Item 4C - Memo CITY OF SOUTH LAKE Item 4C MEMORANDUM October 26, 2026 To: Alison Ortowski, City Manager From: Pritam Deshmukh, Director of Public Works Subject: Award the construction contract for the Dove Elevated Storage Tank Rehabilitation Project, to O&J Coatings, Inc in an amount not to exceed $1,100,000. Action Requested: Award the construction contract for the Dove Elevated Storage Tank (EST) Rehabilitation Project to O&J Coatings, Inc in an amount not to exceed $1,100,000. Background Information: The rehabilitation of an elevated storage tank is a preventative maintenance service intended to preserve and protect City infrastructure. This work will extend the service life of the Dove EST, maintain its appearance, and ensure the City continues to provide high-quality public assets. The Dove EST was originally constructed in 1986 and last repainted in 2007. Protective coating systems on elevated storage tanks are typically renewed approximately every 20 years as part of routine preventative maintenance. With the tank approaching this maintenance interval, the City is proceeding with rehabilitation to preserve the existing structural steel, protect against corrosion, and extend the service life of the 1.5-million-gallon tank. To prepare for this rehabilitation, the City executed an engineering services agreement with Bartlett &West, Inc. in December 2025 that includes on-site inspection services to ensure proper preparation and application of the coating system. Design was completed in August 2026, setting the project on schedule for construction this coming Winter. The project includes abrasive blasting and recoating of the tank's interior and exterior steel surfaces, containment during construction, miscellaneous structural and safety improvements, replacement of the altitude valve, electrical improvements, disinfection and testing, and site restoration. Additional improvements include replacement of the mixing system, valve exercising, and updated tower branding and graphics. Together, these improvements will extend the service Page 1 of 6 Item 4C life of the 1.5-million-gallon tank, ensure compliance with industry standards, and maintain the reliability of the City's water system. Tower Branding and Graphics During the February 2026 Winter Workshop, the City discussed opportunities to update the appearance and branding of its elevated storage tanks. Following the workshop, several graphic concepts were developed for the Dove EST, including options incorporating City of Southlake and Carroll ISD branding. The proposed graphics were subsequently presented to City Council for direction on the tank's exterior appearance and roof design. • August 18, 2026: City Council provided direction regarding the graphics to be displayed on the exterior face of the tank, which included updating "SOUTHLAKE" and replacing the Carroll Dragons as existing. t3w =HLAI 1' J6 • September 01, 2026: City Council provided direction regarding the roof graphics, which included adding SOUTHLAKE + Shield + TEXAS on the Dove EST (shown below): Page 2 of 6 Item 4C iy The selected exterior graphics, including the "SOUTHLAKE" lettering and associated design elements, have been incorporated into the construction documents. The project also includes an additive alternate for installation of the selected roof graphics. Proposals Solicitation of Proposals for this project began on August 24, 2026, and competitive sealed proposals were received and opened on September 24, 2026. The ten proposals received for this project are shown in the tabulation below: Base Proposal Additive Total Amount Alternates Five12 Painting & $ 732,000 Remodeling LLC $ 649,000 $ 83,500 OU Coatings, Inc. $ 835,000 $ 47,000 $ 882,00 O&A Classic Coatings and $ 830,500 $ 119,500 $ 950,000 Paintings Corporation Tankez Coatings, Inc. $ 878,500 $ 114,500 $ 993,000 Dixie Painting & $ 1,001,836 Sandblasting, Inc. $ 868,336 $133,500 BRZ Coatings Inc. $ 955,000 $ 144,000 $ 1,099,000 &S Tank Services LLC $ 915,402 $ 203,000 $ 1,118,402 AMR Industrial Coatings, $ 1,165,000 Inc. $ 1,027,500 $ 137,500 Blastco Texas Inc. $ 1,467,155 $ 94,700 $ 1,561,855 CROM CFG Industries LLC $ 1,555,425 $ 154,445 $ 1,709,870 City staff reviewed and scored the ten proposals using best value criteria as described in the project manual. The evaluation criteria for this bid were the proposal price (50%); qualifications of key personnel (10%); similar project experience (10%); quality of goods and services (10%); proposer's reputation (5%); and project delivery Page 3 of 6 Item 4C schedule (15%). The evaluation of the proposals, qualifications and references led to the recommendation of O&J Coatings, Inc. for this project. Although O&J Coatings, Inc. did not submit the lowest-priced proposal, the firm was determined to provide the Best Value to the City based on the evaluation criteria established in the project manual. The evaluation considered not only price, but also the qualifications of key personnel, experience with similar projects especially local nearby municipalities, quality of services, reputation, and proposed project delivery schedule. Based on the overall evaluation, staff recommends awarding the construction contract to O&J Coatings, Inc. The base bid from O&J Coatings, Inc. totaled $835,000, with seven additive alternates totaling $47,000. These added alternates include: • Remove and Replace Mixing System • Exercise Valves in Process Room • Antenna Relocation and Containment Alteration • Pressure Wash Concrete Pedestal • Overflow Flaps • Tower Sealing • Roof Graphics Staff is requesting authorization for a total amount not to exceed $1,100,000, which includes the base bid, all seven additive alternates, and $218,000 in construction contingency. The contingency accounts for potential unforeseen conditions and necessary repairs that may be identified during rehabilitation, particularly once the existing coatings are removed and the underlying steel surfaces are exposed. Construction is anticipated to begin in December 2026. The Dove EST will be temporarily taken offline during rehabilitation; however, no interruptions to water service are anticipated. The contractor will have 90 working days to complete the rehabilitation, with final completion required no later than May 1, 2027, ahead of the summer's peak water demand season. Financial Considerations: Funding for this project is included in the approved Capital Improvements Program through the Utility Fund. The project has a total budget of $3,000,000, consisting of $490,000 budgeted in FY 2025 for design and $2,510,000 in FY 2026 for construction. This includes $225,000 allocated for graphic art. Page 4 of 6 Item 4C The City previously executed an engineering services agreement with Bartlett & West, Inc. in the amount of $390,000 for design and construction inspection services. The proposed construction award to O&J Coatings, Inc. totals $1,100,000, consisting of the $835,000 base bid, $47,000 in additive alternates, and $218,000 in construction contingency. The project budget includes $225,000 for graphic art associated with the Dove water tower. Based on the ten proposals received, the combined costs for exterior tower branding, including the roof graphics ranged from $27,000 to $75,810. O&J Coatings, Inc. proposed $15,000 for exterior tower graphics and $15,000 for roof graphics, totaling $30,000. These costs are included in the proposed $882,000 construction contract and are significantly below the original graphics allowance. Strategic Link: This item links to the City's Strategy Map strategic focus area of Infrastructure and Development. It specifically relates to the City's Objective, F2: Investing to Provide and maintain High-Quality Public Assets. Citizen Input/ Board Review: The City has provided project notifications to nearby residents and other stakeholders regarding the anticipated rehabilitation activities. Legal Review: This is the