Item 4D - Memo CITY OF Item 4D SOUTH LAKE MEMORANDUM October 30, 2026 To: Alison Ortowski, City Manager From: Pritam Deshmukh, Director of Public Works Subject: Approve an Engineering Services Agreement with Bartlett & West, Inc. to provide engineering design, inspection, and construction phase services for the rehabilitation of the Bicentennial Park Elevated Storage Tank in an amount not to exceed $390,000. Action Requested: Approve an Engineering Services Agreement with Bartlett & West, Inc. to provide engineering design, inspection, and construction phase services for the rehabilitation of the Bicentennial Park Elevated Storage Tank in an amount not to exceed $390,000. Background Information: The Bicentennial Park Elevated Storage Tank (EST) was originally constructed in 1987 and is one of three ESTs providing water supply and pressure to the City's low-pressure plane. This tank was last rehabilitated and recoated in 2006-2007 and is nearing the end of the typical service life of the existing coating system. The City routinely inspects its water storage tanks to monitor the condition of protective coatings and other tank components. Proactive rehabilitation and replacement of protective coating systems safeguards the existing structural steel from corrosion and degradation and helps extend the usable service life of the tank. Under this agreement, Bartlett & West, Inc. will provide engineering design, inspection, bidding, and construction phase services for the rehabilitation of the Bicentennial Park EST. The agreement includes a pre-design condition assessment consisting of visual inspection of the exterior and underwater Remotely Operated Vehicles (ROV) inspection of the interior; preparation of plans and specifications for interior and exterior recoating and other necessary tank repairs or modifications; coordination with franchise utilities and City departments to minimize impacts to service during construction; resident construction inspection services to verify surface preparation, coating application, welding, and other rehabilitation work meet applicable industry standards; coordination with the Federal Aviation Administration (FAA), including any required permitting; and bidding and construction administration services. Page 1 of 3 Item 4D Coordination for the art elements is also included in the scope of services. City Council previously provided direction for the graphics to be incorporated into the project. Bartlett & West will incorporate the approved graphics into the construction documents, including preparation of scaled layout drawings showing artwork placement, orientation, reference points, and coordination of colors and materials. The agreement for these services is not to exceed $390,000. This project is aligned with Comprehensive Plan Objective 10.6. The tank inspection is anticipated to be completed during winter 2026-2027, with design completed by summer 2027. Franchise coordination is expected to begin in Spring 2027 and be completed prior to bid opening in Fall 2027. Construction is anticipated to begin during the lower water-demand season in late 2027/early 2028 to minimize impacts to the water supply. Financial Considerations: This ESA is not to exceed $390,000. Funding for this agreement is budgeted in the approved FY 2026 Utility Fund. This award is under the approved project funding of $525,000 allocated for the engineering design. These services include tank inspection and cleaning, rehabilitation design, engineering services, construction phase services, resident project inspection, and franchise utility coordination. Staff consider the proposed engineering fee of$390,000, reasonable based on the scope of services and anticipated level of effort required for the project. Approximately $198,000 is allocated for 14 weeks of full-time resident construction inspection, including anticipated overtime for extended workdays and potential weekend work. For comparison, the Florence EST Rehabilitation Project included approximately $168,000 for 12 weeks of similar inspection services under the same consultant. The remaining fee covers tank condition assessment, rehabilitation design, franchise utility and FAA coordination, bidding, construction administration, and other associated engineering services. Strategic Link: This item links to the City's Strategy Map strategic focus area of Infrastructure and Development. It specifically relates to the City's Objective, F2: Investing to Provide and maintain High-Quality Public Assets. Citizen Input/ Page 2 of 3 Item 4D Board Review: No formal citizen input or board review has been completed for this item. City Council previously provided direction regarding the graphics for the Dove and Bicentennial Park Elevated Storage Tanks. The approved graphic concepts will be incorporated into the construction documents consistent with Council direction and the City's established branding and standards. Legal Review: The proposed agreement is a standard agreement that the City Attorney has reviewed and approved. Alternatives: The City Council may approve or deny the agreement. Staff Recommendation: Approve an Engineering Services Agreement with Bartlett & West to provide engineering design, inspection, and construction phase services for Repainting of the Bicentennial Park Elevated Storage Tank in an amount not to exceed $390,000. Supporting Documents: Attachment A: Engineering Services Agreement Staff Contact: Pritam Deshmukh, P.E., Director of Public Works Jeff Ginn, P.E., City Engineer Jimmy Sibert, P.E., Deputy City Engineer Josue Hernandez, P.E., Civil Engineer Page 3 of 3 Attachment A AGREEMENT FOR ENGINEERING SERVICES THIS Agreement for Engineering Services, hereinafter referred to as the "Agreement" is made this day of , 2026 by and between the City of Southlake, Texas (hereinafter referred to as "CITY"), and BARTLETT & WEST, INC. (hereinafter referred to as "ENGINEER") referred herein individually as, the "Party," and collectively as, the "Parties.". WHEREAS, CITY contemplates the need to inspect by drone the Bicentennial Elevated Water Tank and issue plans and specifications for the rehabilitation/coating