Item 4C - Memo CITY OF
SOUTH LAKE Item 4C
MEMORANDUM
October 26, 2026
To: Alison Ortowski, City Manager
From: Pritam Deshmukh, Director of Public Works
Subject: Award the construction contract for the Dove Elevated Storage
Tank Rehabilitation Project, to O&J Coatings, Inc in an amount
not to exceed $1,100,000.
Action
Requested: Award the construction contract for the Dove Elevated Storage
Tank (EST) Rehabilitation Project to O&J Coatings, Inc in an
amount not to exceed $1,100,000.
Background
Information: The rehabilitation of an elevated storage tank is a preventative
maintenance service intended to preserve and protect City
infrastructure. This work will extend the service life of the Dove EST,
maintain its appearance, and ensure the City continues to provide
high-quality public assets.
The Dove EST was originally constructed in 1986 and last repainted
in 2007. Protective coating systems on elevated storage tanks are
typically renewed approximately every 20 years as part of routine
preventative maintenance. With the tank approaching this
maintenance interval, the City is proceeding with rehabilitation to
preserve the existing structural steel, protect against corrosion, and
extend the service life of the 1.5-million-gallon tank.
To prepare for this rehabilitation, the City executed an engineering
services agreement with Bartlett &West, Inc. in December 2025 that
includes on-site inspection services to ensure proper preparation
and application of the coating system. Design was completed in
August 2026, setting the project on schedule for construction this
coming Winter.
The project includes abrasive blasting and recoating of the tank's
interior and exterior steel surfaces, containment during construction,
miscellaneous structural and safety improvements, replacement of
the altitude valve, electrical improvements, disinfection and testing,
and site restoration. Additional improvements include replacement of
the mixing system, valve exercising, and updated tower branding
and graphics. Together, these improvements will extend the service
Page 1 of 6
Item 4C
life of the 1.5-million-gallon tank, ensure compliance with industry
standards, and maintain the reliability of the City's water system.
Tower Branding and Graphics
During the February 2026 Winter Workshop, the City discussed
opportunities to update the appearance and branding of its elevated
storage tanks. Following the workshop, several graphic concepts
were developed for the Dove EST, including options incorporating
City of Southlake and Carroll ISD branding.
The proposed graphics were subsequently presented to City Council
for direction on the tank's exterior appearance and roof design.
• August 18, 2026: City Council provided direction regarding the
graphics to be displayed on the exterior face of the tank, which
included updating "SOUTHLAKE" and replacing the Carroll
Dragons as existing.
t3w
=HLAI 1'
J6
• September 01, 2026: City Council provided direction
regarding the roof graphics, which included adding
SOUTHLAKE + Shield + TEXAS on the Dove EST (shown
below):
Page 2 of 6
Item 4C
iy
The selected exterior graphics, including the "SOUTHLAKE" lettering
and associated design elements, have been incorporated into the
construction documents. The project also includes an additive
alternate for installation of the selected roof graphics.
Proposals
Solicitation of Proposals for this project began on August 24, 2026,
and competitive sealed proposals were received and opened on
September 24, 2026. The ten proposals received for this project are
shown in the tabulation below:
Base Proposal Additive Total
Amount Alternates
Five12 Painting & $ 732,000
Remodeling LLC $ 649,000 $ 83,500
OU Coatings, Inc. $ 835,000 $ 47,000 $ 882,00
O&A Classic Coatings and $ 830,500 $ 119,500 $ 950,000
Paintings Corporation
Tankez Coatings, Inc. $ 878,500 $ 114,500 $ 993,000
Dixie Painting & $ 1,001,836
Sandblasting, Inc. $ 868,336 $133,500
BRZ Coatings Inc. $ 955,000 $ 144,000 $ 1,099,000
&S Tank Services LLC $ 915,402 $ 203,000 $ 1,118,402
AMR Industrial Coatings, $ 1,165,000
Inc. $ 1,027,500 $ 137,500
Blastco Texas Inc. $ 1,467,155 $ 94,700 $ 1,561,855
CROM CFG Industries LLC $ 1,555,425 $ 154,445 $ 1,709,870
City staff reviewed and scored the ten proposals using best value
criteria as described in the project manual. The evaluation criteria for
this bid were the proposal price (50%); qualifications of key
personnel (10%); similar project experience (10%); quality of goods
and services (10%); proposer's reputation (5%); and project delivery
Page 3 of 6
Item 4C
schedule (15%). The evaluation of the proposals, qualifications and
references led to the recommendation of O&J Coatings, Inc. for this
project.
