Loading...
Stimulus Funds Update1 2 3 4 5 6 -None/unknown as it depends on award. will receive?How much stimulus funding has been received or do you anticipate you indicating they received the application and are processingindicating they received the application and are processingCorrespondence Correspondence Has there been any response (if so, please describe)?Has there been any response (if so, please describe)?and the extremely limited funding we will not receive this funding.because of the enormous number of cities that will apply, no required match, Applied for $64,500 in funding to replace fuel tanks, upgrade Public Works Applied for $64,500 in funding to replace fuel tanks, upgrade Public Works and DPS West fuel pumps to support alternative fuels, and purchase one and DPS West fuel pumps to support alternative fuels, and purchase one lightlight--duty hybrid vehicle duty hybrid vehicle These requests have been handled on behalf of the city through the These requests have been handled on behalf of the city through the NCTCOG and the DFW Clean Cities Coalition NCTCOG and the DFW Clean Cities Coalition Southlake requests were included in a submission to the Department of Southlake requests were included in a submission to the Department of Energy Energy The City should be notified of further progress within the next few monthsThe City should be notified of further progress within the next few months Assistance to Firefighter Grant (normal grant, but additional monies allocated through the stimulus plan.) -$103,110 -No response. Just submitted, won’t hear for about 6-9 months maybe We do not anticipate receiving these funds because of the huge increase in requests this year. Assistance to Firefighters Fire Station Construction Grant -Not yet applied 7 -Could be a year after initial application until decision Through the Safe Routes to School Program, theThrough the Safe Routes to School Program, theCarroll Middle School Carroll Middle School project received $63,249 from TxDOT for engineering, ROW, and project received $63,249 from TxDOT for engineering, ROW, and constructionconstruction Also, the Carroll Elementary School project received $23,560 from TxDOT Also, the Carroll Elementary School project received $23,560 from TxDOT through the Safe Routes to School Program for engineering, ROW, and through the Safe Routes to School Program for engineering, ROW, and constructionconstruction 8 30” TW King Water Line 30” TW King Water Line Submitted an application requesting $14,850,000 for reimbursement of design cost, Submitted an application requesting $14,850,000 for reimbursement of design cost, construction cost, ROW cost. construction cost, ROW cost. Scheduled to be notified sometime in September as to whether or not we have been Scheduled to be notified sometime in September as to whether or not we have been selected by TWDB selected by TWDB Not anticipating to be selected Not anticipating to be selected Received a letter from the TWDB June 16, 2009 stating that this project was not eligible Received a letter from the TWDB June 16, 2009 stating that this project was not eligible for funds in 2009.for funds in 2009.We have some questions regarding this and will be following up with We have some questions regarding this and will be following up with the TWDB but at this time this project is not being considered for funds. the TWDB but at this time this project is not being considered for funds. Quail Creek Estates –Sanitary Sewer Project Submitted an application requesting $1,700,000 for reimbursement of design cost, construction cost, ROW Cost Was notified that we were “short listed” –should know by the end of this week whether we were selected for the money Not anticipating getting all of it because design is complete and the project is ready to go to construction.However an environmental study at a cost of $39,000 will have to be performed as part of the requirements and at this time the TWDB is not extending the deadline for all the required submittals in order to move forward.The environmental study will take longer to complete than the deadline for the submittals.If TWDB relaxes either the deadline or the requirements there is a slight chance that the City may be able to take advantage of this money.At this time we do not know whether it is a grant or a low interest loan. Heatherwood, Twin Creeks, Royal Oaks –Sanitary Sewer Project Submitted an application requesting $3,250,500 for construction cost. TWDB has not notified the City of any type of selection for this project Not anticipating getting any of this money.An environmental study would have to be performed for this project if selected for funding. 9 There have been no defined facilities related grant programs other than There have been no defined facilities related grant programs other than the energy block grants, but additional programs should be created by the energy block grants, but additional programs should be created by late Septemberlate September 10 11