Loading...
Item 9A (2)ZA09ZA09--010010 Owner:Owner:Hines Southlake Land L.P.Hines Southlake Land L.P. Request:Request:Approval of a preliminary Approval of a preliminary plat proposing 404 plat proposing 404 Residential Lots and 19 Residential Lots and 19 Open Space Lots on Open Space Lots on approximately 234 acresapproximately 234 acres Location:Location:Northeast corner of S.H. 114 Northeast corner of S.H. 114 & N. White Chapel Blvd. and & N. White Chapel Blvd. and west of N. Carroll Avenuewest of N. Carroll Avenue Zoning District Map LU Map Current Zoning: ECZ Employment Center Zoning District OVERALL DEVELOPMENT PLAN -0.16 acre + 0.28 acre -0.16 acre + 0.45 acre DEVELOPMENT PLAN OVERALL PRELIMINARY PLAT SITE DATA SUMMARYSITE DATA SUMMARY TotalTotalGrossGrossDensityDensity Total Open Total Open Total Open Total Open SpaceSpaceSpaceSpace UnitsUnitsAcresAcres (Acreage)(Acreage)(Percent)(Percent) Phase 1Phase 112712769.269.21.81.811.511.516.6%16.6% Phase 2Phase 2818129.929.92.72.72.22.27.4%7.4% Phase 3Phase 312512567.467.41.91.918.418.427.3%27.3% Phase 4Phase 4717163.963.91.11.128.028.043.8%43.8% TotalTotal404404230.4230.41.81.860.160.126.1%26.1% Min. 1000’ Centerline Radius RequiredMin. 1000’ Centerline Radius Required Min. 800’ Centerline Radius Proposed w/ a 45mph design speedMin. 800’ Centerline Radius Proposed w/ a 45mph design speed Min. 1000’ Centerline Radius RequiredMin. 1000’ Centerline Radius Required Min. 600’ Centerline Radius Proposed w/ a 45mph design speedMin. 600’ Centerline Radius Proposed w/ a 45mph design speed VariancesVariances LANSCAPE PLAN PEDESTRIAN ACCESS PLANELEVATION RENDERINGCONCEPT PLANSITE PLAN TREE CONSERVATION PLAN Section 1 Section 3 Section 2 Section 4 OVERALL PRELIMINARY PLAT PRELIMINARY PLAT (SECTION 1) PRELIMINARY PLAT (SECTION 2) PRELIMINARY PLAT (SECTION 3) PRELIMINARY PLAT (SECTION 4) PRELIMINARY UTILITY PLAN PRELIMINARY DRAINAGE PLAN STREET CROSS SECTIONS P & Z Action: April 23 2009; Approved (6P & Z Action: April 23 2009; Approved (6--0) granting the 0) granting the requested variance for centerline radius subject to meeting requested variance for centerline radius subject to meeting the 45 mph design speed and subject to the Plat Review the 45 mph design speed and subject to the Plat Review Summary No. 2, dated April 17, 2009.Summary No. 2, dated April 17, 2009. Questions?Questions?