Although O&J Coatings, Inc. did not submit the lowest-priced
proposal, the firm was determined to provide the Best Value to the
City based on the evaluation criteria established in the project
manual. The evaluation considered not only price, but also the
qualifications of key personnel, experience with similar projects
especially local nearby municipalities, quality of services, reputation,
and proposed project delivery schedule. Based on the overall
evaluation, staff recommends awarding the construction contract to
O&J Coatings, Inc.
The base bid from O&J Coatings, Inc. totaled $835,000, with seven
additive alternates totaling $47,000. These added alternates include:
• Remove and Replace Mixing System
• Exercise Valves in Process Room
• Antenna Relocation and Containment Alteration
• Pressure Wash Concrete Pedestal
• Overflow Flaps
• Tower Sealing
• Roof Graphics
Staff is requesting authorization for a total amount not to exceed
$1,100,000, which includes the base bid, all seven additive
alternates, and $218,000 in construction contingency. The
contingency accounts for potential unforeseen conditions and
necessary repairs that may be identified during rehabilitation,
particularly once the existing coatings are removed and the
underlying steel surfaces are exposed.
Construction is anticipated to begin in December 2026. The Dove
EST will be temporarily taken offline during rehabilitation; however,
no interruptions to water service are anticipated. The contractor will
have 90 working days to complete the rehabilitation, with final
completion required no later than May 1, 2027, ahead of the
summer's peak water demand season.
Financial
Considerations: Funding for this project is included in the approved Capital
Improvements Program through the Utility Fund. The project has a
total budget of $3,000,000, consisting of $490,000 budgeted in FY
2025 for design and $2,510,000 in FY 2026 for construction. This
includes $225,000 allocated for graphic art.
Page 4 of 6
Item 4C
The City previously executed an engineering services agreement
with Bartlett & West, Inc. in the amount of $390,000 for design and
construction inspection services.
The proposed construction award to O&J Coatings, Inc. totals
$1,100,000, consisting of the $835,000 base bid, $47,000 in additive
alternates, and $218,000 in construction contingency.
The project budget includes $225,000 for graphic art associated with
the Dove water tower. Based on the ten proposals received, the
combined costs for exterior tower branding, including the roof
graphics ranged from $27,000 to $75,810. O&J Coatings, Inc.
proposed $15,000 for exterior tower graphics and $15,000 for roof
graphics, totaling $30,000. These costs are included in the proposed
$882,000 construction contract and are significantly below the
original graphics allowance.
Strategic Link: This item links to the City's Strategy Map strategic focus area of
Infrastructure and Development. It specifically relates to the City's
Objective, F2: Investing to Provide and maintain High-Quality Public
Assets.
Citizen Input/
Board Review: The City has provided project notifications to nearby residents and
other stakeholders regarding the anticipated rehabilitation activities.
Legal
Review: This is the standard construction services contract that has been
previously reviewed by the City Attorney.
Alternatives: The City Council may approve or deny the agreement.
Supporting
Documents: Attachment A: Bid Tabulation
Attachment B: Best Value Award Letter
Staff
Recommendation: Award the construction contract for the Dove Elevated Storage
Tank Rehabilitation Project to O&J Coatings, Inc in an amount not
to exceed $1,100,000.
Staff
Contact: Pritam Deshmukh, P.E., Director of Public Works
Jeff Ginn, P.E., City Engineer
Jimmy Sibert, P.E., Deputy City Engineer
Page 5 of 6
Item 4C
Josue Hernandez, P.E., Civil Engineer
Page 6 of 6
Attachment A
TABULATION OF BIDS
.-1 16111-1 -d I..— -I-'.,ft II. I -11,11,"1 I'll
PH,1-&S-H.k- I-P,v,IH I_H I.,M11, 76-
I'll P-h.- AII- 1.1 11-d,11-11111 cox 11 1111
75474
em P. 4PI-.- HP I H. U.-d PH,, U-d p0 Extension -d PH,, U-d PH,, E..I... U-d p0 Eaenzian I.-PH, E.PI... I.-p0 Eaenzian I.-P- E-i. U-d P- U-d P- E.H-.
