Loading...
Item 7A - Drainage Memo Liberty Place Addition 5000 Thompson Terr. AN ANA Project No. 260090 Colleyville,Texas 76034 CONSULTANTS,L.L.C. (817) 335-9900 Attention: City of Southlake- Public Works/ Development Engineering Re: Technical Memorandum for Liberty Place Addition 1.0 Project Description: Liberty Place Addition is a proposed six-lot single-family residential subdivision at 2300 W. Continental Blvd. in Southlake,Texas.The subdivision includes 3.520 acres and consists of Lots 1-6, Block 1. An earlier development plan included approximately 2.8 acres, excluding the eastern property now included in the subdivision. The lots will be served by William Court. Most existing runoff drains south to W. Continental Blvd.,with smaller flows west toward adjacent neighbor.The proposed grading maintains the existing downstream drainage patterns. This memorandum compares pre-development and post-development drainage conditions and evaluates downstream impacts. 1.1 Submittal Package: The following exhibits are included with this memorandum: • Pre-Development Drainage Area Map &Calculations-Sheet C8.0 • Post-Development Drainage Area Map &Calculations-Sheet C8.1 • City of Southlake Continental Boulevard and Union Church Road Improvements (2026)—Record Drawings • Hydraulic Calculations and Roadway Assessment—Sheet C8.2 2.0 Site Runoff Overview: Five design points are shown on Sheets C8.0 and C8.1: Design Point 1—Existing 10' curb inlet B3 on W. Continental Blvd. Design Point 2—Existing 10' curb inlet B2 on W. Continental Blvd. Design Point 3—Existing 10' curb inlet B1 on W. Continental Blvd. Design Point 4—Overland runoff east to W. Continental Blvd. Design Point 5—Overland runoff west to the adjacent neighbor. 3.0 Existing Drainage and Downstream Conveyance: The existing 18" storm drain and curb inlets along W. Continental Blvd.were installed as part of the City of Southlake Continental Boulevard and Union Church Road CIP Improvements (2026).The existing storm drain system was originally designed to convey the 10-year storm, per TxDOT design criteria, with excess 100-year runoff conveyed within the roadway right-of-way. Southlake Code of Ordinances Section 9.5-61 references the City of Fort Worth Stormwater Criteria Manual. Sheet C8.2 evaluates the existing 18" storm drain for the 5-year storm and the combined storm drain and roadway curb and gutter for the 100-year storm. 3.1 Methodology and Assumptions: • The Rational Method was used for the 1-, 5-, 10-, 25-, and 100-year runoff calculations shown on Sheets C8.0 and C8.1. • The drainage areas were delineated using existing topography and 2019 USGS LiDAR data. • Storm intensity values are from the iSWM Hydrology Technical Manual,Table 5.15,Tarrant County Rainfall Data. Page 1 of 3 Liberty Place Addition 5000 Thompson Terr. AN ANA Project No. 260090 Colleyville,Texas 76034 CONSULTANTS,L.L.C. (817) 335-9900 • Runoff coefficients are based on the land uses and composite C-values shown on Sheets C8.0 and C8.1: o Residential one-acre lots: C=0.45 o Residential half-acre lots: C=0.55 o Impervious surfaces: C=0.95; pervious surfaces: C=0.30 • A minimum time of concentration of 15 minutes was used for the drainage calculations: 0 11=3.32 in/hr 0 15=4.86 in/hr 0 1100=7.98 in/hr • Sheet C8.2 includes the existing 18" storm drain hydraulic calculations, roadway capacity calculations, and Cross-Section A-A at Sta. 1+50, upstream of the W. Continental Blvd. and Davis Blvd. intersection. 4.0 Design Summary: Design Point 1: Design Point 1 is the existing 10' curb inlet B3 on W. Continental Blvd. • Pre-development runoff includes Area Al and offsite Areas 0S-1A and 0S-1B. • Proposed grading redirects some runoff to the other existing curb inlets along W. Continental Blvd. Q100 Pre-Development=2.08 cfs Q100 Post-Development=0.82 cfs Q100 decreases by 1.26 cfs at DP-1. Design Point 2: Design Point 2 is the existing 10' curb inlet B2 on W. Continental Blvd. Proposed grading redirects some runoff from inlet B2 to inlet B1. Q100 Pre-Development=7.17 cfs Q100 Post-Development=1.72 cfs Q100 Difference=-5.45 cfs The decrease at DP-2 offsets part of the increase at DP-3. Design Point 3: Design Point 3 is the existing 10' curb inlet B1 on W. Continental Blvd. Proposed grading directs additional runoff to this inlet. Q100 Pre-Development=1.57 cfs Q100 Post-Development=10.48 cfs Q100 Increase=8.91 cfs With the decreases at DP-1 and DP-2,the combined 100-year runoff to the west increases by 2.20 cfs. Sheet C8.2 evaluates the existing 18" storm drain and roadway conveyance. Page 2 of 3 Liberty Place Addition 5000 Thompson Terr. AN ANA Project No. 260090 Colleyville,Texas 76034 CONSULTANTS,L-L-C. (817) 335-9900 Design Point 4: Design Point 4 is the eastern overland discharge point, separate from the existing 18" storm drain west of the roadway drainage divide. Q100 Pre-Development=4.57 cfs Q100 Post-Development=4.56 cfs Q100 Difference=-0.01 cfs The existing eastward drainage pattern is maintained, with no increase in runoff at DP-4. Design Point 5: Design Point 5 is the overland discharge to the adjacent neighbor along the western property line. Q100 decreases from 0.62 to 0.48 cfs.The existing drainage pattern is maintained, with no increase in runoff to the adjacent neighbor. Downstream No-Adverse-Impact Assessment: A comparison of pre-development and post-development conditions shows that the 100-year runoff to the west increases from 10.82 cfs to 13.02 cfs, an increase of 2.20 cfs. As shown on Sheet C8.2,the existing 18" storm drain system can convey the 5-year runoff.The excess runoff during the 100-year storm is conveyed within the existing roadway curb and gutter. At westbound Sta. 1+50,the calculated 100-year surface flow increases from 4.64 cfs to 6.24 cfs.The corresponding water depth increases from 0.25'to 0.27', a rise of only 0.02' between pre-development and post-development conditions.The runoff remains within the curb and gutter, and the 0.02' rise is below the 0.10' criterion in iSWM Section 3.3 and Fort Worth Stormwater Criteria Manual Table 3.1. Based on the hydraulic analysis,the proposed increase in runoff can be conveyed by the existing storm drain system and roadway curb and gutter without exceeding the applicable no-adverse-impact criteria. Therefore, on-site detention is not necessary to mitigate downstream drainage impacts. Please contact us if you have any questions. s�F• . .. Y9`111I ill ••�•• ••`r Alex Srur, P.E. �....ALEX.SRUR.......! ANA Consultants, LLC. / :• 127967 �CENS`;�'��'�� 11\ 0���L A.N.A.CONSULTANTS LLC TBPE REGISTERED FIRM NO. F-20 THE SEAL APPEARING ON THIS DOCUMENT WAS AUTHORIZED BY ALEX SRUR, P.E. #127967 ON 11/03/2026 Page 3 of 3