along with construction observation/inspections., this project is to be known as Bicentennial Elevated Water Tank and hereinafter referred to as the "Project". WHEREAS, ENGINEER is qualified, able, and desirous of performing the necessary engineering work upon which the Project is based and is willing and able to work with CITY staff to organize and coordinate the engineering services necessary to complete the Project. NOW, THEREFORE, CITY engages ENGINEER to perform, and ENGINEER agrees to perform, the engineering work for the Project, as more fully described herein below, and CITY agrees to pay as compensation, and ENGINEER agrees to accept as compensation, the payments on the dates and in the amounts herein specified, all in accordance with the terms more fully set out below and as provided in Attachment A, which are attached hereto and incorporated by reference as if fully set forth herein. I. ARTICLE ENGINEERING SERVICES A. Scope of Work ENGINEER will provide the supervision, direction, personnel and equipment to perform the engineering Services outlined in Attachment A in accordance with the terms set forth in this Agreement and in Attachment A. B. Personnel ENGINEER hereby represents to CITY: 1. That it has all personnel required in performing the Services under this Agreement; 2. That all of the Services required hereunder will be performed by ENGINEER or under ENGINEER's supervision; and 3. That all personnel engaged in the Services shall be qualified to perform such services in a reasonably prudent manner and in accordance with Article VI—Standard of Care of this Agreement. C. Definitions "Services" shall refer to the professional services performed by ENGINEER pursuant to this Agreement. D. Changes The CITY may, without invalidating this Agreement, issue written orders to make changes within the general scope of the work including additions, deletions, or modifications to the work to be performed. If any change results in an increase or decrease in the ENGINEER's cost, or the time required to perform any portion of the Services under this Agreement, the Parties shall, by written mutual agreement, make an equitable adjustment, and this Agreement shall be amended in writing accordingly. E. Coordination with Owner Upon receiving a written request by ENGINEER, the CITY shall make available to ENGINEER for use in performing Services herein all existing plans, maps, field notes, statistics computations and other data in the CITY's possession relative to existing facilities and to the Project. F. Site and Local Conditions 1. ENGINEER has the right to examine the site in order to become acquainted with local conditions and accepts conditions at the site, "as-is", unless otherwise prevented by a force majeure event and is noted in writing to the CITY. 2. Any coordination or scheduling of work by CITY shall not relieve ENGINEER from its responsibilities specified herein. G. Assignment and Subcontractors/Third Party Rights 1. The interests, rights, and obligations covered herein are personal to each Party hereto and not to any third party and for this reason neither this Agreement nor any contract hereunder shall be assigned, conveyed, or transferred by either Party in whole or in part; nor shall ENGINEER subcontract any of its obligations under this Agreement without the prior written consent of CITY, which may be withheld at the CITY's sole discretion. 2. Any attempted assignment, conveyance, transfer, or delegation in violation of this provision shall be null and void and shall constitute a material breach of this Agreement. In the event of an assignment by ENGINEER to which the CITY has consented, the assignee or the assignee's legal representative shall agree in writing with the CITY to personally assume, perform, and be bound by all the covenants, terms, obligations, and agreements contained in this Agreement. H. Independent Contractor 1. ENGINEER covenants and agrees that it will perform the work hereunder as an independent contractor, and not as an officer, agent, servant, employee, or otherwise under the control of CITY. 2. ENGINEER shall have exclusive control of and exclusive right to control the details and manner of the Services performed herein, and all persons performing same. 3. ENGINEER shall be solely responsible for the acts and omissions of its officers, agents, employees, contractors, subcontractors, sub-subcontractors, and consultants; the doctrine of respondent superior shall not apply as between CITY and ENGINEER, its officers, agents, employees, contractors, subcontractors, sub-subcontractors, and consultants, and nothing herein shall be construed as creating a partnership or joint enterprise between CITY and ENGINEER. I. Disclosure 1. ENGINEER warrants to CITY that it has made full disclosure in writing of any existing conflicts of interest or potential conflicts of interest, including personal financial interests, direct or indirect, in property abutting the proposed Project and business relations with abutting property owners. 2. ENGINEER warrants that it shall make full disclosure in writing of any conflicts of interest that arises after execution of this Agreement and before final payment under the contract is made. Such disclosure shall be provided to CITY within seven (7) days of ENGINEER's discovery of the conflict. Finally, Engineer warrants that it has submitted to the City a completed Conflicts of Interest Questionnaire as required by Chapter 176 of the Texas Local Government Code. J. Approval by CITY 1. Approval by CITY of this Agreement shall not constitute or be deemed to be a release of the responsibility and liability of ENGINEER, its officers, agents, employees, subcontractors, sub-subcontractors for the accuracy and competency of the Services performed under this Agreement, including but not limited to surveys, designs, working drawings and specifications and other engineering documents. 