BASE BID
..d $41-M $zI,..w $zI,.m $I"..Im $I"..Im -$ 71... $,1,
I I ='T'� ...... OH $--. 5°14,167,00 5117,000,00 $333,000.00 $5.11011. $5.1101100 5-1-1. $-000.00 51ss,000.o0 5.11-1. 52-35.o0 $277.335.00 $200,001 H0 $-00 $",-PH
I 1 15, ==Cl- -H,IsK SP6),--p-I.,..d 5300,000,00 $300000.00 5°11,0,100 5°111-1. SzeH. $2110... SM-0,00 SM-0,00 53-6,00 $3.1.31AI $-. 5-1-1. 5-39- $2-90100 $331- $331-1. $-. $24100100 $20,0o000 $--PH
4 1 H_R_.=_,Rlpl-FINH,R.1 I—rye NIH IHI woe $3-.00 53-M $97.43s00 $97.43s00 $37.00000 $37-IM $60,59500 $6059500 $7Z9O0 00 $700 $1%00000 $19,00000 $40,00000 W- $25,00000 $25,000 00 $30,000 00 $30-M 540,000,00 540,000 00
15
and xenriea 111�k. I eox xeplaamem..d xew III $I-. $11,000." Su,000.00 $4.900.0. W,-. $14,...00 $14,11.11 $40,Po0.00 W. $21,.... $21,....
d PI, COI
I I I $....I..0 M-. $34,000.11 $14 100.
$5,00000 52500.00 52500.00 $1-00 $1,000 00 $17960I00 $17960 00 51-HP $1,500,00 $%M.W 5-HP 5500000 $5900100 $40- $Z-w $,.-w I"W"o $-Io $3900`00
I- S-.I. W'.- I-. 56,000.00 I-. W- $16"'." $2.,...u. I-.Ho $2.,....
$..-`0I $I-. $10100I Ho $1000000 $1-.. $51-100 $2106500 $2106500 5100000 $11.01. $10- M.- WIPM $4-00 WDIII WHIII $10-1 $11-1. $101-1. $10,220-00-
1� $7100..0 111—. $41 S.- S-.00 Ss,000.00 11noaao.ao $140,000.00 sis-W $I.,-
Mi
11 1 LI, -11 KEaxed.d.-1d-Ph1-'='C-- $"000,00 515,0o000 MOO- IWO- $1%00000 $1900.00 $35,65000 $31410 OH $111.0 OH $II-M $151-100 $151-100 $z01-100 W-HP $139oH. $13,o 1. 5111.01. 115000.00 530-00 530-.
12 1 L� $1, 11-. $s. I-. I-w I-. $'0'00000 $--P $,0,-. 111,- 111,— $1-1 111,— $'0'-w
Base Bid Subtotal: $1,027.5- $1-111- $911666.66 51sss,azs.00 $..,331.06 waa,o0o.o0 $911--W sa30'500'w $835.0-_ $878-.00
ADDITIV AIJERNXTIS
13 1 �Hd M.- 530-. $11100.00 $16,100.00 $37-11 53TOI0-M $56.175.00 $56.175.00 $31100I0I M"... $40.001`01 $40,001 HO $11000`0I $1-. $38,00000 $1.,-0. $2%00000 5-M $45,00000 $45,00000
14 1 1 $6... $6... "-. S-. s-. "'-w I_W S"-.
$ M-.. s,'-. SI-. Ss0,000.00 ISO-- Is- II-'. $-,. $'1'122 22$11'.. $110- $110- $1101111 $11 -0-1 5�111. - - -. W$ 35�00 $ 35�00 $ $7,50000 Ss-w - - A - . .W 5 H, $81100 $18,00000 $1. I 0. 51 $5,IIH $10,00000 $10.00
$7-. $7,..1.00 53sso.ao 539so.ao $1,sa. Ss,s00.00 sI'-. sI'-. 53,000.00 53,000.00 S-W S-W s-'. 53,000.0o S-'. I-
1. 1 IS $I1000.00 $I100III $I10IIII 51L-1. $II-I $11-1 52900,00 $2900H 53,000M 53,000M $,-PH $3A00 OH $1.10o0 00 Ilk-00 51- $2.00000 510o0o0 SLO.W
-.0
11 1 ea W 1h. I-oom- eontan $W.00 Ssa,aaa.aa $310W.00 535,.II.00 $00.oH "I,-. s41,110..0 S40,160..0 III,- III- $4.,...u. $4..11
Additive Alternates Subtotal: s13c5dop, $.7- $-H, $-,-HH H $--. 141,.6 511°I-6
Base Bij +Additi-Alternates s"'I"oo- $1,-,-W1 1 S1,713%.7.n. $l aoi eBB.00 1 1 1711,--1 1 1 V, 401.rr 1 $982,000,00 1
Attachment B
SOUTHLAKE
PUBLIC WORKS
Public Works Administration
1400 Main Street Suite 320 1 Southlake, Texas 76092 1 (p) (817) 748-8098
October 16, 2026
J Arturo Andrade
0&J Coatings, Inc.
