Loading...
Item 6C Ordinance 480-YYY Modifications to Zoning Ordinance 480 regarding On-Site Sewage Facilities (OSSF) On-Site Sewage Facilities Existing Regulation Proposed Revisions Sections 33.14, 40.3, & 41.3 For properties proposing an on-site sewage facility, a plan is required that shows the type and location of the on-site sewage facility, topography of the site, location of spray fields, all easements, impact on any existing trees, and any additional information required by the Authorized Agent responsible for on-site sewage facility permitting and inspections. No building permit shall be issued until such plan has been reviewed and approved by the Authorized Agent nor shall any certificate of occupancy be issued until the system has been properly installed and inspected by the Authorized Agent. (As amended by Ordinance No. 480- YYY) Proposed Revisions Section 4 AUTHORIZED AGENT RESPONSIBLE FOR ON-SITE SEWAGE FACILITY PERMITTING AND INSPECTIONS – The individual, organization, or government entity contracted with the City that is responsible for the proper implementation of Texas Health and Safety Code Chapter 366 and Texas Administrative Code Chapter 285. (As amended by Ordinance No. 480-YYY) Citizen Input / Board Review P&Z Discussion: February 5, 2009 P&Z Discussion: March 5, 2009 SPIN Meeting – March 23, 2009 P&Z Commission – April 9, 2009 Approved as presented (7-0) City Council 1st Reading – May 19, 2009 Approved as presented (7-0) Questions? How do On-site Sewage Facilities Work? Anaerobic (Septic) Systems Not appropriate for much of North Texas’ soil 15% of today’s installations are traditional “septic” systems Greater potential for odor, blockage, environmental impact, etc. How do On-site Sewage Facilities Work? Aerobic Systems 48 different designs on the market Typically used with spray heads Cleaner effluent More equipment and electricity use Costlier and more potential for failure On-Site Sewage Facilities Policy Considerations Leach / Aeration Field Setbacks Between 25’ and 50’ Drainage, Flowage, & Floodplain Easements Detailed OSSF plans for developments of __ lots or more or for R-PUDs, etc. Requiring maintenance contract for C.O. Building Code: Maximum distance under ground 8-12 inches Air pressure gauge requirements