2. Such approval shall not be deemed to be a waiver or an assumption of such responsibility and liability by CITY for any negligent act, error, or omission in the performance of ENGINEER's engineering services or in the conduct or preparation of the subsurface investigations, surveys, designs, working drawings and specifications or other engineering documents by ENGINEER, its officers, agents, employees, subcontractors, and sub-contractors. K. Indemnification IN ACCORDANCE WITH TEXAS LOCAL GOVERNMENT CODE SECTION 271.904, THE ENGINEER SHALL HOLD HARMLESS AND INDEMNIFY THE CITY FROM ALL CLAIMS AND LIABILITY FOR DAMAGES ARISING OUT OF OR IN CONNECTION WITH THIS AGREEMENT TO THE EXTENT THAT THE DAMAGE IS CAUSED BY OR RESULTS FROM AN ERROR, OMISSION, ACT OF NEGLIGENCE, INTENTIONAL TORT, INTELLECTUAL PROPERTY INFRINGEMENT, OR FAILURE TO PAY A SUBCONTRACTOR OR SUPPLIER COMMITTED BY ENGINEER OR THE ENGINEER'S AGENT, CONSULTANT UNDER CONTRACT, OR ANOTHER ENTITY OVER WHICH THE ENGINEER EXERCISES CONTROL. FOR CLAIMS OR LIABILITIES COVERD BY ENGINEER'S PROFESSIONAL LIABILITY POLICY, THE ENGINEER SHALL REIMBURSE (RATHER THAN DEFEND) THE CITY FOR ANY AND ALL LEGAL COSTS AND EXPENSES, INCLUDING REASONABLE ATTORNEYS' FEES WHICH ARE INCURRED BY THE CITY IN LITIGATION OR OTHERWISE RESISTING SAID CLAIM OR LIABILITIES, WHICH ARE INCURRED BY, CHARGED AGAINST, OR IMPOSED ON THE CITY AS THE RESULT OF SUCH NEGLIGENT, INTENTIONAL TORT ACTS OR OMISSIONS BY THE ENGIENEER IN PROPORTION TO THE ENGINEER'S LIABILITY. NEITHER CITY NOR ENGINEER WAIVE ANY LEGAL CONTENTIONS, DEFENSES, OR IMMUNITIES, INCLUDING, BUT NOT LIMITED TO GOVERNMENTAL (I.E., SOVEREIGN) IMMUNITY. THIS PROVISION SHALL SURVIVE THE EXPIRATION OR TERMINATION OF THIS AGREEMENT. L. No Third-Party Beneficiary For purposes of this Agreement, including its intended operation and effect, the Parties expressly agree and contract that: i. This Agreement governs only the rights, obligations, and disputes between the CITY and ENGINEER and is in no way intended to confer any rights, benefits, benefit or remedies upon any third party or entity, except as expressly provided for indemnitees identified in Article I, Section K., above, ii. Nothing in this Agreement shall be construed to release, waive, or diminish any obligation or liabilities that any third party or entity may owe to the CITY or ENGINEER under contract, statute, or common law. The Parties expressly disclaim any intent to create third-party beneficiary rights under this Agreement. M. Successors and Assigns CITY and ENGINEER each bind themselves and their successors, executors, administrators, and assigns to the other Party to this Agreement and to the successors, executors, administrators and assigns of such other Party with respect to all rights, covenants, duties, and obligations of this Agreement. II. ARTICLE CITY'S RESPONSIBILITIES CITY shall undertake and perform the following obligations in accordance with this Agreement set forth herein: 1. The CITY shall provide ENGINEER with complete and accurate information regarding the CITY's Requirements for the Project as reasonably necessary for the ENGINEER to perform its Services under this Agreement. For purposes of this Agreement, "Requirements" shall mean all written specifications, standards, criteria, objectives, constraints, and other directives necessary to define the scope, design, and performance expectations of the Project. All such requirements shall be provided in writing; 2. The CITY shall assist the Engineer by making available all information within the CITY's possession or control that is relevant to the Project. Such information shall include, without limitation, executed right-of-way easements and final field survey data; 3. The CITY shall review all work submitted by ENGINEER and shall provide a written response to such submission within reasonable time of receipt; 4. The CITY shall bear and pay all costs associated with advertising for the solicitation of bids or proposals from Contractors; 5. The CITY shall provide prompt written notice to ENGINEER upon observing, or otherwise becoming aware of, any defect in ENGINEER's work or in Contractor's work; 6. The CITY shall designate, in writing, an individual to serve as its authorized representative under this Agreement. Such representative shall have full authority to transmit instructions, receive information, and make or interpret decisions on behalf of the CITY; 7. Provide all information and criteria as to the CITY's requirements, objectives, and expectations for the Project including all numerical criteria that are to be met and all standards of development, design, or construction. 8. The CITY shall provide to the ENGINEER all existing studies, plans, and other documents related to the Project, as well as new data reasonably deemed by the ENGINEER, including but not limited to site survey, engineering data, environmental impact assessments or statements, and applicable zoning or land use regulations. The ENGINEER shall be entitled to rely upon the information provided by the CITY; however, the CITY makes no representation or warranty as to the accuracy or completeness of such information and shall not be liable for any errors, omissions, or inaccuracies contained therein. The ENGINEER shall exercise reasonable diligence to independently verify the accuracy and applicability of all information provided by the CITY prior to its use in performing Services under this Agreement; 9. The CITY shall arrange and secure access to the Project site and any other private or public property as reasonably necessary for the ENGINEER to perform its Services under this Agreement. 