1720 Cynthia Lane
Hurst, TX 76054 if"
Re: Notice of Award: Dove Tank Rehabilitation-1.5 Million Gallon Composite Storage
Tank
mi�
Dear 0&J Coatings, Inc.:
Your firm has been determined to meet the best value by the Owner for the contract of the
referenced Project, including the additive alternates, in the amount of Eight Hundred Eighty Two
Thousand Dollars ($882,000.00), based on the City's tabulation of the submitted bid item
amounts.The construction contract is scheduled for consideration at the November 17, 2026 City
Council Meeting. To assist you in properly executing the documents, we have listed below the
items requiring yourattention.
Please print out and sign three 3 of each of the items listed below and deliver the signed original
copies to Bartlett &West, Inc. no later than Wednesday, November 4, 2026.
Carlo Medina, PE
Bartlett&West, Inc.
4500 Mercantile Plaza Dr, Suite 230
Fort Worth,TX 76137
These will then be inserted into the contract and sent to the Owner for their final execution.
NOTE: Please DO NOT date the contract agreement or bonds as this will be done by the
Owner when executed.
1. Item 6:Construction Contract:Contractor name and a signature of the Contractor's
representative is required;attached evidence of authority to sign. The signature isto be
attested.
2. Item 7: Performance Bond: The bond is to be signed by the Contractor's representative
and an authorized representative of your Surety Company.Corporate sealsfor both firms
are to be affixed.A copy of the power of attorney is to be attached for the person signing
for the Surety Company.
3. Item 8: Payment Bond: Same as for the Performance Bond.
4. Item 9:Maintenance Bond:Same asforthe Performance and Payment Bonds.
NOTE—Signatures on the Maintenance Bond need to be attested.
5. Item 10: Certificate of Insurance: You must attach a copy of your certificate of insurance,
verifying that your insurancecoverage(s)complies with the requirements of the Contract
Documents. Please make sure that the City ofSouthlake and Bartlett & West, Inc. are
Page 1 of 2
Innovation 0 Integrity 0 Accountability 0 Commitment to Excellence 0 Teamwork
www.cityofsouthlake.com
listed as an additional insured on the certificate.
6. Form 1295: Once the item is included on the upcoming Council Agenda for award
(approximately two weeks before award date), you will receive an email from the City's
Purchasing Department to fill out this form on the State website. Purchasing will provide
information required to match City Records on this email.
Items needed prior to Preconstruction Meeting:
7. Key Personnel: Provide a list of personnel who will havethe primary responsibility for each
task and phase of the Project and corresponding contact information (Name, Email, Phone
Number).
8. List of Subcontractors: Provide a full list of contractors expected to be on site for this
project and the dollar value of their expected contribution to the project.
9. Contractor's Proposed Schedule: Provide detailed schedule outlining major items of work
on the project. Contract specifies project completion within 90 Working Days from
written notice to proceed, with final completion no later than May 1, 2027.
Items needed prior to processing first Pay Application:
10. Schedule of Values for all awarded lump-sum bid items, including additional
breakdowns for items where partial progress payments are anticipated. The schedule
will be used to verify monthly construction progress and applications for payment.
11. Proposed format template of Pay Application.
o City of Southlake only has a standard cover sheet that is utilized to summarize Pay
Applications.
If you need additional information or clarification in executing the document, please let us know.
Sincerely,
Josue A. Hernandez, PE
Civil Engineer— Project Manager
City of Southlake
CC
Jeff Ginn, PE, City of Southlake
Jimmy Sibert, PE, City of Southlake
Lee Halencak, PE, Bartlett &West, Inc.
Carlo Medina, PE, Bartlett &West, Inc.
Page 2 of 2