standard construction services contract that has been previously reviewed by the City Attorney. Alternatives: The City Council may approve or deny the agreement. Supporting Documents: Attachment A: Bid Tabulation Attachment B: Best Value Award Letter Staff Recommendation: Award the construction contract for the Dove Elevated Storage Tank Rehabilitation Project to O&J Coatings, Inc in an amount not to exceed $1,100,000. Staff Contact: Pritam Deshmukh, P.E., Director of Public Works Jeff Ginn, P.E., City Engineer Jimmy Sibert, P.E., Deputy City Engineer Page 5 of 6 Item 4C Josue Hernandez, P.E., Civil Engineer Page 6 of 6 Attachment A TABULATION OF BIDS .-1 16111-1 -d I..— -I-'.,ft II. I -11,11,"1 I'll PH,1-­&S-H.k- I-P,v,IH I_H I.,M11, 76- I'll P-h­.- AII- 1.1 11-d,11-11111 cox 11 1111 75474 em P. 4PI-.- HP I ­H­. U.-d PH,, U-d p0 Extension -d PH,, U-d PH,, E..I... U-d p0 Eaenzian I.-PH, E.PI... I.-p0 Eaenzian I.-P- E-i. U-d P- U-d P- E.H-. BASE BID ..d $41-M $zI,..w $zI,.m $I"..Im $I"..Im ­ -$ 71... $,1, I I ='T'� ...... OH $--. 5°14,167,00 5117,000,00 $333,000.00 $5.11011. $5.1101100 5-1-1. $-000.00 51ss,000.o0 5.11-1. 52-35.o0 $277.335.00 $200,001 H0 $-00 $",-PH I 1 15, ==Cl- -H,IsK SP6),--p-I.,..d 5300,000,00 $300000.00 5°11,0,100 5°111-1. Sze­H. $2110... SM-0,00 SM-0,00 53-6,00 $3.1.31AI $-. 5-1-1. 5-39- $2-90100 $331- $331-1. $-. $24100100 $20,0o000 $--PH 4 1 H_R_.=_,Rlpl-FINH,R.1 I—rye NIH IHI woe $3-.00 53-M $97.43s00 $97.43s00 $37.00000 $37-IM $60,59500 $6059500 $7Z9O0 00 $7­00 $1%00000 $19,00000 $40,00000 W- $25,00000 $25,000 00 $30,000 00 $30-M 540,000,00 540,000 00 15 and xenriea 111�k. I eox xeplaamem..d xew III $I-. $11,000." Su,000.00 $4.900.0. W,-. $14,...00 $14,11.11 $40,Po0.00 W­. $21,.... $21,.... d PI, COI I I I $....I..0 M-. $34,000.11 $14 100. $5,00000 52500.00 52500.00 $1-00 $1,000 00 $17960I00 $17960 00 51-HP $1,500,00 $%M.W 5-HP 5500000 $5900100 $40- $Z-w $,.-w I"W"o $-Io $3900`00 I- S-.I. W'.- I-. 56,000.00 I-. W- $16"'." $2.,...u. I-.Ho $2.,.... $..-`0I $I-. $10100I Ho $1000000 $1-.. $51-100 $2106500 $2106500 5100000 $11.01. $10- M.- WIPM $4-00 WDIII WHIII $10-1 $11-1. $101-1. $10,220-00- 1� $7100..0 111—. $41 S.- S-.00 Ss,000.00 11noaao.ao $140,000.00 sis-W $I.,- Mi 11 1 LI, -11 KEaxed­.d.-1d-­Ph1-'='C-- $"000,00 515,0o000 MOO- IWO- $1%00000 $1900.00 $35,65000 $31410 OH $111.0 OH $II-M $151-100 $151-100 $z01-100 W-HP $139oH. $13,o 1. 5111.01. 115000.00 530-00 530-. 12 1 L� $1, 11-. $s­. I-. I-w I-. $'0'00000 $--P $,0,-. 111,- 111,— $1-1 111,— $'0'-w Base Bid Subtotal: $1,027.5- $1-111- $911666.66 51sss,azs.00 $..,331.06 waa,o0o.o0 $911--W sa30'500'w $835.0-_ $878-.00 ADDITIV AIJERNXTIS 13 1 �Hd M.- 530-. $11100.00 $16,100.00 $37-11 53TOI0-M $56.175.00 $56.175.00 $31100I0I M"... $40.001`01 $40,001 HO $11000`0I $1-. $38,00000 $1.,-0. $2%00000 5-M $45,00000 $45,00000 14 1 1 $6... $6... "-. S-. s-. "'-w I_W S"-. $ M-.. s,'-. SI-. Ss0,000.00 ISO-- Is- II-'. $-,. $'1'122 22$11'.. $110- $110- $1101111 $11 -0-1 5�111. - - -. W$ 35�00 $ 35�00 $ $7,50000 Ss-w - ­ - A - . .W 5 H, $81100 $18,00000 $1. I 0. 51 $5,IIH $10,00000 $10.00 $7-. $7,..1.00 53sso.ao 539so.ao $1,sa. Ss,s00.00 sI'-. sI'-. 53,000.00 53,000.00 S-W S-W s-'. 53,000.0o S-'. I- 1. 1 IS $I1000.00 $I100III $I10IIII 51L-1. $II-I $11-1 52900,00 $2900H 53,000M 53,000M $,-PH $3A00 OH $1.10o0 00 Ilk-00 51- $2.00000 510o0o0 SLO.W -.0 11 1 ea W 1h. I-oom- eontan $­W.00 Ssa,aaa.aa $310W.00 535,.II.00 $­00.oH "I,-. s41,110..0 S40,160..0 III,- III- $4.,...u. $4­..11 Additive Alternates Subtotal: s13c5dop, $.7- $-­H, $-,-HH H $--. 