10. The CITY shall provide any additional information or assistance as may be specified in the Attachments to this Agreement, if and to the extent applicable. All Attachments referenced herein are hereby incorporated by reference and made a part of this Agreement as if fully set forth herein. In the event of any conflict or inconsistency between the terms of this Agreement and the terms of any Attachment, the terms of this Agreement shall control and govern. III.ARTICLE COMPENSATION FOR ENGINEERING SERVICES The CITY shall compensate ENGINEER for services performed under this Agreement, in accordance with the following: For the completion of the work described in Article I, the ENGINEER shall be paid on a lump sum basis in the amount of$390,000 for services outlined in Attachment A and satisfactorily performed.. Payment shall be contingent upon the CITY's satisfactory completion of all services described in Article I and AttachmentA attached hereto, and submission of proper invoices to the CITY. This Agreement is also contingent upon the appropriation of funds by the City of Southlake, Texas. All payments by the CITY under this Agreement, including any provision in the Agreement relating to penalties, overages, interest, collections, or any other additional costs, shall be subject to and conditional upon the annual appropriation of public funds budgeted for the specific purposes of the Agreement in accordance with the City Charter and Texas law. The CITY shall make a good faith effort to appropriate funds in accordance with Texas law. If funds are not appropriated for any fiscal year during the term of this Agreement, the CITY may terminate this Agreement without penalty or further obligation. IV. ARTICLE TIMES OF BILLING AND PAYMENT The ENGINEER shall submit invoices to the CITY on a monthly basis for any services and reimbursable expenses incurred in accordance with the work performed, subject to the limits set forth in Article III. Each invoice shall be properly prepared, accurate, and accompanied by such supporting documentation, records, or other written proof as CITY may reasonably require to verify the amounts billed. The CITY shall have no obligation to pay any invoice that is incorrect, incomplete, or unsupported by adequate documentation. Failure by the ENGINEER to provide the required documentation with an invoice shall constitute a waiver of the ENGINEER's right to payment for the amounts billed in that invoice. Payment of approved invoices shall be made within thirty (30) days after the CITY's receipt and acceptance of a correct and properly documented invoice. All invoices shall be delivered to the CITY's Finance Department at 1400 Main Street, Suite 420, Southlake, Texas 76092. The CITY reserves the right to withhold payment for any disputed charges until such dispute is resolved to the CITY's satisfaction. Any invoice submitted more than ninety (90) days after the date the Services were performed shall be deemed invalid, and the ENGINEER shall waive any right to payment for such Services. If CITY fails to make any payment due to ENGINEER within thirty (30) days of the day after such payment becomes due under this Agreement, the ENGINEER shall provide written notice to the CITY of the delinquent amount. Interest shall begin to accrue on the unpaid balance only if the CITY fails to remit payment within ten (10) days after receipt of such payment. ENGINEER shall be entitled to interest on unpaid amount at the rate specified in Chapter 2251 of the Texas Government Code, as amended. V.ARTICLE ADDITIONAL ENGINEERING SERVICES In addition to performing the engineering services described in Article I of this Agreement, ENGINEER shall perform such additional services as the CITY may request from time to time, provided that no additional services shall be undertaken without the CITY's prior written authorization. The CITY shall compensate ENGINEER for such authorized services at rates and terms mutually agreed upon in writing by the Parties, based on actual time expanded and actual out-of-pocket expenses incurred. Any additional services performed without the CITY's prior written authorization shall be deemed unauthorized and shall not be subject to compensation. Such additional services may include, but are not limited to the following: 1. Make or prepare detailed description of sites, maps, or drawings related thereto and outside the scope of the Project; 2. Appearances before courts or boards on matters of litigation or hearings related to the Project; 3. Preparation of environmental impact assessments or statements for any governmental entity or agency; 4. Miscellaneous engineering work for CITY not related to the Project; 5. To provide resident project construction inspection, unless such inspection is not required, in writing, by the CITY; and 6. Other services agreed to by the parties in writing and incorporated herein. VI. ARTICLE STANDARD OF CARE Pursuant to Texas Local Government Code §271.904(d), the ENGINEER will perform its engineering services with the professional skill and care ordinarily provided by competent engineers, practicing under the same or similar circumstances and professional license, and will perform engineering services as expeditiously as is prudent considering the ordinary professional skill and care of a competent engineer and in accordance with any other applicable governmental laws, regulations, and ordinances. VIL ARTICLE PERIOD OF SERVICE This Agreement shall be effective upon execution by CITY and ENGINEER, and shall remain in force until work is completed on the Project or until terminated under the provisions hereinafter provided in Article VIII. VIII.ARTICLE TERMINATION & CLAIMS A. The CITY may terminate this Agreement at any time for convenience, with or without cause by giving written notice to the ENGINEER. Such termination may be made effective on such future date as agreed by the parties, but absent such agreement shall be immediate. Upon receipt of such notice, the ENGINEER shall immediately cease all services and work under this Agreement, including the placement of any orders or the execution of contracts for supplies, assistance, facilities, or materials related to its performance. The ENGINEER shall promptly take all necessary steps to cancel any existing contracts to the extent they are attributable to this Agreement. B. The ENGINEER, upon termination, shall be paid for all services rendered through the date of termination together with any additional reimbursable expense then due in accordance with Article IV. C. Any claim, dispute, or other matter in question arising out of or related to this Agreement shall be subject to mediation by mutual written agreement of the Parties but shall not be a condition precedent to litigation in a court of competent jurisdiction. The Parties shall share the mediator's fee and filing fees equally. The