of Diamond Boulevard along FM 1709 to White Chapel Boulevard. Southlake Sidewalk Plan Segment # 129
Segment # 9
Diamond Blvd
FM 1709
White Chapel Blvd
FM 1709
Segment # 9
Issues include utilities and retaining wall
Segment # 9 information:
Length = approximately 2000 feet
Width and depth = 8 feet at 6 inches
Project Segment #10 – segment/bridge connecting Gallant Court to Johnson Place Estates. Southlake Sidewalk Plan Segment # 131.
Existing Johnson Place Estates
Gallant Ct
Trailhead Dr
Johnson Rd
Segment # 10
HOA requested cooperation from City to build
Segment # 10
View from Johnson Place existing sidewalk
Segment # 10 information:
Length = approximately 100 feet
Width and depth = 5 feet at 4 inches
Project Segment #11 – segment connecting planned sidewalk in front of Chick-fil-A to existing sidewalk in front of Georgetown and continuing on to Nolen. Southlake Sidewalk Plan Segments
# 143, 143c, and 143d.
Future sidewalk at Chick-fil-A
FM 1709
Existing sidewalk
Nolen
Segment # 11
Segment # 11
Segment # 11 information:
Length = approximately 1525 feet
Width and depth = 5 feet at 6 inches
Resolution No. 09-074
Authorizing and endorsing an application for the 2009 Transportation Enhancement (TE) Program for the construction of sidewalks along F.M. 1709
Transportation Enhancement Program
Competitive funding opportunities for non-traditional transportation projects, such as sidewalks
Cost-reimbursement program
Minimum local match is 20%
Federally funded
Administered by TXDOT
Southlake Application
Sidewalks along F.M. 1709, excluding deceleration lane sidewalks
City is requesting $1.7 million in federal funds; local match is approximately $433,000