Item 7B (3)Proposed Capital Improvement Program Traffic Initiatives
Proposed FY 2010 CIP Improvements
$1.49 Million – Proposed funds allocated
Proposed Improvements:
N. Kimball Road Improvements - Phase I
4 Lane Divided Thoroughfare
N. Carroll-Kirkwood Connector
Revised Kirkwood Blvd - Highland Connection
Kimball – Highland Intersection Improvements
Existing Kirkwood
N. Carroll-Kirkwood Connector
Purpose: To handle additional traffic generated from new CISD middle school
Constructs 2 lanes of permanent concrete pavement from west terminus of Kirkwood Blvd to Grace Lane.
Connects 2 lane Kirkwood Blvd to N. Carroll intersection via asphalt realignment
Kirkwood - Highland Reconfiguration
Purpose: To de-emphasize Highland Ave as access road to new middle school
Requires realignment of Highland Avenue to connect to Kirkwood in lieu of connection to N. Carroll Ave intersection.
Highland Intersection Improvements
Provide northbound left turn lane and storage for Highland Ave.
Provide eastbound left turn lane and dedicated right turn lane at N. Kimball
Possible signal improvements dependent upon Signal warrant analysis
Questions?