mediation shall be held in the place where the Project is located, unless another location is mutually agreed upon. D. The CITY and ENGINEER shall commence all claims and causes of action against the other and arising out of or related to this Agreement, whether in contract, tort, or otherwise, in accordance with applicable law. E. The Parties hereby acknowledge and agree that the CITY is entering into this Agreement pursuant to its governmental functions and that nothing contained in the Agreement shall be construed as constituting a waiver of the CITY's governmental immunity from suit or liability, which is expressly reserved to the extent allowed by law. Notwithstanding anything to the contrary herein, the Parties hereby acknowledge and agree that to the extent this Agreement is subject to the provisions of Subchapter I of Chapter 271, Texas Local Government Code, as amended, the CITY's immunity from suit is waived only as set forth in Subchapter I of Chapter 271 Texas Local Government Code. Further, the Parties agree that this Agreement is made subject to all applicable provisions of the Texas Civil Practice and Remedies Code ("CPRC"), including but not limited to all defenses, limitations, and exceptions to the limited waiver of immunity from liability provided in CPRC Chapter 101 and Chapter 75. F. The CITY expressly reserves its legislative and municipal police power in accordance with the laws of the State of Texas. Any provision, term, or condition in the Contract requiring CITY to waive its rights under Texas or Federal Constitution, or under any foreign law(s), or limiting the claims or remedies available to CITY, or requiring settlement of claims through binding mediation or arbitration are void and shall be given no effect. IX. ARTICLE OWNERSHIP OF DOCUMENTS A. All reports, whether completed or partially completed, prepared under this Agreement including the original drawings, designs, specifications, and related documents in both paper and electronic formats—shall become the property of CITY upon termination of this Agreement and upon payment of undisputed amounts in accordance with this Agreement. Upon full performance and payment under this Agreement, all final design, drawings, specifications and related documents, in both paper and electronic formats, shall be the sole and exclusive property of CITY. B. Any reuse, modification, or alteration of such documents by CITY, or by any party acting on behalf of CITY, without the prior written consent of ENGINEER, shall be undertaken at CITY's sole risk and responsibility. ENGINEER shall have no liability arising from such unauthorized reuse, modification, or alteration. C. Any reuse by ENGINEER will be at ENGINEER's sole risk and without liability or legal exposure to CITY, and ENGINEER shall indemnify and hold harmless CITY from all claims, damages, losses, and expenses including reasonable attorneys' fees arising out of or resulting therefrom. D. Upon payment of undisputed amounts in accordance with this Agreement, the ENGINEER hereby assigns to CITY all rights, title, and interest in and to any intellectual property created, developed, or produced in connection with the performance of this Agreement, including but not limited to copyrights, design rights, and any other proprietary rights in the deliverables. The ENGINEER shall execute any documents and take any actions reasonably necessary to perfect such assignment. E. The ENGINEER retains no rights to use, reproduce, or distribute any deliverables or intellectual property created under this Agreement, except with the prior written consent of CITY. Any pre-existing intellectual property of the ENGINEER incorporated into the deliverables shall remain the property of the ENGINEER; however, upon payment of all undisputed amounts in accordance with this Agreement, the ENGINEER grants CITY a perpetual, irrevocable, royalty-free license to use, reproduce, modify, and distribute such pre-existing materials solely for purposes related to the deliverables. X.ARTICLE INSURANCE A. ENGINEER shall carry and maintain at all times relevant hereto, at ENGINEER's expense, insurance of the type and of minimum coverage limits as follows: 1. Workers Compensation - Statutory Employer's Liability - Limits as required by the State of Texas. 2. Comprehensive General Liability, Bodily Injury and Property Damage including contractual liability in a combined single limit- $500,000 per occurrence. 3. Comprehensive Automotive Liability, Bodily Injury and Property Damage in a combined single limit- $1,000,000 per accident. a. ENGINEER shall provide Certificates of Insurance for the above coverage in a form acceptable to CITY, evidencing the coverage required above, shall be provided to CITY within ten (10) business days after execution of this Agreement and prior to issuing Notice to Proceed. Such certificates shall provide that the insurer will give CITY not less than ten (10) days notice of any material changes in or cancellation of coverage. In the event any subcontractor of ENGINEER, with CITY's consent, provides or renders services under this Agreement, ENGINEER shall ensure that the subcontractor's services are covered by the same insurance limits as set forth above. b. ENGINEER shall not commence work under this Agreement until it has obtained Professional Liability (Errors and Omissions) Insurance as required herein and such insurance coverage has been approved by CITY. Such insurance shall be in the minimum amount of $1,000,000 per claim and in the aggregate. The insurance coverage described herein shall be maintained until two (2) years after CITY's acceptance of the Project and shall not be canceled without prior written notice to CITY. Upon execution and return of this Agreement by ENGINEER, ENGINEER shall furnish CITY with a Certificate of Insurance evidencing that the insurance coverage required under this Agreement has been obtained. The Certificate shall state that such insurance shall not be cancelled, non-renewed, or incur a reduction of coverage without providing CITY thirty (30) days prior written notice. ENGINEER shall notify CITY within ten (10) days of any