141,.6 511°I-6 Base Bij +Additi-Alternates s"'I"oo- $1,-,-W1 1 S1,713%.7.n. $l aoi eBB.00 1 1 1711,--1 1 1 V, 401.rr 1 $982,000,00 1 Attachment B SOUTHLAKE PUBLIC WORKS Public Works Administration 1400 Main Street Suite 320 1 Southlake, Texas 76092 1 (p) (817) 748-8098 October 16, 2026 J Arturo Andrade 0&J Coatings, Inc. 1720 Cynthia Lane Hurst, TX 76054 if" Re: Notice of Award: Dove Tank Rehabilitation-1.5 Million Gallon Composite Storage Tank mi� Dear 0&J Coatings, Inc.: Your firm has been determined to meet the best value by the Owner for the contract of the referenced Project, including the additive alternates, in the amount of Eight Hundred Eighty Two Thousand Dollars ($882,000.00), based on the City's tabulation of the submitted bid item amounts.The construction contract is scheduled for consideration at the November 17, 2026 City Council Meeting. To assist you in properly executing the documents, we have listed below the items requiring yourattention. Please print out and sign three 3 of each of the items listed below and deliver the signed original copies to Bartlett &West, Inc. no later than Wednesday, November 4, 2026. Carlo Medina, PE Bartlett&West, Inc. 4500 Mercantile Plaza Dr, Suite 230 Fort Worth,TX 76137 These will then be inserted into the contract and sent to the Owner for their final execution. NOTE: Please DO NOT date the contract agreement or bonds as this will be done by the Owner when executed. 1. Item 6:Construction Contract:Contractor name and a signature of the Contractor's representative is required;attached evidence of authority to sign. The signature isto be attested. 2. Item 7: Performance Bond: The bond is to be signed by the Contractor's representative and an authorized representative of your Surety Company.Corporate sealsfor both firms are to be affixed.A copy of the power of attorney is to be attached for the person signing for the Surety Company. 3. Item 8: Payment Bond: Same as for the Performance Bond. 4. Item 9:Maintenance Bond:Same asforthe Performance and Payment Bonds. NOTE—Signatures on the Maintenance Bond need to be attested. 5. Item 10: Certificate of Insurance: You must attach a copy of your certificate of insurance, verifying that your insurancecoverage(s)complies with the requirements of the Contract Documents. Please make sure that the City ofSouthlake and Bartlett & West, Inc. are Page 1 of 2 Innovation 0 Integrity 0 Accountability 0 Commitment to Excellence 0 Teamwork www.cityofsouthlake.com listed as an additional insured on the certificate. 6. Form 1295: Once the item is included on the upcoming Council Agenda for award (approximately two weeks before award date), you will receive an email from the City's Purchasing Department to fill out this form on the State website. Purchasing will provide information required to match City Records on this email. Items needed prior to Preconstruction Meeting: 7. Key Personnel: Provide a list of personnel who will havethe primary responsibility for each task and phase of the Project and corresponding contact information (Name, Email, Phone Number). 8. List of Subcontractors: Provide a full list of contractors expected to be on site for this project and the dollar value of their expected contribution to the project. 9. Contractor's Proposed Schedule: Provide detailed schedule outlining major items of work on the project. Contract specifies project completion within 90 Working Days from written notice to proceed, with final completion no later than May 1, 2027. Items needed prior to processing first Pay Application: 10. Schedule of Values for all awarded lump-sum bid items, including additional breakdowns for items where partial progress payments are anticipated. The schedule will be used to verify monthly construction progress and applications for payment. 11. Proposed format template of Pay Application. o City of Southlake only has a standard cover sheet that is utilized to summarize Pay Applications. If you need additional information or clarification in executing the document, please let us know. Sincerely, Josue A. Hernandez, PE Civil Engineer— Project Manager City of Southlake CC Jeff Ginn, PE, City of Southlake Jimmy Sibert, PE, City of Southlake Lee Halencak, PE, Bartlett &West, Inc. Carlo Medina, PE, Bartlett &West, Inc. Page 2 of 2 Innovation 0 Integrity 0 Accountability 0 Commitment to Excellence 0 Teamwork www.cityofsouthlake.com