Background
February , 2007 – Awarded route study
Yielded 2 possible alignments for the 30” T.W. King transmission line
Preferred route along proposed FM 1938
Background
Segments A and F – Construction contract awarded to Circle C Construction on February 3, 2009 by City Council and is currently under construction
Design of Segments B, C, D, and E is 90 percent complete
A new meter station is required by the Wholesale Water Meter Contract with the City of Fort Worth
Need for water line by 2012 to serve Southlake through T. W. King Pump Station
Proposed Contract
EXPENSES:
Line of Sight SCADA Path Study $ 1,800
Vault and Meter Design $ 39,280
Construction General Representation $ 25,520
Total contract amount $ 66,600
FUNDING:
502699-598801-U0030 $ 66,600