reduction of coverage as required by this agreement in such Professional Liability (Errors and Omissions) Insurance. B. ENGINEER further agrees to name CITY as an additional insured under ENGINEER's general liability insurance policy and provide any defense provided by the policy to CITY as permitted by Texas Local Government Code §271.904(c). XI. ARTICLE AUTHORIZATION, PROGRESS AND COMPLETION CITY and ENGINEER agree that the Project is planned to be completed as expeditiously as is prudent considering the ordinary professional skill and care of a competent engineer. ENGINEER shall employ manpower and other reasonably necessary resources, and use professional skill and diligence to meet the schedule; however, ENGINEER shall not be responsible for schedule delays resulting from a force majeure event. The Project schedule may be modified during the course of the Project by written mutual agreement between CITY and ENGINEER. If any such modification impacts ENGINEER's compensation, the compensation shall be adjusted accordingly, subject to CITY's prior written approval. However, no adjustment to compensation shall be made for modifications or changes resulting from a force majeure event. A. It is understood that this Agreement contemplates services for this Project as described in this Agreement, including any and all Services necessary to complete the work. Any authorization by CITY for additional Engineering Services, shall be in writing and shall specify: i. The scope and definition of the services to be performed; ii. The schedule for commencing and completing such services; and iii. The agreed-upon basis for compensation between CITY and ENGINEER. XII. ARTICLE NOTICE Any notice required under this Agreement will be in writing and given either personally, by certified mail, return receipt requested, or by a nationally recognized overnight courier service, addressed to the parties as follows: If to CITY: Alison Ortowski City Manager City of Southlake 1400 Main Street, Suite 460 Southlake, Texas 76092 Phone: 817-748-8400 Fax: 817-748-8010 If to ENGINEER: Lee Halencak Senior Project Manager/Practice Builder Bartlett &West, Inc. 4500 Mercantile Plaza, Suite 230 Fort Worth, TX 76137 817-840-1563 lee.halencak@bartwest.com All notice shall be effective upon the date of receipt. XIII.ARTICLE SEVERABILITY In case any one or more of the provisions contained in this Agreement shall for any reason be held by a tribunal with jurisdiction over this Agreement to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability shall not affect any other provisions thereof and this Agreement shall be construed as if such invalid, illegal, or unenforceable provision had never been contained herein. XIV. ARTICLE VENUE & GOVERNING LAW The obligations of the Parties to this Agreement shall be performable in Tarrant County, Texas and if legal action is necessary in connection with or to enforce rights under the Agreement, exclusive venue of any suit or cause of action under this Agreement shall in Tarrant County, Texas. This Agreement shall be governed by and construed in accordance with the laws and court decisions of the State of Texas, without regard to conflict of law or choice of law principles of Texas, or any other state or country. XV.ARTICLE FORCE MAJEURE Neither CITY or ENGINEER shall be liable for failure to perform their obligations under this Agreement if the performance is delayed or prevented by reason of war; civil commotion; Acts of God; inclement weather; epidemics; pandemics; governmental restrictions, regulations, or interferences; strikes; lockouts; national disasters; riots; material or labor restrictions; transportations problems; or any other circumstances which are reasonably beyond the control of the Party. Such Party's performance shall be excused for the length of time the force majeure event(s) last, provided that Party makes a reasonable attempt to resume performance upon conclusion of the force majeure event, unless such performance has become legally impossible, in which case that Party may terminate this Agreement. XVL ARTICLE TEXAS PUBLIC INFORMATION ACT NOTICE All information, documents, and communications relating to this Agreement shall be subject to the Texas Public Information Act ("Act") and any opinion of the Texas Attorney General or a court of competent jurisdiction relating to the Act. The requirements of Subchapter J, Chapter 552, Texas Government Code, may apply to this Agreement and ENGINEER agrees that the Agreement may be terminated if the ENGINEER knowingly or intentionally fails to comply with a requirement of that subchapter. In accordance with the Act, the Consultant agrees to: 1. Preserve all contracting information related to the Agreement as provided by the records retention requirements applicable to the CITY for the duration of this Agreement; 2. Promptly provide to the CITY any contracting information related to this Agreement that is in the custody, possession, or control of the ENGINEER on request of the CITY; and 3. On the completion of this Agreement, either: a. Provide at no cost to the CITY, all contracting information related to this Agreement that is in the custody, possession, or control of the ENGINEER; or b. Preserve the contracting information related to this Agreement as provided by the records retention requirements applicable to the city. IN WITNESS WHEREOF the parties have caused this Agreement to be executed in two equal originals on the date and year first above mentioned. CITY OF SOUTHLAKE, TEXAS: By: Shawn McCaskill, Mayor ATTEST: By: City Secretary ENGINEER: BARTLETT & WEST, INC By: Lee M. Halencak, P.E. Sr. Project Manager THE STATE OF TEXAS § COUNTY OF TARRANT § Before me on this day personally appeared known to me [or proved to me on the oath of or through (description of identity card or other document)] to be the person whose name is subscribed to the foregoing instrument and that he/she is the duly authorized of , and acknowledged to me that he/she executed the same for the purposes and consideration therein expressed. Given under my hand and seal of office this day of , A.D. (SEAL) Notary Public, State of Texas Notary's Name Printed BARTLETT & WEST,INC. SCOPE OF WORK- CITY OF SOUTHLAKE BICENTENNIAL PARK ELEVATED TANK ASSESSMENT/DESIGN REHABILITATION AND CONSTRUCTION OBSERVATION The Consultant shall perform services for the purpose of Assessing the City's 1.5-million-gallon Bicentennial Park Elevated water storage tank by use of underwater ROV. Upon completion of condition assessment, plans and specifications will be developed based on ROV findings for rehabilitation. The scope of work associated with the Project includes: interior inspection of Bicentennial Park EST utilizing a remotely operated vehicle (ROV) and visual methods, exterior inspection utilizing visual methods, compiling and submitting to the Client a detailed inspection, development of a project manual, construction plans, graphics design and details (as necessary), and specifications for tank rehabilitation,bidding phase services,construction phase services,and construction observation: 1. Project Administration i. Perform routine project management and administration of the inspection and design contract including project initiation, invoices, team meetings, project tracking, monthly status reports, etc. ii. Coordination with Client staff and other stakeholders concerning scope, design objectives, and design review. Designate point of contracts between B&W and city departments. iii. Prepare for and attend up to three (3) City Council and/or Stakeholder Meetings to discuss the project as identified below: 1. Project Scope and Professional Services Agreement 2. Bid Results and Notice of Award 3. Public Meetings 2. Tank Assessment i. Conduct initial tank assessments with City staff to identify preliminary rehabilitation recommendations. Assessment will consist of visual evaluation of the exterior of tank, and visual and ROV evaluation on the interior of the tank. Evaluation with the ROV will allow the tank to remain in service during the inspection period. ROV is unable to inspect the riser. ii. During assessment,city has staff on site to assist in exercising valves and allowing access to process piping for visual evaluation. iii. Process ROV footage and provide a condition assessment and report of findings and recommendations to the City. 3. Bicentennial Park EST Rehabilitation Design i. Review condition assessment report for the Bicentennial Park elevated storage tank (EST) and create list of rehabilitation items to be included in the Project Manual/contract documents. Visit the Bicentennial Park EST site to determine if any additional rehabilitation items require inclusion into the Project Manual/contract documents. ii. Create project plan sheets (8.5"xl l" or 11"xl7") as needed for inclusion into the Project Manual. Plan sheets may consist of one or more of the following sheets as necessitated by project scope. 1. Location Map 2. Site Plan with Site Modifications 3. Original Construction Submittal Drawings for Bidder's Reference 4. Design Details 5. Photographs iii. Graphic Consultation will include guidance on do's/don'ts for graphic design/color/bleed/material and size. Graphic Layout Plan Sheets- to include artwork layout and placement on the tank (scaling, orientation, reference points) and incorporation of the selected artwork into the final contract documents. Coordination with City selected artist/vendor for final alignment and material compatibility. iv. Coordinate with city staff and vendor on mixing system to determine the size and the proper equipment to be included in the bidding documents. v. Develop Technical Specifications for recoating and rehabilitating the water storage tanks. Project technical specifications will be developed based on the following assumed rehabilitation work scope items: 1. Recoat or Overcoat the tank exteriors, including coating with HydroFlon. 2. Recoat the tank interiors,including blasting and coating with a zinc,epoxy, epoxy coating system. 3. Other minor tank repairs and modifications. vi. Develop Contract Documents for use in bidding and contracting the proposed recoating and rehabilitation. vii. Perform quality assurance/quality control reviews of the work as it progresses and make any necessary revisions. Review the project deliverables with City and other stakeholders and make any necessary revisions. viii. Coordinate with the Federal Aviation Administration(FAA)as required and obtain any necessary permits from the FAA for the rehabilitation work to be completed. ix. Coordinate with franchise utilities as needed, including the coordination of temporary facilities at the tank site in order for the franchise utilities to continue providing service to customers. The location of any temporary facilities shall also be coordinated with the Contractor in order to minimize any impacts to their operations. x. Coordinate with City departments as needed,for relocation of city radio equipment to a temporary site. xi. Submit review copies of project plan sheets, technical specifications, and the Project Manual to City staff for review and comment on the following design milestones: 1. 30% design completed 2. 60% design completed 3. 90% design completed 4. 100% design completed xii. Make final revisions to the Project Manual. Following final approval, one (1) electronic copy (PDF format) of the Project Bid Manual shall be provided to the City. 4. Engineering Administration Services during Bidding Phase i. Administer the process of advertising the project, including electronically advertising the project on the City's procurement platform and on a third-party platform such as Civcast. ii. Conduct a Pre-Bid Meeting at City's office with prospective bidders, and answer any questions asked during this conference. iii. Continue to answer questions from prospective bidders until the deadline noted in the Project Manual and issue any addenda necessary in order to clarify or correct any items in the Project Manual. iv. Attend Bid Opening at City's office. v. Tabulate and evaluate bids received based on best value and prepare a Recommendation of Award Letter. Send copies of the bid tabulations and Recommendation of Award Letter to City staff. 5. Engineering Administration Services during Construction Phase i. Administer the process of preparing the construction contract for execution. ii. Conduct a Pre-Construction Conference at City's office with representatives of the City and the Contractor present. iii. Review shop drawings/submittals from Contractor for compliance with specifications. iv. Review Contractor's monthly partial payment requests. v. Prepare and administer project change orders, as needed. vi. Interpret Contract Documents when requested by the City or the Contractor. vii. Revise contract drawings, based upon information provided by the contractor, to show the work that was constructed. Furnish a set of these revised drawings to the City and other agencies,as required.Documents furnished to the City will typically include PDFs, CAD files, and hard copies (if requested). These are not certified as as-built plans but will be record drawings as signed by the contractor. viii. Assist the City in obtaining final acceptance of the project by TCEQ, if required. ix. Perform and administer contract closeout upon completion of construction. 6. Construction Observation i. Make up to three (3) visits to the site to observe the progress of construction and to determine, in general, if the work is proceeding in accordance with the contract documents. This observation should not be in lieu of work performed by the City's inspectors or Resident Project Representatives (RPRs)but will be more general in nature. ii. Document observations and construction progress from each site visit in an observation report and furnish to the City if requested. iii. Accompany City staff on their final inspection of the project for compliance with the contract documents. iv. Accompany City staff on the twenty-three (23) month warranty inspection of the project and document any warranty issues that shall be corrected by the Contractor per the contract documents. 7. Resident Project Representation i. Provide a full-time Resident Project Representative (RPR) to perform inspection services on the Contractor's work. ii. Estimated duration that RPR services will be required is approximately 14 weeks. 15 hours of overtime per week is included in these 14 weeks. If overtime is not used, then the 14 weeks can be extended until monies are expired. iii. RPR shall be fully trained and certified to inspect all areas of work, including welding (Certified Welding Inspector is not included), surface preparations, and application of each layer of the coating system. This includes but is not limited to certification as an Association for Materials Protection and Performance (AMPP) Coatings Inspector (formerly governed by NACE and SSPC), and contractor to provide a certification as a Certified Welding Inspector (CWI) through the American Welding Society for the RPR review. 8. Design Coordination i. Attend meetings and coordinate with franchise utility providers and others, including sharing of files and other documents, as requested by City. This includes 10 meetings. 9. Exclusions i. Attending City Council Meetings beyond those mentioned in Section B.1. above. ii. Field and topographical surveys, including the establishment of control points and benchmarks. iii. Deed research and legal descriptions for easements. iv. Easement acquisition assistance. v. Permitting not specifically defined above. vi. Geotechnical investigation of the project site. vii. Environmental, archeological, and cultural evaluations of the project site. viii. Assistance in obtaining project financing, grants, and loans. ix. Construction Staking of Right-of-Way lines,property lines, and easements. x. Full-time construction observation services beyond those mentioned above. xi. Services following construction contract closeout during the warranty period of the project other than those mentioned above. xii. Services resulting from significant changes in the scope, extent,or character of the portions of the Project designed or specified by the Consultant including, but not limited to, changes in size, complexity, Client's schedule, character of construction, and method of financing. These services may also be as a result of changes in laws or regulations after the signing of this Agreement or other causes beyond the Consultant's control. xiii. Serving as a consultant or witness for the Client in any litigation,arbitration,and/or other dispute resolution process related to the Project. xiv. Requirements and/or preparation of applications, documents, and reports for grants. xv. Additional and extended services during construction made necessary by(1)work damaged by fire or other cause during construction, (2) a significant amount of defective or neglected work by any contractor, (3) acceleration of the progress schedule involving service beyond normal working hours, (4) default by any Contractor, (5) significant delays, changes, or price increases caused directly or indirectly by shortages of materials, equipment, or energy, and (6) failure of the Contractor to complete the work within the assumed construction contract time. xvi. Special services in connection with partial utilization of any part of the Project by Client prior to substantial completion. xvii. Review of more than two (2)resubmittals of each shop drawing/submittal. xviii. Evaluation of unusually complex or unreasonably numerous claims submitted by the Contractor and/or others in connection with the work. xix. Other services performed by the Consultant not otherwise provided for in this Agreement. SUMMARY OF COSTS 1. Lump Sum fee for design and construction administration services for the Bicentennial Park Elevated Tank Inspection/Design/Rehabilitation and construction inspection/observation of $390,000.00 distributed between scope elements as follows: Project Administration and Management $9,606.00 Tank Inspection $18,417.00 Rehabilitation Design Plans and Spec &Franchise Coord. $95,876.00 Bidding Administration $11,726.00 Construction Administration $16,523.00 Construction Observation $16,527.00 Resident Project Representation(Inspection) $197,640.00 Design Coordination $12,776.00 Design Contingency $10,909.00 Total Eng/Design/Inspection $390,000.00